Opendata, web and dolomites

HOBBIT project deliverables

The page lists 52 deliverables related to the research project "HOBBIT".

 List of Deliverables

HOBBIT: list of downloadable deliverables.
title and desprition type last update

D6.1.1 First Version of the Question Answering Benchmark

This deliverable will describe the first version of the question answering benchmark structured and statistical data streams. Moreover, baseline implementations provided by HOBBIT will be presented.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Other 2019-05-30

D7.1 First Preparations report

This deliverable presents the state of the preparations for the organization of the first series of evaluation campaigns and the first series of workshops (i.e., provide the number of interested parties for the challenge, baseline results etc.) including the preparations for the proceedings of the first series of workshops. The report will also cover an overview of first evaluations of the platform for its use in the challenges.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-05-30

D1.1.2 Intermediate community member list, use cases, and datasets

Based on the discussion on the preliminary version of the document (D.1.1.1), we incorporate feedback from the different partners to produce an intermediary community list that will serve as direct input for the first review. Each of the use cases will be validated and supported by at least two other members beside the use case submitter, in order to identify those use cases with maximum impact. All considered datasets will be validated in at least two use cases, and it will be clear how they can be obtained, and what the considerations are (privacy, license, practical usage aspects).

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-05-30

D8.1.1 Initial online presence

By M1 the domain and first version of the online presence of the Web page will go live.
An initial press release will be created informing about the project and the project objectives.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-05-30

D3.2.1 First Version of the Data Extraction Benchmark for unstructured data

This deliverable will describe the first version of the benchmark for unstructured data streams. Moreover, baseline implementations provided by HOBBIT will be presented.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Other 2019-05-30

D5.1.1 First version of the Data Storage Benchmark

This deliverable will provide a first version of the storage benchmark that will allow running typical data analytics queries on a variety of data stores (incl. NoSQL databases and native triple stores). Typical bulk loading scenarios will also be supported.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Other 2019-05-30

D5.2.1 First version of the Versioning Benchmark

This deliverable will describe the first version of the versioning benchmark for linked data with time series. Baseline implementations provided by HOBBIT will be presented.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Other 2019-05-30

D2.3.1 First Maintenance and Update report of the HOBBIT Platform

The first of two maintenance reports will summarize the execution of the first series of challenges from the perspective of the deployed platform. Bottlenecks (if any) will be identified and mitigation solutions will be presented. Analysis results (number of tasks carried out, throughput for different benchmarks, etc.) will be presented and summarize the performance of the platform.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-05-30

D4.1.1 First version of the linking benchmark

This deliverable will describe the first version of the linking benchmark for linked data with time series. Baseline implementations provided by HOBBIT will be presented.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Other 2019-05-30

D9.3 Quality Assurance & Risk Assessment Plan

It will incorporate details on the quality assurance processes adopted within the HOBBIT project. It will define all processes and instruments to be used for the regular quality monitoring and risk assessment in the form of a handbook for project partners.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-05-30

D1.1.1 Preliminary community member list, use cases, and datasets

This document details the preliminary state of the community, listing which parties are involved and which parties have expressed interest. It categorizes possible use cases, mentioning the interested parties. Use cases are linked to a list of datasets, which describes their contents, purpose, size, and expected growth. This document serves as a basis for further discussion and growth of the community, and as a precursor of the intermediary document D1.1.2.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-05-30

D9.1 Project Management Plan

The core management handbook and structure that will provide guidelines for the project manager and the project members to follow during the full cycle of the project. The handbook will set out the governance, project calendar, cluster and work package description and reporting roles and responsibilities for all partners. Moreover, it will define the communication mechanisms for the project’s partners and the templates for reporting and formal communication of the project’s activities and outcomes.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-05-30

D8.5.2 Intermediate data management plan

Based on the feedback on the initial plan, more concrete descriptions are added for specific types of incoming and outgoing data. The plan will be enriched with examples of datasets already in the system. We will additionally regulate reuse and exploitation, and specify how data curation and preservation will happen, and detail which data is shared with what external parties, and how such a process takes place.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Open Research Data Pilot 2019-05-30

D1.4 Reachout Strategy Plan

Setting up the association in T1.3 requires finding the right members, which will be contacted early on in the project. This document will describe concrete strategies the partners will use to attract members for the association. In particular, we consider two types of strategies. On the one hand, we want to participate in and promote existing challenges, in which medium and large companies are involved. On the other hand, we want to integrate challenge datasets into the HOBBIT platform, and launch open calls towards industry and academia to stimulate the usage of these datasets. Potential users can be convinced by providing temporary free access to the platform, as well as technical support.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-05-30

D2.1 Detailed Architecture of the HOBBIT Platform

This deliverable will be a report that will describe the results of T2.1. The architecture of the HOBBIT platform as well as the technologies used to ensure variable and scalable deployment will be described in detail in this paper. Moreover, the structure of the code repository for the platform will be explained. This will ensure that third-party contributions can be made early on in the project

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-05-30

D3.1.1 First Version of the Data Extraction Benchmark for Sensor Data

This deliverable will describe the first version of the extraction benchmark for semi-structured sensor data streams. Moreover, baseline implementations provided by HOBBIT will be presented.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Other 2019-05-30

D9.2.1 Annual Public Report of the first year

Report on the project’s progress, targeting the general public. The report will focus on the impact of the conducted work as well as exemplifying the contribution and importance of the HOBBIT project towards facing these challenges during the first year.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-05-30

D1.3.1 Preliminary Association mission statement and business scenarios

Before the association starts in M25, an initial mission statement is to be released, outlining a strategy for how the association intends to continue after the end of the project. At least 3 business scenarios will be analyzed, and a direction will be indicated for how the association can handle them. Each scenario will be analyzed pertaining to strengths, weaknesses, opportunities, and threats. The scenarios are to be supported by datasets in the HOBBIT platform (D1.1.2).

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-05-30

D1.2.1 Requirements specification from the community

The community documents the desired specifications for the benchmarking platform, based on joint discussions, and in particular the F2F meeting around M4. This serves as a direct input for T2.2 in which the first iteration of the platform is built.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-05-30

D8.5.1 Initial data management plan

As part of the pilot for open access to research data, we will provide a Data Management Plan in accordance to the H2020 Guidelines on Data Management, which will detail how we deal with data throughout the project. In particular, we need to explain what (types of) datasets will be incorporated into the HOBBIT platform, and how we will ensure anonymization and licensing issues. An overview of the different types data that will be generated by the platform will be included, as well as the data formats, standards, and conventions to store and exchange this data. This initial plan will highlight the important categories and challenges in a generic way.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Open Research Data Pilot 2019-05-30

D2.2.1 First version of the HOBBIT Platform

This report will be the first of two reports for the HOBBIT platform. In addition to the software and its code being made available online, we will provide a text report presenting (1) the structure of the platform as well as a user manual for the integration of novel benchmarks and (2) an evaluation of the platform itself. The report will be used to request contributions from third parties.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

D8.1.2 Project fact sheet, press releases and online presence

This deliverable comprises the initial promotion material, e.g., the fact sheet, the update website and first social media channels that could be used for the marketing of HOBBIT. A second press release (PR) will be prepared that will be translated to the partners’ national languages. The PR text will inform about the actual status, milestones and inform about the online channels. By M3 the full functionality of the website will be ready and connected with the other social media channels. A short report will summarize the initial efforts and document the dissemination KPIs.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-05-30

D4.2.1 First version of the data analytics benchmark

This deliverable will describe the first version of the data analytics benchmark for the structured machine learning benchmark. Baseline implementations provided by HOBBIT will be presented.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Other 2019-05-30

D6.2.1 First Version of the Faceted Browsing Benchmark

This deliverable will describe the first version of the faceted browsing benchmark for combinations of geospatial, temporal and structured data streams. Moreover, baseline implementations provided by HOBBIT will be presented.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Other 2019-05-30

D8.2 First dissemination report

After the first half of the project we will summarize the dissemination work and evaluated our efforts against the defined KPIs. In case we do not achieve our goals, we strive to develop suitable methods to reach our objects until project end.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-05-30

D3.2.2 Second Version of the Data Extraction Benchmark for unstructured data

This deliverable will describe the second version of the extraction benchmark for unstructured data streams. Moreover, improved baseline implementations provided by HOBBIT will be presented.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Other 2019-04-16

D7.4 Second workshop proceedings

This deliverable includes the workshop proceedings for the second campaign.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-04-16

D7.2.2 Second workshop organization report

This deliverable includes a report focusing on the organization of the workshops.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-04-16

D3.1.2 Second Version of the Data Extraction Benchmark for Sensor Data

This deliverable will describe the second version of the extraction benchmark for semi-structured sensor data streams. Moreover, improved baseline implementations provided by HOBBIT will be presented.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Other 2019-04-16

D8.5.3 Final data management plan

The intermediary data management plan will be validated against the needs and practices that have become clear during the project. Any updates to the data management plan of D8.5.2 will be clearly indicated and motivated. Particular emphasis will be given to data generated by the system, as the amount of this data will have increased significantly since the first version of this document. Finally, we will consider whether a deletion strategy is appropriate for parts of the incoming or outgoing data.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Open Research Data Pilot 2019-04-16

D8.3 Final dissemination report

With the project end, will summarize all dissemination efforts and verify them against the defined KPIs. All these information are included in the final dissemination report.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-04-16

D5.1.2 Second version of the Data Storage Benchmark

This deliverable will provide an extension of the first benchmark in which more complex interdependencies between the generated data items will be modelled (e.g., second-order collocations between entities). This benchmark will also allow running typical data analytics queries as well as bulk loading and querying scenarios on a variety of storage solutions.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Other 2019-04-16

D7.3.2 Second challenge results overview

This deliverable is the overview report of the second campaign, which will present the best technologies developed during this campaign and summarize the main outcomes and achievements.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-04-16

D8.4 Standardization report

In a short report, we sum up our observations regarding related standardization efforts (T8.3) and potential support on the part of HOBBIT.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-04-16

D9.2.3 Annual Public Report of the third year

Report on the project’s progress, targeting the general public. The report will focus on the impact of the conducted work as well as exemplifying the contribution and importance of the HOBBIT project towards facing these challenges during the third year.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-04-16

D1.3.2 Final Association mission statement and business scenarios

When the formation of the association is coming to a conclusion, a final version of the mission statement is to be released, detailing a) how the association will continue after the end of the project and b) how the association intends to be self-sustaining. In order to substantiate point b), 3 to 5 business scenarios will be analyzed with a concrete implementation plan using the benchmarking platform.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-04-16

D2.3.2 Second Maintenance and Update report of the HOBBIT Platform

The second maintenance reports will summarize the execution of the second series of challenges from the perspective of the deployed platform. The focus will be on a careful analysis of the measures for the platform and the suggestions for future extensions of the platform.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-04-16

D7.2.1 First workshop organization report

This deliverable includes a report focusing on the organization of the workshops.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-04-16

D9.2.2 Annual Public Report of the second year

Report on the project’s progress, targeting the general public. The report will focus on the impact of the conducted work as well as exemplifying the contribution and importance of the HOBBIT project towards facing these challenges during the second year.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-04-16

D7.4.2 Second challenge evaluation

This deliverable will summarize the evaluation of the second campaign and their organization, based on participants reviews.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-04-16

D4.2.2 Second version of the data analytics benchmark

This deliverable will describe the second version of the data analytics benchmark for the structured machine learning benchmark. Baseline implementations provided by HOBBIT will be presented.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Other 2019-04-16

D2.2.2 Second version of the HOBBIT Platform

This report will be the second of two software reports for the HOBBIT platform. Like in the first report, we will make the software and its code available online as well as provide a text report presenting the updated structure of the platform. The user manual for the integration of novel benchmarks will be extended with an updated evaluation. The report will be used as a manifesto by the HOBBIT organization (see WP1) to invite more parties into the organization.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Other 2019-04-16

D7.2 First workshop proceedings

This deliverable includes the workshop proceedings for the first campaign.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-04-16

D7.3.1 First challenge results overview

This deliverable is the overview report of the first campaign, which will present the best technologies developed during this campaign and summarize the main outcomes and achievements.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-04-16

D5.2.2 Second version of the Versioning Benchmark

This deliverable will describe the second version of the versioning benchmark for linked data with time series. Baseline implementations provided by HOBBIT will be presented.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Other 2019-04-16

D7.4.1 First challenge evaluation

This deliverable will summarize the evaluation of the first campaign and their organization, based on participants reviews.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-04-16

D1.1.3 Final community member list, use cases, and datasets

At the end of T1.1, the community will have matured sufficiently to generate an updated version of D1.1.2 with the final list of members, use cases, and datasets. Based on the feedback of the first review, we will compile the finalized version of the document. A dedicated section will specify differences from D1.1.2, in particular whether parties who expressed interest have joined and what their motivations were for (not) doing so. Any new use cases will satisfy the same requirements as in D1.1.2.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-04-16

D6.2.2 Second Version of the Faceted Browsing Benchmark

This deliverable will describe the second version of the faceted browsing benchmark for combinations of geospatial, temporal and structured data streams. Moreover, improved baseline implementations provided by HOBBIT will be presented.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Other 2019-04-16

D1.2.2 Requirements specification from the association

One of the initial tasks of the association is to decide to what extent the requirements from D1.2.1 are relevant for the next phase. Furthermore, the existence of a prototype will allow to verify how the requirements of D.1.2.1 have been translated into practice, allowing a) adjustments where necessary b) the identification of additional requirements that were not considered at first by the community.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-04-16

D4.1.2 Second version of the linking benchmark

This deliverable will describe the second version of the linking benchmark for linked data with time series. Improved baseline implementations provided by HOBBIT will be presented.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Other 2019-04-16

D6.1.2 Second Version of the Question Answering Benchmark

This deliverable will describe the second version of the question answering benchmark for structured and statistical data streams. Moreover, improved baseline implementations provided by HOBBIT will be presented.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Other 2019-04-16

D7.1.3 Second Preparations report

This deliverable presents the state of the preparations for the organization of the second series of evaluation campaigns and the second series of workshops (i.e., provide the number of interested parties for the challenge, baseline results etc.) including the preparations for the proceedings of the second series of workshops. The report will also cover an overview of second evaluations of the platform for its use in the challenges.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-16-2015

download deliverable 

Documents, reports 2019-04-16