The page lists 16 deliverables related to the research project "SafeLog".
title and desprition | type | last update |
---|---|---|
System Integration Test CasesDetailed definition of system integration test cases. Programme: H2020-EU.2.1.1. - Topic(s): ICT-24-2015 |
Documents, reports | 2020-02-07 |
Multi-objective multi-constrained large-scale planningThis demostrator will present functionality and key properties of the multi-objective multi-constrined large-scale planning algorithms developed within WPT-3.2. Programme: H2020-EU.2.1.1. - Topic(s): ICT-24-2015 |
Demonstrators, pilots, prototypes | 2020-02-07 |
System Integration Test PlanSummary of system integration test requirements. Programme: H2020-EU.2.1.1. - Topic(s): ICT-24-2015 |
Documents, reports | 2020-02-07 |
Prototype demonstrator of AR based interaction conceptsThis demonatrator will show first prototype of the named AR based interaction concepts in D-4.4.1-Concepts of AR based interaction with the system [M21] Programme: H2020-EU.2.1.1. - Topic(s): ICT-24-2015 |
Demonstrators, pilots, prototypes | 2020-02-07 |
Dissemination Report IThe Dissemination report will contain an overview containing all activities related to the publication and communication to relevant bodies of interest concerning SafeLog topics. Programme: H2020-EU.2.1.1. - Topic(s): ICT-24-2015 |
Documents, reports | 2020-02-07 |
Implementation of the human intention recognition systemImplementation of simple gesture control, leaving intention recognition and path decision recognition. Programme: H2020-EU.2.1.1. - Topic(s): ICT-24-2015 |
Demonstrators, pilots, prototypes | 2020-02-07 |
Human-aware planningThis demostrator will present functionality and key properties of the human-aware planning algorithm developed in WPT-3.4. Programme: H2020-EU.2.1.1. - Topic(s): ICT-24-2015 |
Demonstrators, pilots, prototypes | 2020-02-07 |
Prototype demonstrator of 2D/3D-GUI interaction conceptsThis demonatrator will show first prototype of the named interaction concepts in D-4.3.1-Concepts of intuitive 2D/3D interaction with the system [M21]. Programme: H2020-EU.2.1.1. - Topic(s): ICT-24-2015 |
Demonstrators, pilots, prototypes | 2020-02-07 |
Guidelines for Personal Safety in Flexible Automated WarehousesSelection of norms and European directives for development of systems for ensuring safety of personnel in flexible automated warehouses with AGVs. Programme: H2020-EU.2.1.1. - Topic(s): ICT-24-2015 |
Documents, reports | 2020-02-07 |
Data management plan (DMP)The Data Management Plan (DMP) will list relevant data that accumulates during the project and will define how we handle that data properly. It will be generated in dependence on the document „Guidelines on Data Management in Horizon 2020“. Programme: H2020-EU.2.1.1. - Topic(s): ICT-24-2015 |
Documents, reports | 2020-02-07 |
Planning task specificationThis deliverable will describe definition of the path planning task and specification of interfaces to all other components of the warehouse as specified in WPT-3. Programme: H2020-EU.2.1.1. - Topic(s): ICT-24-2015 |
Documents, reports | 2020-02-07 |
Events, Seminars and Conferences- Organization of 3-6 seminars, presentations and/or special sessions at conferences. Programme: H2020-EU.2.1.1. - Topic(s): ICT-24-2015 |
Documents, reports | 2020-02-07 |
Scenario and Use-Case DefinitionThis deliverable will describe the end-user scenarios and use-cases. Programme: H2020-EU.2.1.1. - Topic(s): ICT-24-2015 |
Documents, reports | 2020-02-07 |
Promotional MaterialTo spread information: Programme: H2020-EU.2.1.1. - Topic(s): ICT-24-2015 |
Websites, patent fillings, videos etc. | 2020-02-07 |
Web SiteThe SafeLog web portal will be used as dissemination platform. It will provide information about the project (short description of the objectives and concepts). Programme: H2020-EU.2.1.1. - Topic(s): ICT-24-2015 |
Websites, patent fillings, videos etc. | 2020-02-07 |
A simulation-based test environment for a heterogeneous warehouse system - version 1This demonstrator will show a first prototype of the simulation-based test environment for a heterogeneous warehouse system. This first prototype will be used for further development. Programme: H2020-EU.2.1.1. - Topic(s): ICT-24-2015 |
Other | 2020-02-07 |