Opendata, web and dolomites

UNEXMIN project deliverables

The page lists 36 deliverables related to the research project "UNEXMIN".

 List of Deliverables

UNEXMIN: list of downloadable deliverables.
title and desprition type last update

Brochures

Brochures - many

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Websites, patent fillings, videos etc. 2020-03-27

Pilot Report from Idrija mine

Pilot Report from Idrija mine

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Open Research Data Pilot 2020-03-27

3D simulation releases /Youtube/

3D simulation releases /Youtube or other video sharing platform/

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Websites, patent fillings, videos etc. 2020-03-27

Geoscientific evaluation of Pilots and promotional materials

Geoscientific evaluation of Pilots and promotional materials

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Open Research Data Pilot 2020-03-27

New Company / “NewCo”

For direct commercial exploitation a New Company (NewCo) will be created as a spin-off based on the UNEXMIN knowledge pool.

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Other 2020-03-27

Project reports

Project reports

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Documents, reports 2020-03-27

Three-dimensional Visualisation Software Suite Final version

hree-dimensional Visualisation Software Suite Final version

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Websites, patent fillings, videos etc. 2020-03-27

Field pilot documentary releases /Youtube/

Field pilot documentary releases /Youtube - or other webbased video sharing platform/

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Websites, patent fillings, videos etc. 2020-03-27

Research roadmap

Research roadmap

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Documents, reports 2020-03-27

Pilot Report from Ecton mine

Pilot Report from Ecton mine

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Open Research Data Pilot 2020-03-27

Scientific publications, presentations, posters

Scientific publications, presentations, posters

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Other 2020-03-27

Pilot Report from Urgeiriça Mine

Pilot Report from Urgeiriça Mine

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Open Research Data Pilot 2020-03-27

Physical and virtual reality models of surveyed mines

Physical and virtual reality models of surveyed mines

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Open Research Data Pilot 2020-03-27

Technology Brokerage

Technology Brokerage

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Other 2020-03-27

Press-releases and media kits

Press-releases and media kits

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Websites, patent fillings, videos etc. 2020-03-27

Data Management/Analysis Software Suite Final version

Data Management/Analysis Software Suite Final version

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Websites, patent fillings, videos etc. 2020-01-29

Real environment test report of instrumentation units

Instruments originally tested in D2.3 will also be tested in a real-world environment, in a flooded mine in the North-East part of Hungary during a 5-day field mission

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Documents, reports 2020-01-29

Pilot Report from Kaatiala mine

Pilot Report from Kaatiala mine

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Open Research Data Pilot 2020-01-29

Research Roadmapping Workshop

Research Roadmapping Workshop

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Other 2020-01-29

Stakeholder engagement protocol

The types and overall profile of project stakeholders will be identified, engagement protocol going to be prepared.

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Documents, reports 2020-01-29

Stakeholder requirement specifications

Project stakeholders and prospective future customers will together set the final user requirements for the Surveyor. Specifications will be defined.

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Documents, reports 2020-01-29

Robotic platform prototype technical and mission specifications

COnversion of WP5 requirement specifications and related robotic functions into detailed conceptual subsystem solutions for the prototype robotic platform

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Documents, reports 2020-01-29

Robotic platform prototype requirement specification

Conversion of WP5 requirement specifications and related robotic functions into an overall architecture design of the multi-robot mine explorer system

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Documents, reports 2020-01-29

Sensors Acquisition and registration software prototype

Software prototype of Sensors Acquisition and registration

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Documents, reports 2020-01-29

Inventory of flooded mines

An on-line, public access inventory will be created of potential target mines in Europe. Primary focus will be on mines that cannot be surveyed by any other means due to complex typology or a range of depth that is below the range of scuba divers (max 50 m). Existing databases will be reviewed, Missing data will then be collected from mine authorities covering at least 24 countries, in which EFG members are present (Third Party contribution) also mobilising public access data available via Eurogeosurveys.

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Websites, patent fillings, videos etc. 2020-01-29

UX-1 Robot mechanics documentation

UX-1 Robot mechanics documentation

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Documents, reports 2020-01-29

Database specifications manual

Specification of database, data analysis, and visualisation software. Definition of required software programs/modules/components for integration of recorded data into a consistent and reliable database

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Documents, reports 2020-01-29

Report on the prototype design validation workshop

The prototype design will be validated by the project stakeholders (in particular future users and customers), the consortium and the project Advisory Board. This activity will be carried out at a dedicated workshop, during which conceptual designs and simulations will be presented. The Prototype validation workshop will be connected with a project meeting (M12).

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Documents, reports 2020-01-29

Data Management Plan

Data Management Plan

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Documents, reports 2020-01-29

Technology Appraisal Workshop

Technology Transfer Workshop

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Other 2020-01-29

Final project website

Final project website

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Websites, patent fillings, videos etc. 2020-01-29

Parameter framework report

The parameter framework will utilise input from WP3 taking into account of stakeholder requirements. The parameter framework will also determine the set of instruments that are available for the targeted applications, and identifies market availability and suitability for further development, adaptation and/or integration.

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Documents, reports 2020-01-29

Laboratory test reports of instrumentation units

Using the design specifications from WP1 a series of integration steps for the scientific instruments will be carried out considering all HW and SW components. Each component modules will be evaluated first in order to determine their workability in simulated environment, and also a calibration methodology will be developed.

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Documents, reports 2020-01-29

General interface specification report

The instruments selected for integration will have various power and data specifications, which will need to be harmonised in order to be compatible with robot’s general systems (data flow, power supplies, weight restrictions, etc), and also need to be able to provide a general interface standard for future sensor connectivity in an open source format.

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Documents, reports 2020-01-29

UX-1 Robot Software Architecture Report

Report on UX-1 Robot Software Architecture

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Documents, reports 2020-01-29

Basic project website

Basic project website

Programme: H2020-EU.3.5.3. - Topic(s): SC5-11d-2015

download deliverable 

Websites, patent fillings, videos etc. 2020-01-29