The page lists 41 deliverables related to the research project "SMARTER TOGETHER".
title and desprition | type | last update |
---|---|---|
D4.1.3 Smart City Munich Lighthouse ProjectDocumentation of activities and achievements. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D6.1.1 Monitoring and evaluation manualMonitoring and Evaluation Manual and Evaluation templates. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D7.4.3 Integrated Replication Strategy VeniceIntegrated Replication Strategy Venice. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D4.5.1 Mobility stationsMobility Stations implemented. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Demonstrators, pilots, prototypes | 2020-02-25 |
D3.3.2 Final report on the low- energy district achievements – zero carbon objectiveFinal report on the low- energy district achievements – zero carbon objective Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D8.2.1 Report on the outputs of the Club of CitiesReport on the outputs of the Club of Cities. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D3.7.1 Summary and conclusions of Lyon Lighthouse project for replicationSummary and conclusions of Lyon Lighthouse project for replication. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D3.5.3 Final report on sustainable mobility achievementsFinal report on sustainable mobility achievements. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D2.1.2 Report on knowledge exchange workshop 2This deliverable will outline the outputs of the second knowledge exchange workshop to be performed in M18 of task 2.1 and all associated engagement activities of task 2.1.2, further developing the thematic recommendations for co-created smart city solutions to be finalized within D2.1.3. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D8.1.1 Replication frameworkReplication framework. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D.3.4.3 Final report on the connected district achievementsFinal report on the connected district achievements. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D2.1.3 Thematic recommendations and Exchange workshop report 3This deliverable will outline the outputs of the third and last knowledge exchange workshop to be performed in M24 of task 2, all associated engagement activities of task 2.1.2, and the final set of thematic recommendations for co-created smart city solutions. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D3.4.1 Full operational Community Management SystemFull operational Community Management System. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Other | 2020-02-25 |
D.5.5.2 Mobility pointDesign and installation report. (LTP NeuMo in the lead for WSTW) Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Demonstrators, pilots, prototypes | 2020-02-25 |
D8.4.1 Handbook Smart City business model innovationHandbook Smart City business model innovation. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D3.2.1 Final report on stakeholder involvement in the Lyon Lighthouse cityFinal report on stakeholder involvement in the Lyon Lighthouse city Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D4.5.2 e-mobilitye-mobility and smart mobility management systems implemented. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Demonstrators, pilots, prototypes | 2020-02-25 |
D4.4.1 Smart data platformSmart data platform deployed and integrated with sensor data from lampposts, heating control, smart access, smart services, etc. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Demonstrators, pilots, prototypes | 2020-02-25 |
D5.5.1 e-mobility in Simmering NWe-mobility in Simmering NW, report on all new e-mobility services and activities and their integration into a local mobility strategy. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Demonstrators, pilots, prototypes | 2020-02-25 |
D3.3.3 Buildings refurbished and renewable energy systems commissionedBuildings refurbished and renewable energy systems commissioned Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Demonstrators, pilots, prototypes | 2020-02-25 |
D4.1.2 Implementation reports and blueprints1. Implementation report for sustainable district refurbishment towards high energy efficient residential buildings and a blueprint for further refurbishment measures. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D7.4.2 Integrated Replication Strategy Santiago de CompostelaIntegrated Replication Strategy Santiago de Compostela. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D4.2.1 Smart City CatalystStakeholder reports, summary of co-design processes, methods and results. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Demonstrators, pilots, prototypes | 2020-02-25 |
D6.1.2 Evaluation templatesMonitoring and Evaluation Manual and Evaluation templates. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D2.1.1 Report on knowledge exchange workshop 1This deliverable will outline the outputs of the first knowledge exchange workshop to be performed in M12 of task 2.1 and all associated engagement activities of task 2.1.2, further building a first basis for the thematic recommendations for co-created smart city solutions to be presented within D2.1.3. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D9.3.1 WebsiteWebsite. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Websites, patent fillings, videos etc. | 2020-02-25 |
D3.3.1 Report on Study of PV self-consumption on B2 plotReport on Study of PV self-consumption on B2 plot Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D3.4.2 Report on deployment of LINKY smart power meters in the areaReport on deployment of LINKY smart power meters in the area. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D3.5.1 New EV car-sharing systemNew EV car-sharing system. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Demonstrators, pilots, prototypes | 2020-02-25 |
D7.4.1 Integrated Replication Strategy SofiaIntegrated Replication Strategy Sofia. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D5.2.2 Co-design processesSummary on all processes of T5.2-T5.5, methods and results. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Demonstrators, pilots, prototypes | 2020-02-25 |
D3.4.4 Full Operational Community Management SystemFully operational Community Management System. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Other | 2020-02-25 |
D4.4.2 Integrated infrastructureIntelligent lampposts installed. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Demonstrators, pilots, prototypes | 2020-02-25 |
D5.4.2 Central data management systemFeasibility study and implementation plan. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Demonstrators, pilots, prototypes | 2020-02-25 |
D3.6.1 Monitoring strategy in the Lyon Lighthouse projectMonitoring strategy in the Lyon Lighthouse project. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D5.1.2 Lighthouse Project Simmering NWGlossy summary describing main activities and achievements with internal management report annexed. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D5.2.1 Urban Living LabUrban Living Lab, report on set-up and citizen involvement activities. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Demonstrators, pilots, prototypes | 2020-02-25 |
D5.3.1 Low energy districtReport on activities and results on the refurbished buildings including energy performance certificates and on supply-side improvements and monitoring. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Demonstrators, pilots, prototypes | 2020-02-25 |
D8.3.2 Smart city toolboxSmart city toolbox. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2020-02-25 |
D5.4.1 Integrated infrastructureReport on integration of local energy sources into heat and electricity grid, implications on grid stability. Part related to waste heat from data center confidential. (LTP WE in the lead for WSTW). Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Demonstrators, pilots, prototypes | 2020-02-25 |
D8.5.1 Report on standardization activitiesOverview of conducted standardization activities, including strategy for standardization and the project plans for three potential standardization documents such as CWA (CEN Workshop Agreement) and other possible contributions to ongoing standardization activities. Drafts for the business plans of three potential standard documents, e.g. CWA (CEN Workshop Agreement) and potentially drafts for three CWA. Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015 |
Documents, reports | 2019-11-25 |