Opendata, web and dolomites

SMARTER TOGETHER project deliverables

The page lists 41 deliverables related to the research project "SMARTER TOGETHER".

 List of Deliverables

SMARTER TOGETHER: list of downloadable deliverables.
title and desprition type last update

D4.1.3 Smart City Munich Lighthouse Project

Documentation of activities and achievements.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D6.1.1 Monitoring and evaluation manual

Monitoring and Evaluation Manual and Evaluation templates.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D7.4.3 Integrated Replication Strategy Venice

Integrated Replication Strategy Venice.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D4.5.1 Mobility stations

Mobility Stations implemented.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-02-25

D3.3.2 Final report on the low- energy district achievements – zero carbon objective

Final report on the low- energy district achievements – zero carbon objective

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D8.2.1 Report on the outputs of the Club of Cities

Report on the outputs of the Club of Cities.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D3.7.1 Summary and conclusions of Lyon Lighthouse project for replication

Summary and conclusions of Lyon Lighthouse project for replication.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D3.5.3 Final report on sustainable mobility achievements

Final report on sustainable mobility achievements.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D2.1.2 Report on knowledge exchange workshop 2

This deliverable will outline the outputs of the second knowledge exchange workshop to be performed in M18 of task 2.1 and all associated engagement activities of task 2.1.2, further developing the thematic recommendations for co-created smart city solutions to be finalized within D2.1.3.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D8.1.1 Replication framework

Replication framework.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D.3.4.3 Final report on the connected district achievements

Final report on the connected district achievements.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D2.1.3 Thematic recommendations and Exchange workshop report 3

This deliverable will outline the outputs of the third and last knowledge exchange workshop to be performed in M24 of task 2, all associated engagement activities of task 2.1.2, and the final set of thematic recommendations for co-created smart city solutions.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D3.4.1 Full operational Community Management System

Full operational Community Management System.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Other 2020-02-25

D.5.5.2 Mobility point

Design and installation report. (LTP NeuMo in the lead for WSTW)

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-02-25

D8.4.1 Handbook Smart City business model innovation

Handbook Smart City business model innovation.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D3.2.1 Final report on stakeholder involvement in the Lyon Lighthouse city

Final report on stakeholder involvement in the Lyon Lighthouse city

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D4.5.2 e-mobility

e-mobility and smart mobility management systems implemented.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-02-25

D4.4.1 Smart data platform

Smart data platform deployed and integrated with sensor data from lampposts, heating control, smart access, smart services, etc.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-02-25

D5.5.1 e-mobility in Simmering NW

e-mobility in Simmering NW, report on all new e-mobility services and activities and their integration into a local mobility strategy.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-02-25

D3.3.3 Buildings refurbished and renewable energy systems commissioned

Buildings refurbished and renewable energy systems commissioned

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-02-25

D4.1.2 Implementation reports and blueprints

1. Implementation report for sustainable district refurbishment towards high energy efficient residential buildings and a blueprint for further refurbishment measures.
2. Best practice reports, infrastructures and tools for encouraging and empowering complex energy consumers to reduce energy consumption.
3. Implementation report of an open data infrastructure.
4. A standard for intelligent lampposts including the definition for tender procedures.
5. Implementation report on at least 8 mobility stations and a scalable blueprint for integrated multi-modal mobility stations on private properties.
6. Implementation report on an integrated public and private car and ride-sharing system in combination with mobility stations.
7. Implementation report on an information and management system for simplifying mobility and reducing traffic.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D7.4.2 Integrated Replication Strategy Santiago de Compostela

Integrated Replication Strategy Santiago de Compostela.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D4.2.1 Smart City Catalyst

Stakeholder reports, summary of co-design processes, methods and results.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-02-25

D6.1.2 Evaluation templates

Monitoring and Evaluation Manual and Evaluation templates.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D2.1.1 Report on knowledge exchange workshop 1

This deliverable will outline the outputs of the first knowledge exchange workshop to be performed in M12 of task 2.1 and all associated engagement activities of task 2.1.2, further building a first basis for the thematic recommendations for co-created smart city solutions to be presented within D2.1.3.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D9.3.1 Website

Website.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Websites, patent fillings, videos etc. 2020-02-25

D3.3.1 Report on Study of PV self-consumption on B2 plot

Report on Study of PV self-consumption on B2 plot

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D3.4.2 Report on deployment of LINKY smart power meters in the area

Report on deployment of LINKY smart power meters in the area.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D3.5.1 New EV car-sharing system

New EV car-sharing system.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-02-25

D7.4.1 Integrated Replication Strategy Sofia

Integrated Replication Strategy Sofia.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D5.2.2 Co-design processes

Summary on all processes of T5.2-T5.5, methods and results.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-02-25

D3.4.4 Full Operational Community Management System

Fully operational Community Management System.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Other 2020-02-25

D4.4.2 Integrated infrastructure

Intelligent lampposts installed.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-02-25

D5.4.2 Central data management system

Feasibility study and implementation plan.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-02-25

D3.6.1 Monitoring strategy in the Lyon Lighthouse project

Monitoring strategy in the Lyon Lighthouse project.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D5.1.2 Lighthouse Project Simmering NW

Glossy summary describing main activities and achievements with internal management report annexed.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D5.2.1 Urban Living Lab

Urban Living Lab, report on set-up and citizen involvement activities.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-02-25

D5.3.1 Low energy district

Report on activities and results on the refurbished buildings including energy performance certificates and on supply-side improvements and monitoring.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-02-25

D8.3.2 Smart city toolbox

Smart city toolbox.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2020-02-25

D5.4.1 Integrated infrastructure

Report on integration of local energy sources into heat and electricity grid, implications on grid stability. Part related to waste heat from data center confidential. (LTP WE in the lead for WSTW).

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Demonstrators, pilots, prototypes 2020-02-25

D8.5.1 Report on standardization activities

Overview of conducted standardization activities, including strategy for standardization and the project plans for three potential standardization documents such as CWA (CEN Workshop Agreement) and other possible contributions to ongoing standardization activities. Drafts for the business plans of three potential standard documents, e.g. CWA (CEN Workshop Agreement) and potentially drafts for three CWA.

Programme: H2020-EU.3.3.1.3. - Topic(s): SCC-01-2015

download deliverable 

Documents, reports 2019-11-25