Opendata, web and dolomites

PVSITES project deliverables

The page lists 47 deliverables related to the research project "PVSITES".

 List of Deliverables

PVSITES: list of downloadable deliverables.
title and desprition type last update

Annual report on held events (update 2)

Month 36 update

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-23

Design pack for every demo site

The deliverable will include a guide for architectural integration of the BIPV products in every demo site, guide for commissioning and maintenance, installation guides, guide for electrical integration and available operation strategies, control strategies for each demo site. Health, safety and security procedures.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-23

Promotional material (update 2)

Press releases, articles, leaflets, videos, social media campaign. Month 36 batch.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-07-23

Structure, contents and operation mechanisms of BIPV products portfolio (update 2)

Month 36, final version.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-23

Dissemination and communication plan (update 3)

Month 36 update

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-23

Prototypes for demo sites – first batch

The manufacturing of prototypes for demo sites has been divided in two batches to allow the manufacturers coping with this request in reasonable times. The content and distribution between batches will be a result of the project development.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-07-22

Annual report on held events (update 1)

Month 24 update

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

Dissemination and communication plan (update 2)

Month 24 update

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

Report on simulation work, c-silicon based BIPV elements

Optical, thermal, mechanical and electrical simulation reports at element level. The aim is to generate part of the information needed to show compliance with building codes and standard and extract conclusions which might lead to re-design needs. At building level, simulation of energy efficiency, lighting and all parameters determining the optimal architectural integration as a function of building typology, location, etc. The project demo buildings will also be simulated with two purposes: (1) to select the optimum implementation for the product and have a first feedback on expected performance levels and (2) to validate the software output data with the results coming from the demo installations.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

Recommendations on storage systems for BIPV systems

Justification in terms of cost-effectiveness of the selected PV storage topology and technology for each of every single use case categorized in task 2.2. (at least 6 use cases)

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

Roofing tiles and façade elements prototypes with 10%-14% efficiency modules of 0.5x1 m2 and 1x1 m2 area

10%-14% efficiency CIGS modules implemented as BIPV roofing tiles and façade elements with no performance loss.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-07-22

Specific monitoring plan for every demo site

Specific actions that need to be conducted in each pilot site and will be designed according to key parameters depending on pilot site configuration (BIPV technologies implemented, location of the BIPV implementation,etc.). 8

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

Pre-commercial version of web services platform

User friendly interfaces implemented, updates after optimization process.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Other 2019-07-22

Installation and execution of monitoring of BIPV systems

Completion of the installation of the monitoring equipment and start of BIPV systems monitoring process.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

Report on the baseline assessment of the demo sites

Target buildings will be monitored for one year period prior to the retrofitting. This will allow to establish the energy consumption baseline to compare the new consumptions after renovation and then for assessing the energy savings.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

Second revision of detailed project management plan

This deliverable will contain the second version of the project management plan, updated after 27 months of project execution.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

Large area roofing and façade elements of 0.5x2-3 m2 or 1x2-3 m2 using 10%-14% efficiency modules

10%-14% efficiency CIGS modules implemented as large area BIPV roofing and façade elements with no performance loss.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-07-22

Promotional material (update 1)

Press releases, articles, leaflets, videos, social media campaign. Month 24 batch.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-07-22

Structure, contents and operation mechanisms of BIPV products portfolio (update 1)

Month 24 update

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

Samples for validation testing, CIGS elements

Completed manufacturing, in accordance with specifications, of all the CIGS-based roofing and façade elements for testing process.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-07-22

E-catalogs delivery

Containing BIM objects representing PVSITES products.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Other 2019-07-22

Results of modelling at element and building level, CIGS products

Optical, thermal, mechanical and electrical simulation reports at element level. The aim is to generate part of the information needed to show compliance with building codes and standard and extract conclusions which might lead to re-design needs. At building level, simulation of energy efficiency, lighting (for semitransparent curved CIGS elements) and all parameters determining the optimal architectural integration as a function of building typology, location, etc. The project demo buildings will also be simulated with two purposes: (1) to select the optimum implementation for the product and have a first feedback on expected performance levels and (2) to validate the software output data with the results coming from the demo installations.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

First prototype of web services platform

First version of web service model defined and implemented.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Other 2019-07-22

Quality management plan

The quality management plan will include an updated, detailed project management plan, Gantt chart and Work Breakdown Structure. It will display at least a schedule per task, responsible partner, related subtasks, related deliverables and dependencies to other tasks. Revisions of the project management plan will be made on month 15 and month 27.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

Revision of detailed project management plan

This deliverable will contain the second version of the project management plan, updated after 15 months of project execution.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

Standardization needs

Summary report on main current legislative standards in place, needed standardization activities prior to marketization of the innovative products and tests needed for market introduction.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

Structure, contents and operation mechanisms of BIPV products portfolio

The deliverable will define the technical information needed for each product: PV technology, nominal power, possible architectural applications, customization, life cycle, price, etc. As for operation mechanisms, it will describe a search tool able to select the optimum product at project design level; as well as preliminary production estimates as a function of location, orientation, tilt, etc. to facilitate a first evaluation of economic viability of the BIPV products. To be updated in months 24 and 36.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

Promotional material

Press releases, articles, leaflets, videos, social media campaign. Month 12 batch.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-07-22

Operational prototypes with hidden busbars and L-interconnections

Fully opaque laminated glass units with hidden busbars and L interconnections with no performance loss.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-07-22

Common monitoring guidelines

Activities and technical requirements that must be completed and met to successfully achieve the monitoring and assessment tasks at building and BIPV system level.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

Samples for indoor validation tests, c-Si based products

Complete manufacturing, according to specifications, of all the samples needed for the indoor validation tests of c-Si based products.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-07-22

Second prototype of BIPV simulation tool

It will include building description, accurate description of building elements, occlusion elements, heating/cooling differentials computed on specific areas of the building, impact on natural lighting.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Other 2019-07-22

Project website

Development of a multipurpose project website for widespread communication, but also as share-point for the consortium.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-07-22

Dissemination and communication plan

The dissemination and communication plan sets the most appropriate strategies for dissemination and communication, in line with the strategies for exploitation of results. To be updated in months 12, 24, 36.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

European climate zones and bio-climatic design requirements

Formulation of requirements attending to European climate zones and bio-climatic design considerations. These requirements will consider comfort, indoor climate, heating, cooling and daylight specifications as a function of climatic zones.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

Curved CIGS glass elements

Prototypes of curved CIGS glass elements complying with specifications and protocols defined for testing.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-07-22

Annual report on held events

Project related dissemination in major relevant conferences and other events by project partners. First version. To be updated in months 24, 36 and 42.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

Formulation of architectural and aesthetical requirements for the BIPV building elements to be demonstrated within the project

3D representation of architectural and aesthetical specifications regarding colour, transparency levels, integration aspects, etc.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

Dissemination and communication plan (update 1)

Month 12 update

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

Guidelines for project’s visual identity

Specific information and related materials to inform the partners about the rules to be applied for coherent and consistent presentation of project communications.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-07-22

Regulatory framework

Summary report providing and overview of relevant current and foreseen legislation regarding renewables, grid and buildings and their implications for the BIPV market.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

Prototypes of framing systems compatible with XL-formats and large thickness BIPV units

Mechanical aspects and hidden wiring strategies elucidated for large dimension BIPV units (up to 4,5x2,5 m).

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-07-22

Operational prototypes, see-through back contact solar cells

Laminated glass units with back contact solar cells. Module efficiency 16% measured by solar simulator at 35% light transmission.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-07-22

NZEB building concepts for the application of BIPV building elements

Collection of BIPV related concepts reaching the NZEB level.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

Prototype of BIPV simulation tool, first version

Hourly amount of solar income on the building and separate elements. Hourly PV production. Heating and cooling deltas.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Other 2019-07-22

Energy audit of buildings and identification of BIPV possibilities in every demo site

For every building site, an energy analysis will be done to identify the thermal and electrical real behavior of the buildings and their interactions with their districts. The deliverable will include 2-3 pre-dimensioning possibilities for every demo site, including the description of total surfaces of BIPV and storage installation.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22

Market and stakeholder analysis

Summary report on market and stakeholder analysis and trends including market potential/challenges and expected desirable benefits for different stakeholders.

Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015

download deliverable 

Documents, reports 2019-07-22