The page lists 47 deliverables related to the research project "PVSITES".
title and desprition | type | last update |
---|---|---|
Annual report on held events (update 2)Month 36 update Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-23 |
Design pack for every demo siteThe deliverable will include a guide for architectural integration of the BIPV products in every demo site, guide for commissioning and maintenance, installation guides, guide for electrical integration and available operation strategies, control strategies for each demo site. Health, safety and security procedures. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-23 |
Promotional material (update 2)Press releases, articles, leaflets, videos, social media campaign. Month 36 batch. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Websites, patent fillings, videos etc. | 2019-07-23 |
Structure, contents and operation mechanisms of BIPV products portfolio (update 2)Month 36, final version. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-23 |
Dissemination and communication plan (update 3)Month 36 update Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-23 |
Prototypes for demo sites – first batchThe manufacturing of prototypes for demo sites has been divided in two batches to allow the manufacturers coping with this request in reasonable times. The content and distribution between batches will be a result of the project development. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Demonstrators, pilots, prototypes | 2019-07-22 |
Annual report on held events (update 1)Month 24 update Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
Dissemination and communication plan (update 2)Month 24 update Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
Report on simulation work, c-silicon based BIPV elementsOptical, thermal, mechanical and electrical simulation reports at element level. The aim is to generate part of the information needed to show compliance with building codes and standard and extract conclusions which might lead to re-design needs. At building level, simulation of energy efficiency, lighting and all parameters determining the optimal architectural integration as a function of building typology, location, etc. The project demo buildings will also be simulated with two purposes: (1) to select the optimum implementation for the product and have a first feedback on expected performance levels and (2) to validate the software output data with the results coming from the demo installations. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
Recommendations on storage systems for BIPV systemsJustification in terms of cost-effectiveness of the selected PV storage topology and technology for each of every single use case categorized in task 2.2. (at least 6 use cases) Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
Roofing tiles and façade elements prototypes with 10%-14% efficiency modules of 0.5x1 m2 and 1x1 m2 area10%-14% efficiency CIGS modules implemented as BIPV roofing tiles and façade elements with no performance loss. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Demonstrators, pilots, prototypes | 2019-07-22 |
Specific monitoring plan for every demo siteSpecific actions that need to be conducted in each pilot site and will be designed according to key parameters depending on pilot site configuration (BIPV technologies implemented, location of the BIPV implementation,etc.). 8 Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
Pre-commercial version of web services platformUser friendly interfaces implemented, updates after optimization process. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Other | 2019-07-22 |
Installation and execution of monitoring of BIPV systemsCompletion of the installation of the monitoring equipment and start of BIPV systems monitoring process. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
Report on the baseline assessment of the demo sitesTarget buildings will be monitored for one year period prior to the retrofitting. This will allow to establish the energy consumption baseline to compare the new consumptions after renovation and then for assessing the energy savings. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
Second revision of detailed project management planThis deliverable will contain the second version of the project management plan, updated after 27 months of project execution. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
Large area roofing and façade elements of 0.5x2-3 m2 or 1x2-3 m2 using 10%-14% efficiency modules10%-14% efficiency CIGS modules implemented as large area BIPV roofing and façade elements with no performance loss. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Demonstrators, pilots, prototypes | 2019-07-22 |
Promotional material (update 1)Press releases, articles, leaflets, videos, social media campaign. Month 24 batch. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Websites, patent fillings, videos etc. | 2019-07-22 |
Structure, contents and operation mechanisms of BIPV products portfolio (update 1)Month 24 update Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
Samples for validation testing, CIGS elementsCompleted manufacturing, in accordance with specifications, of all the CIGS-based roofing and façade elements for testing process. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Demonstrators, pilots, prototypes | 2019-07-22 |
E-catalogs deliveryContaining BIM objects representing PVSITES products. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Other | 2019-07-22 |
Results of modelling at element and building level, CIGS productsOptical, thermal, mechanical and electrical simulation reports at element level. The aim is to generate part of the information needed to show compliance with building codes and standard and extract conclusions which might lead to re-design needs. At building level, simulation of energy efficiency, lighting (for semitransparent curved CIGS elements) and all parameters determining the optimal architectural integration as a function of building typology, location, etc. The project demo buildings will also be simulated with two purposes: (1) to select the optimum implementation for the product and have a first feedback on expected performance levels and (2) to validate the software output data with the results coming from the demo installations. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
First prototype of web services platformFirst version of web service model defined and implemented. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Other | 2019-07-22 |
Quality management planThe quality management plan will include an updated, detailed project management plan, Gantt chart and Work Breakdown Structure. It will display at least a schedule per task, responsible partner, related subtasks, related deliverables and dependencies to other tasks. Revisions of the project management plan will be made on month 15 and month 27. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
Revision of detailed project management planThis deliverable will contain the second version of the project management plan, updated after 15 months of project execution. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
Standardization needsSummary report on main current legislative standards in place, needed standardization activities prior to marketization of the innovative products and tests needed for market introduction. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
Structure, contents and operation mechanisms of BIPV products portfolioThe deliverable will define the technical information needed for each product: PV technology, nominal power, possible architectural applications, customization, life cycle, price, etc. As for operation mechanisms, it will describe a search tool able to select the optimum product at project design level; as well as preliminary production estimates as a function of location, orientation, tilt, etc. to facilitate a first evaluation of economic viability of the BIPV products. To be updated in months 24 and 36. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
Promotional materialPress releases, articles, leaflets, videos, social media campaign. Month 12 batch. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Websites, patent fillings, videos etc. | 2019-07-22 |
Operational prototypes with hidden busbars and L-interconnectionsFully opaque laminated glass units with hidden busbars and L interconnections with no performance loss. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Demonstrators, pilots, prototypes | 2019-07-22 |
Common monitoring guidelinesActivities and technical requirements that must be completed and met to successfully achieve the monitoring and assessment tasks at building and BIPV system level. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
Samples for indoor validation tests, c-Si based productsComplete manufacturing, according to specifications, of all the samples needed for the indoor validation tests of c-Si based products. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Demonstrators, pilots, prototypes | 2019-07-22 |
Second prototype of BIPV simulation toolIt will include building description, accurate description of building elements, occlusion elements, heating/cooling differentials computed on specific areas of the building, impact on natural lighting. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Other | 2019-07-22 |
Project websiteDevelopment of a multipurpose project website for widespread communication, but also as share-point for the consortium. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Websites, patent fillings, videos etc. | 2019-07-22 |
Dissemination and communication planThe dissemination and communication plan sets the most appropriate strategies for dissemination and communication, in line with the strategies for exploitation of results. To be updated in months 12, 24, 36. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
European climate zones and bio-climatic design requirementsFormulation of requirements attending to European climate zones and bio-climatic design considerations. These requirements will consider comfort, indoor climate, heating, cooling and daylight specifications as a function of climatic zones. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
Curved CIGS glass elementsPrototypes of curved CIGS glass elements complying with specifications and protocols defined for testing. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Demonstrators, pilots, prototypes | 2019-07-22 |
Annual report on held eventsProject related dissemination in major relevant conferences and other events by project partners. First version. To be updated in months 24, 36 and 42. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
Formulation of architectural and aesthetical requirements for the BIPV building elements to be demonstrated within the project3D representation of architectural and aesthetical specifications regarding colour, transparency levels, integration aspects, etc. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
Dissemination and communication plan (update 1)Month 12 update Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
Guidelines for project’s visual identitySpecific information and related materials to inform the partners about the rules to be applied for coherent and consistent presentation of project communications. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Websites, patent fillings, videos etc. | 2019-07-22 |
Regulatory frameworkSummary report providing and overview of relevant current and foreseen legislation regarding renewables, grid and buildings and their implications for the BIPV market. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
Prototypes of framing systems compatible with XL-formats and large thickness BIPV unitsMechanical aspects and hidden wiring strategies elucidated for large dimension BIPV units (up to 4,5x2,5 m). Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Demonstrators, pilots, prototypes | 2019-07-22 |
Operational prototypes, see-through back contact solar cellsLaminated glass units with back contact solar cells. Module efficiency 16% measured by solar simulator at 35% light transmission. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Demonstrators, pilots, prototypes | 2019-07-22 |
NZEB building concepts for the application of BIPV building elementsCollection of BIPV related concepts reaching the NZEB level. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
Prototype of BIPV simulation tool, first versionHourly amount of solar income on the building and separate elements. Hourly PV production. Heating and cooling deltas. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Other | 2019-07-22 |
Energy audit of buildings and identification of BIPV possibilities in every demo siteFor every building site, an energy analysis will be done to identify the thermal and electrical real behavior of the buildings and their interactions with their districts. The deliverable will include 2-3 pre-dimensioning possibilities for every demo site, including the description of total surfaces of BIPV and storage installation. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |
Market and stakeholder analysisSummary report on market and stakeholder analysis and trends including market potential/challenges and expected desirable benefits for different stakeholders. Programme: H2020-EU.3.3.2.4.;H2020-EU.3.3.2.2.;H2020-EU.3.3.2.1. - Topic(s): LCE-03-2015 |
Documents, reports | 2019-07-22 |