Waste4Think: list of downloadable deliverables.
title and desprition
| type |
last update |
Technical Documentation of R2: Collection Module
R+OTHER - Dissemination level: Public
Format
The deliverable contains the technical documentation, installation and user guides of the Collection Module (Mawis U3.0).The documentation will be delivered in English, Spanish, Portuguese, German, French and Italian.
Short description
Implementation of the Collection Module. This module will be developed as an extension of the Mawis U2.0 platform of MBA and is composed of a set of tools to optimize different aspects of the waste collection system. In particular:
â— An automatic fleet route optimization algorithm
â— A navigation software for the computers onboard of the collection truck
â— Personalized software tool to foster eco-driving habits.
Objectives
The objective of this deliverable is to create the documentation of the upgrade the Mawis U2.0 service for Waste Management in order to introduce a more automatic and efficient operation of the waste collection system.
Content and methodology
A complete technical documentation publicly available in the web page of the project including an user manual and an architecture specification.
Targets
Waste managers and truck drivers, who will have new tools to improve the operational strategies.
Tasks involved
This deliverable will be in relation with all the task in WP1 and WP2.
Relation with other deliverables
This deliverable will have a close relationship with D2.1-D2.4
Programme: H2020-EU.3.5.4. - Topic(s): WASTE-6a-2015
download deliverable
|
Documents, reports |
2019-11-18 |
Implementation of R8: STEM Lessons
R+OTHER
Format
The teaching units will be delivered according to the standards defined in Task 7.2 for the materials of the project. The teaching units will be available in the following languages: English, Polish, Spanish and Greek.
Short description
This deliverable will contain digital STEM lessons for fostering a better understanding of waste-generation prevention actions.
Objectives
The aim of the educational units is to make possible a bottom up strategy in which citizen and scholars are the main actors. The deliverable should make possible their education as well as the paths and methods for transmitting all the acquired knowledge to other societal layers.
Content and methodology
Deliverable 4.2 will include a minimum of 4 digital STEM lessons comprising of topic presentation and activities
All these resources will be accessible from the web page of the project as well as in relevant public repositories for teaching materials. Finally, the methodology followed to build the STEM lessons will be based on the Inquiry Based Learning and the 5E approach: engage, explore, explain, elaborate, evaluate.
Targets
All the actors involved in the Circular Economy concept and in the minimum, Public Authorities, Citizen, Industry and Scholars.
Tasks involved
All task in WP1, T2.4-T2.5 and T4.1
Relation with other deliverables
D1.1-D1.3, D2.7-D2.10. and D4.1.
Programme: H2020-EU.3.5.4. - Topic(s): WASTE-6a-2015
download deliverable
|
Documents, reports |
2019-11-18 |
Communication and Dissemination Plan
Format
The communication plan will be an online document, shared by the project partners and available to all of them. The report will be written in English and will follow the identity style.
Short description
The communication and dissemination plan will include the objectives, target groups, instruments and messages to be communicated. The deliverable should detail:
1. Definition of the image of the project through the creation of an editorial/ graphic line, that will be used for all promotional materials.
2. Planning of training and promotional materials (brochures, posters, promotional materials, and so on), useful for the spreading and learning of the core themes of the project. Materials will be ecological, sustainable and texts will be edited in English, and when it’s necessary, in pilot areas language;
3. The format of informative panels to be placed in strategic positions of the involved locations, accessible to the public;
4. Process to make press releases, since the start of the project, concerning all relevant events (conferences, public events, meetings and so on), which will be periodically sent to local and national and international media (newspapers, TVs, radios and press agencies).
5. Publication of press releases on the Internet: specialized sites dedicated to the environment/ecology/recycling sites for third sector, partners’ and involved stakeholders’ websites;
6. Relationship of the publishes made at the newsletter, social networks, etc.
The deliverable should also include a chronogram of the activities to carry out and the responsibles for each of them. It will also include the relationship of the different activities and the information flows.
Objectives
The communication plan aims to communicate, spread and promote the results achieved during the implementation of the project, both to the interested subjects and to a wider audience at a local and an European level that could benefit from Waste4Think experience. This deliverable will make clear the target groups and their potential benefits.
Content and methodology
All promotional materials should be eco-friendly and made with recycled paper.
Messages should be clear and attractive and the target groups carefully identified.
The communication plan will be defined at Milestone 1 and updated, in relation to the implementation of the project actions, at Milestone 2, Milestone 3, Milestone 4 and Milestone 5.
Targets
All the actors involved in the circular economy: industries, citizen, waste managers, public administrators, policy makers, etc. Of course, the project partners and communication managers will be the first ones to be informed about.
Tasks involved
All task in WP7
Relation with other deliverables
D7.2 and D7.3
Programme: H2020-EU.3.5.4. - Topic(s): WASTE-6a-2015
download deliverable
|
Documents, reports |
2019-11-18 |
Pilots Planning documentation
R+OTHER
Format:
Technical document.
Short description:
Technical documentation written in English and defining all the cross-cutting aspects of the project that should be taken into consideration from the beginning.
Objectives
â— Set the legislation framework of all the pilots sites
â— Fix the scope of the project:
- Identify the user groups and involved stakeholders,
- Specify the user functional requirements,
- Write the use cases
- Define the functional requirements of all the solutions
- Define the technical specifications of the envisaged technical solutions
Content and methodology
Every component of this document will follow a different methodology:
â— Legislation: Comprehensive analysis of the current legislation of the 4 pilots will be delivered on Milestone 1.
◠Scope: an ‘use cases’ report and a formal definition of the system requirements will be produced at Milestone 1. This report will be the basis of all the solutions developed in the project.
Targets
Citizen, stakeholders and project partners.
Tasks involved
T1.1 - T1.2.
Relation with other deliverables
This deliverable will be the main result of WP1. Moreover, the production of this deliverable will define the Milestone 1 and will be used extensively all over the project.
Programme: H2020-EU.3.5.4. - Topic(s): WASTE-6a-2015
download deliverable
|
Documents, reports |
2019-11-18 |
Sustainability Assessment Models
Type: R+OTHER
Short description:
Technical documentation written in English defining the Sustainability Assessment Model for the project as weel as calculating the baseline of every pilot using this model.
Objectives
â— Fix the sustainability model and the KPIs to be used in the evaluation of the project objectives. Among the KPIs defined it will be included the main KPIs of the project: urban waste generation, urban waste sorted, waste diverted to landfield and urban waste management costs.
â— Set the baseline of the pilot sites. In particular of the main KPIs of the project.
Content and methodology
Every component of this document will follow a different methodology:
â— Sustainability model: Formal specification of the sustainability model. From this model a set of KPIs and the reference methodology for its calculation will be defined. The preliminary version of this report will be produced by Milestone 1. The final version will be obtained at Month 12.
â— Indicators and monitoring system. Definition of the indicators to be calculated and monitoring actions to be deployed during the implementation of the awareness actions. This section should be made in Month 12.
â— Define the models to calculate the parameters of the PAYT schemes including a set of innovative parameters aimed at certifying the effectiveness of the measurements of PAYT (Task 5.2) Each indicator will be identified to be potentially applied at EU level. Specific assessments will be carried out by SOFTLINE on Seveso or in other municipalities to take into account conditions affecting the correct identification (specific weight, distance, type of receptacle). This section should be made in Month 12.
â— Baseline: the pilot sites will be reviewed in terms of the KPIs and the project baseline will be assessed (Milestones 6-9). In this sense, an integral waste management evaluation will be carried out. The report with the results of the baseline assessment of the pilots will be published in Month 12.
Targets
Citizen, stakeholders and project partners.
Tasks involved
T1.3.
Relation with other deliverables
The assessment model will be used in the interims reports (D1.4 – D1.7) to assess the progress towards the main objective of the project.
Programme: H2020-EU.3.5.4. - Topic(s): WASTE-6a-2015
download deliverable
|
Documents, reports |
2019-11-18 |
Best Practices database in Circular Economy, Economic Instruments and Prevention Actions
Type: other
Short description:
Databases with the best iniciatives found in the European Union related to circular economy actions, economic instruments used and prevention actions related to the waste management.
Objectives
Build a database of circular economy Best Practices and New Business Models, economic instruments used to prevent the creation of waste as weel as to foster correct sorting of the waste and best practices in prevention and awareness campaigns.
Content and methodology
To build the databases, surveys will be send to relevant stakeholders. Interviews will be made when possible. Finally, both direct search on internet and continuos technology watchs will be made.
â— On month 6 a data model to store all the information will be made.
â— On month 12 it will be delivered a database with PAYT and incentive schemes, Innovative Business Models to foster circular economy nd Best Practices in Prevention and Awareness Campaigns in place at EU level, including a viability evaluation for the implementation in the 4 pilots. It will be targeting primarily waste reduction, high recycling, high quality of the recyclable fractions collected, comfort for citizens. About 10 major PAYT schemes will be described (e.g. based on volume, weight, number of deliveries, containers access, etc.). At least 10 innovative business models related to circular economy will be described (e.g. input and output materials , LCA of the process, localization, etc.). Finally, more than 10 Prevention and Awareness Campaigns will be described (e.g. target group, delivery system, objective, results, etc.)
Targets
Citizen, stakeholders and project partners.
Tasks involved
T1.1, T1.3, T2.5, T4.1 and T5.1
Relation with other deliverables
This databases will be used in D2.5, D4.1 and D5.1.
Programme: H2020-EU.3.5.4. - Topic(s): WASTE-6a-2015
download deliverable
|
Other |
2019-11-18 |
Implementation of R17: non ICT Innovative Social Actions
\"R -
Format
Written report in English, delivered as a printable PDF following the identity style guide created in the Communication and dissemination Plan, with a professional graphical editing.
Short description
This report will describe the environmental education strategies to be followed during the implementation of each pilot, including the most innovative social actions that will not use the ICT platform to reach a high level of awareness and change in habits from the different targets involved.
Objectives
The aim of this program is to develop the best environmental education and awareness strategy and to present it along with the implementation of all the required actions to undertake the demonstrative objectives of the pilot sites. The final goal is to reach a high rate of empowerment and awareness, and finally, a change in consumption and waste management habits among the different stakeholders involved in the implementation of the different actions.
Content and methodology
The deliverable will include a full program that defines a strategic and integral awareness/participation campaign for each pilot, new innovative social actions will be defined to promote prevention and social empowerment. General strategy and each communication activity will be deeply described and scheduled, application methodology deployed, ready to be implemented in each pilot. Both online & offline materials, networks, training, empowerment, and other direct tools will be developed according to the contents and objectives of the project.
The Report will be divided into these sections:
â— Targets and Key messages definition, in general and for each pilot taking into account the socio-economic context, current situation, kind of pilot actions to be developed.
â—â— Awareness/Participation Campaign definition
â—‹ General contents. Definition of common strategies.
â—‹ Strategy for each pilot. Definition of the action plan for each pilot, awareness and educational actions to be developed. Experiences gained in Seveso, Cascais, Zamudio and Halandri will be included in the best practice database.
A close work between coordinator responsible for this deliverable and all involved partners will be done to define the actions and contents. Several workshops (with local partners but also with Public Authorities, Civic entities, Citizen and Industries) will be hold to reach consensus about the strategies included in the Environmental Education Program.
Finally, specific innovative awareness campaigns will be defined:
â— The outcome of the \"\"virtuous households contest\"\" performed in Seveso will be included in this deliverable, as a reminder about the theoretical maximum recycling rate and waste reduction that citizens are able to achieve when highly motivated with a prize.
â— SEVESO is committed to dramatically reduce the amount of disposable nappies providing a free service lasting one to three months including rental and washing for participating families.
â— In Zamudio several courses of creative cooking for leftover reutilization will be taught to further reduce the amount of edible food waste.
Targets
Local authorities, Civic entities, Citizens, Economic Activities, Industries
Tasks involved
This Delivery is the output of Task 4.1
Other tasks involved:
All Task in WP1, T2.4, T2.5 and all task in WP3 and WP4
Relation with other deliverables
D1.1, D1.4-D1.7, D2.7-D2.10, D3.1-D3.4, D4.1-D4.12, D5.3.
\"
Programme: H2020-EU.3.5.4. - Topic(s): WASTE-6a-2015
download deliverable
|
Documents, reports |
2019-11-18 |
Technical Documentation of R3: Planning Module
R+OTHER -
Format
Technical documentation written in English
Short description
Technical documentation of the implementation of the Planning Module. The Planning Module is a set of tools to optimize different aspects of the waste collection system composed of the following components:
â— Tools to create models of the generation patterns and future trends
â— Multi-objective optimization procedures
â— Infraestructures and event planning
â— Open Data Module.
â— Sustainable Public Procurement Recommendation
â— What-if platform (editor, simulator and visualization systems)
Objectives
â— Set the architecture of the Planning Module.
â— Fix the communication protocols and data models that communicate Planning Module with the back-end and other modules (as the Collection Module, the O&M Module, the Circular Economy Module and the Serious Games).
â— Write the technical documentation and the user\'s manual.
Content and methodology
This deliverable will include:
â— Architecture specifications: data models, communication protocols, public APIs and UML diagrams of the Planning Module.
â— Planning Module technical documentation: API description, installation and user manual and other similar technical documentation.
As we plan to use AGILE methodologies to develop the IT tools, both the technical documentation and the implementation will be ready to be delivered continuously.
Targets
Project partners, Academia, Waste Managers, public administration and potential contributors to the platform.
Tasks involved
This deliverable will be in relation with all the task in WP1 and Task T2.1-T2.3 Moreover, this module will be principally used by the different technological and non-technological solutions of the project (WP3, WP4, WP5).
Relation with other deliverables
This deliverable will have a close relationship with D2.1-D2.10, D3.1-D3.4, D4.2-D4.12, D5.1 and D5.2.
Programme: H2020-EU.3.5.4. - Topic(s): WASTE-6a-2015
download deliverable
|
Documents, reports |
2019-11-18 |
Implementation of the Sensors for R1, R2 and R3
R+OTHER
Format
Prototypes
Short description
Prototypes of the different IoT devices like scales, volumetric sensors, artificial vision systems, traffic congestion sensors, treatment plant monitoring, identification systems, etc. to be installed all over the value chain of the waste management.
Objectives
Produce prototypes of the sensors to be deployed in the different pilots sites.
Content and methodology
Prototypes of the sensors to be deployed: Identification and position system, container fill level and bag counter, scales and real time solid waste characterization system in trucks, DIY platform to share edible food, compost monitoring system and real time traffic congestion information.
Targets
Project partners. Waste Managers, Public Administration, Stakeholders that want to use the public infrastructure.
Tasks involved
All task in WP1 and T2.1
Relation with other deliverables
The sensor platform will be used across the proyect. In this sense, this sensors will be used in all task of WP1 and WP2. Moreover, the apps (T4.5), the design of the prevention campaigns (T4.1), the learning materials (T4.2), the serious games (T4.3) and citizen science actions (T4.4) will also use this documentation.
Programme: H2020-EU.3.5.4. - Topic(s): WASTE-6a-2015
download deliverable
|
Demonstrators, pilots, prototypes |
2019-11-18 |
Deployment & Integration Report
Format: (R) Technical document.
Short description:
Report written in English and with parts available in Spanish, Italian, Portuguese and Greek, with the overall progress of the pilots during the Deployment and Integration Phase.
Objectives
â— To summarize the actions taken
â— To assess the progress made in every pilot with respect to the baseline
Content and methodology:
This report will contain the following information:
â—‹ a preliminary evaluation of the state of the waste collection system of every pilot
â—‹ an update of the social actions taken in every pilot
â—‹ a report of the technologies integratedâ—‹ a review in terms of the KPIs and the project baseline following the sustainability model defined in D1.3
Targets
Citizen, stakeholders and project partners.
Tasks involved
T1.4-1.6.
Relation with other deliverables
Update of the baseline measured in D1.3.
Programme: H2020-EU.3.5.4. - Topic(s): WASTE-6a-2015
download deliverable
|
Documents, reports |
2019-11-18 |
Technical Documentation of R4: Circular Economy Planning Module
R+OTHER -
Format
Technical documentation written in English
Short description
Technical documentation of the Circular Economy Planning Module. This module consists of a set of tools that will facilitate the retrieving of circular economy possibilities to public administration enterprise managers and potential investors at the pilot regions
Objectives
â— Set the architecture of the Circular Economy Planning Module
â— Fix the communication protocols and data models that communicate Circular Economy Planning Module with the back-end and other modules (as the Collection Module, the Planning Module, the Serious Games)
â— Write the technical documentation and the user\'s manual
Content and methodology
This deliverable will include:
â— Architecture specifications: data models, communication protocols, public APIs and UML diagrams of the Circular Economy Planning Module
â— Circular Economy Planning Module technical documentation: API description, installation and user manual
â— The data model to store the Circular Economy Best Practices and New Business Models
Please note that it is expected that partial deliverables will be compiled automatically from the current state of both, the source and documentation repositories. Finally, the source code will be packaged into a virtual machine in order to be easily reviewed.
Targets
Project partners, Academia, Public Authorities, Enterprise Managers, investors and potential contributors to the platform
Tasks involved
All task in WP1 and Task T2.4. Moreover, this module will be used by the serious games (T4.2) and the citizen science actions (T4.3).
Relation with other deliverables
This deliverable will have a close relationship with D1.1, D1.2, D1.3, D2.7, D2.8, D4.5, D4.9 and D4.10.
Programme: H2020-EU.3.5.4. - Topic(s): WASTE-6a-2015
download deliverable
|
Documents, reports |
2019-11-18 |
Project Quality Plan
R -
Format and short description
This deliverable will be a public report written in English which will give an overview of the most relevant project information, operational procedures and quality procedures in order to run the Waste4Think Project adequately.
Objective
The Project Quality Plan will aim to be a project management tool, providing some useful information for project partners and WP leaders to carry out their tasks. It will explain the procedures to be followed to assure that activities are carried out as committed on time and with the highest quality possible. Explanation about some of the most important administrative procedures (i.e. Project Reporting) will be also given in this deliverable.
Furthermore, the purpose of the deliverable will be also to shortly elaborate on issues stated in the Grant Agreement and the Consortium Agreement from a practical point of view. However, in the event of discrepancy between documents, this Project Quality Plan will be overruled by the EU Grant Agreement including its Annexes, and the Consortium Agreement with its possible addendums.
This document will suffer modifications through the lifecycle of Waste4Think project.
Content and targets
The contents of this report will be a description of the methodology used to assess the quality of every result of the project, in particular:
• The composition and responsibilities of the Quality Assurance Committee
• The procedure to make the peer-review process of the results
This report will be delivered at Milestone 1.
Task involved
All task of WP8.
Programme: H2020-EU.3.5.4. - Topic(s): WASTE-6a-2015
download deliverable
|
Documents, reports |
2019-11-18 |
Technical Documentation of the Serious Games (R9-R12)
\"R+OTHER –
Dissemination level: Public
Format
Technical documentation written in English.
Short description
The following games will be delivered as playable prototypes.
â— Sorting game: A small 2D single-player skills-based game with a number of levels, where the participant will win only by acquiring abilities for waste sorting.
â— Eco-design game: A small 2D single-player online puzzle game where the player wins the game by combining elements and making new eco-designs.
â— Planning game: A small 2D real-time single-player planning game, where the player gains points by understanding and optimizing the underlying waste system.
â— Virtual city game: A 2D online real time multiplayer virtual city strategy game, where the player gains points by developing your city and taking into account circular economy principles.
Objectives
Define the scope, the integration points, and the dependencies of the 4 serious games.
Content and methodology
The game design document will consolidate all available information from the relevant work packages, the workshops carried out and the groups of end-users, and will develop a full specification for the 4 games. The game design document will include the following for each game:
â— Basic information: Target group, context of usage, platform, duration, game genre, # of players, technology requirements and visual style
â— Core gameplay:
â— Overview features: A description of the game features in terms of functionality and implementation.
â— Flowchart: An overview of the progress through the game.
◠‘60 seconds’ game: A short description from a user perspective of how the game is perceived by the player to give an impression of the total user experience.
â— Integration overview: A description of the points to be integrated with the external systems and the API along with standards for communication with these.
â— User manuals including installation/deployment manuals. These will be available at least in English, Danish, Spanish, Portuguese, Greek and Italian.
â— Game Design document: The specification of the games to be developed especially with focus on scope, integration and dependencies. This should be complete at Milestone 1.
â— Mock-up: A first mockup of how the game will look like and feel in some few sketches. This should be complete at Milestone 1.
â— Pre-prototype: Moreover, this deliverable will also contain a first rough prototype of the core gameplay. This should be completed at Month 12.
Targets
Consortium Partners, Schools and Universities, General public, Academia, Local authorities, Waste managers.
Tasks involved
All task in WP1 and WP2, and Tasks 4.1-T4.3
Relation with other deliverables
D1.1-D1.3, D2.1, D.2.5, D.2.7, D2.9 D4.2, D4.3, D4.4.
\"
Programme: H2020-EU.3.5.4. - Topic(s): WASTE-6a-2015
download deliverable
|
Documents, reports |
2019-11-18 |
Preparatory Actions Report
Type: R + Other
Format: (R) Technical document.
Short description:
Report written in English and with parts available in Spanish, Italian, Portuguese and Greek, with the overall progress of the pilots during the Preparatory Actions.
Objectives
â— To summarize the actions taken
â— To assess the progress made in every pilot with respect to the baseline
Content and methodology:
This report will contain the following information:
â—‹ a report describing the sensors that have being deployed at every pilot site and their location
â—‹ a summary of the social actions carried out and their results
â—‹ a report with the state of the technologies to be deployed at the pilot sites
â—‹ a review in terms of the KPIs and the project baseline following the sustainability model defined in D1.3
Targets
Citizen, stakeholders and project partners.
Tasks involved
T1.4-1.6.
Relation with other deliverables
Update of the baseline measured in D1.3.
Programme: H2020-EU.3.5.4. - Topic(s): WASTE-6a-2015
download deliverable
|
Documents, reports |
2019-11-18 |