Opendata, web and dolomites

ProGeo

ProGeo

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 ProGeo project word cloud

Explore the words cloud of the ProGeo project. It provides you a very rough idea of what is the project "ProGeo" about.

technicians    pilot    market    generation    time    500    turnover    italian    fabricate    downs    ebitda    capacity    teg    install    divide    plant    ch4    demonstrated    engineers    benefits    staff    business    patented    emission    25    company    thanks    energy    10    synthetic    ups    strategic    kw    fast    plc    mwel    engineering    natural    revenue    independent    power    supplier    epc    managerial    active    position    medium    converting    carbon    industrialization    ton    electrical    mainly    sale    substations    lt    2015    mvp    electricity    mwh    additional    producer    start    figures    tax    methane    peak    possibility    shut    progeo    managers    precision    kwel    back    commercialization    competitive    construction    clear    owners    acting    flexibility    35    plan    emissions    producing    potentialities    amount    reduce    minimum    framework    modular    co2    source    lamep    store    dioxide    customers    consolidated    85    prototype    plants    consequent    small    pay    allowed    thermoelectric    mwth    ipp    preliminary    price    scope    fuelled    gas   

Project "ProGeo" data sheet

The following table provides information about the project.

Coordinator
PLC SYSTEM - SRL 

Organization address
address: ZONA INDUSTRIALE INDUSTRIALE LOC. PANTANO
city: ACERRA NA
postcode: 80011
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Italy [IT]
 Project website http://www.plcgroupspa.com/it/plc-system-progeo.php
 Total cost 3˙493˙750 €
 EC max contribution 2˙443˙875 € (70%)
 Programme 1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2015
 Funding Scheme SME-2
 Starting year 2016
 Duration (year-month-day) from 2016-06-01   to  2019-05-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    PLC SYSTEM - SRL IT (ACERRA NA) coordinator 2˙026˙886.00
2    LA. ME. P. DI CAMPOLUCCI ERINO & C.SOCIETA IN NOME COLLECTIVO IT (ROMA) participant 416˙988.00

Map

 Project objective

PLC System is an Italian medium company acting as a EPC and/or supplier for electrical plants/substations engineering and construction and as a IPP (independent power producer). The high technical and managerial capacity allowed to PLC to reach a consolidated position in the European energy sector, with a 2015 turnover of 35 M€ and a 85 figures staff, mainly composed by engineers and high level technicians. PLC is very active in the energy R&D, with the clear scope to fabricate and install its own products to be offered in the very competitive energy market. Within this framework, PLC developed ProGeo, a 500 kW Power-to-Gas modular unit able to store electricity by converting carbon dioxide (CO2) into synthetic methane (CH4) with high flexibility thanks to fast start-ups and shut-downs. The patented product will be offered to owners and managers of small Thermoelectric Generation (s-TEG, < 50 MWth) plants, who will have the possibility to store energy and avoid the sale of low-price electricity during low peak requirements (electricity market price < 20-30 €/MWh) and to reduce the CO2 emissions and the consequent carbon tax amount (5 ÷ 20 €/ton of CO2), producing an additional revenue source from the synthetic-CH4 generation. ProGeo will provide customers with the following benefits: • increasing of average electricity sale price = 25% • reduction of CO2 emission and tax = -10% • increasing of TEG plant EBITDA = up to 1 M€/y for a 20 MWel natural gas fuelled power plant • ProGeo pay-back time = 3 ÷ 4.5 years • reduced start-ups / shut-downs of the TEG PLC has developed a pilot prototype of 30 kWel, by which the technology potentialities have been demonstrated, has identified a strategic partner (LAMEP, a company operating in the field of precision engineering) and has defined a business plan with the assessment of the minimum viable product (MVP), the production cost and market price, a preliminary industrialization and commercialization plan.

 Deliverables

List of deliverables.
Certification, HAZOP & LCA Documents, reports 2019-11-22 10:57:43
Preliminary tests Documents, reports 2019-11-22 10:57:43

Take a look to the deliverables list in detail:  detailed list of ProGeo deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "PROGEO" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "PROGEO" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.;H2020-EU.2.3.1.)

iDriver (2015)

iDriver

Read More  

ECHYNOXE SILICA (2015)

Innovative long range daylighting system

Read More  

PVFINAL (2015)

Photo Voltaic Fully Integrated and Automated Line

Read More