Explore the words cloud of the GroutTube project. It provides you a very rough idea of what is the project "GroutTube" about.
The following table provides information about the project.
Coordinator |
DRECHSLER MARINE CONSULT APS
Organization address contact info |
Coordinator Country | Denmark [DK] |
Project website | http://dmc-underwater.com |
Total cost | 71˙429 € |
EC max contribution | 50˙000 € (70%) |
Programme |
1. H2020-EU.3.3. (SOCIETAL CHALLENGES - Secure, clean and efficient energy) 2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT)) 3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument) |
Code Call | H2020-SMEINST-1-2016-2017 |
Funding Scheme | SME-1 |
Starting year | 2016 |
Duration (year-month-day) | from 2016-07-01 to 2016-12-31 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | DRECHSLER MARINE CONSULT APS | DK (HJERM) | coordinator | 50˙000.00 |
The cost of installation of a typical offshore wind farm is approximately 40% to 50% more than that of an onshore wind farm and one of the main cost components is the underwater foundation. Thus, foundations installation, together with O&M costs, have been identified as interrelated R&D priorities for driving down offshore levelised cost of energy (LCOE) over the next 15 years. The SME behind the DMC GroutTube project, Drechsler Marine Consult (DMC), aims to pursue this major market opportunity by bringing its innovative equipment/concept – DMC GroutTube - for offshore grouting of multi-pile foundations of wind turbines, to commercial maturity through the testing, demonstration and certification of this new grouting system. The novel technology holds a range off clear advantages compared to the traditional grouting method used today. All these benefits provide an estimated grouting cost reduction of 68% (228k€ and 304k€ saved per each tripod and jacket foundations installed, respectively), representing a 3.8% LCOE reduction, per offshore wind turbine installed and doubling the number of foundations grouted per day. These saving represent a major step forward to achieve the goal of 5-11% reductions in LCOE that were set for 2015, which were not yet achieved. Overall, this project opens not only an important economic opportunity for DMC – expecting over €20 million profits, 5 years post-project – but will ultimately lead to a lower overall life cycle costs of offshore wind turbines, as well as reduced environmental impact of installation activities. Therefore, DMC GroutTube will directly contribute to low-cost, low-carbon electricity supply, thus directly addressing this important axis in EU energy strategy.
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "GROUTTUBE" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "GROUTTUBE" are provided by the European Opendata Portal: CORDIS opendata.