Explore the words cloud of the EXILVA project. It provides you a very rough idea of what is the project "EXILVA" about.
The following table provides information about the project.
Coordinator |
BORREGAARD AS
Organization address contact info |
Coordinator Country | Norway [NO] |
Project website | http://www.h2020-exilva.com |
Total cost | 44˙634˙926 € |
EC max contribution | 27˙433˙610 € (61%) |
Programme |
1. H2020-EU.3.2.6.3. (Sustainable biorefineries) 2. H2020-EU.3.2.6.1. (Sustainable and competitive bio-based industries and supporting the development of a European bio-economy) |
Code Call | H2020-BBI-PPP-2015-1-1 |
Funding Scheme | BBI-IA-FLAG |
Starting year | 2016 |
Duration (year-month-day) | from 2016-05-01 to 2020-04-30 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | BORREGAARD AS | NO (SARPSBORG) | coordinator | 25˙011˙757.00 |
2 | KUNGLIGA TEKNISKA HOEGSKOLAN | SE (STOCKHOLM) | participant | 1˙192˙627.00 |
3 | OSTFOLDFORSKNING AS | NO (KRAKEROY) | participant | 621˙790.00 |
4 | CHIMAR (HELLAS) AE - ANONYMI VIOMICHANIKI KAI EMPORIKI ETAIREIA CHIMIKON PROIONTON | EL (THERMI THESSALONIKI) | participant | 319˙270.00 |
5 | UNILEVER U.K. CENTRAL RESOURCES LIMITED | UK (LONDON) | participant | 157˙791.00 |
6 | AYMING | FR (GENNEVILLIERS CEDEX) | participant | 130˙375.00 |
The Exilva flagship project will consist in the upscaling of the Borregaard’s MFC process from the existing pilot plant (50-70 tons/year) to the full scale flagship plant (1000 tons/year) and demonstrate an industrial symbiosis between the biomass/forest industry (Norwegian Spruce) and application industries in a wide range of market segments by developing and commercialising added value (performances vs cost) products in a sustainable way. The ambition of the Exilva project is to make MFC commercially available on large quantities for the first time as well as develop the MFC market further in selected segments. The grand challenges of the Exilva flagship project are twofold: • Technology and process: related to the start-up of the flagship plant the main tasks and challenges will be testing of the new equipment, technology transfer from the pilot plant to the flagship plant, gaining operational experience, establishing the plant organization and quality control, establishing the appropriate process parameters for a stable full scale production of MFC and gaining experience with regards to logistics and handling of the MFC material. • Market: successful market penetration of MFC based products, product performance and cost, standards and regulation. The decision to invest in a first of a kind commercial plant is driven by business opportunities to use MFC in a wide range of market segments and applications and demonstrate that the investment in the flagship will be profitable. Borregaard has started to establish business pipelines towards different end user companies that will develop full products based on MFC formulations.
Wood panel prototype samples produced with MFC at pilot scale | Demonstrators, pilots, prototypes | 2019-10-29 12:26:46 |
Documents on methodology for MFC characterizations to tappi standardization committee. | Documents, reports | 2019-10-29 12:26:46 |
Batch of project promotional material (3) | Other | 2019-10-29 12:26:47 |
Batch of project promotional material (2) | Other | 2019-10-29 12:26:47 |
Publications (papers/presentations) on MFC-based products (2) | Documents, reports | 2019-10-29 12:26:46 |
LCA data sets available for open data access | Other | 2019-10-29 12:26:46 |
Publications (papers/presentations) on MFC-based products (1) | Documents, reports | 2019-10-29 12:26:46 |
Identity set | Other | 2019-10-29 12:26:46 |
Project public website | Websites, patent fillings, videos etc. | 2019-10-29 12:26:46 |
Batch of project promotional material (1) | Other | 2019-10-29 12:26:46 |
Take a look to the deliverables list in detail: detailed list of EXILVA deliverables.
year | authors and title | journal | last update |
---|---|---|---|
2019 |
Per A. Larsson, Anastasia V. Riazanova, Goksu Cinar Ciftci, Ramiro Rojas, Hans Henrik Øvrebø, Lars Wågberg, Lars A. Berglund Towards optimised size distribution in commercial microfibrillated cellulose: a fractionation approach published pages: 1565-1575, ISSN: 0969-0239, DOI: 10.1007/s10570-018-2214-4 |
Cellulose 26/3 | 2019-10-29 |
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "EXILVA" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "EXILVA" are provided by the European Opendata Portal: CORDIS opendata.
Flagship demonstration of an integrated plant towards large scale supply and market assessment of MFC
Read MoreBIOSKOH’s Innovation Stepping Stones for a novel European Second Generation BioEconomy
Read MoreCommercial flagship plant for bioethanol production involving a bio-based value chain built on lignocellulosic feedstock
Read More