Explore the words cloud of the EVIS project. It provides you a very rough idea of what is the project "EVIS" about.
The following table provides information about the project.
Coordinator |
BARRY CONTROL AEROSPACE
Organization address contact info |
Coordinator Country | France [FR] |
Project website | http://www.hutchinson.com |
Total cost | 570˙750 € |
EC max contribution | 399˙525 € (70%) |
Programme |
1. H2020-EU.3.4.5.5. (ITD Engines) |
Code Call | H2020-CS2-CFP02-2015-01 |
Funding Scheme | CS2-IA |
Starting year | 2016 |
Duration (year-month-day) | from 2016-07-04 to 2021-07-03 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | BARRY CONTROL AEROSPACE | FR (PARIS) | coordinator | 399˙525.00 |
In aircraft, one of the primary sources of vibration is the power plant. Engine vibration could lead to unnecessary expenses for replacing damaged components, cabin noise, crew and passenger discomfort, and structural fatigue. Hutchinson is the major supplier of aircraft main Power plant and APU Vibration Isolation Systems.
The “Engine Vibration Isolation Systems – EVIS” project main objective is to achieve improved engine mounting system in terms of technology and associated process enabling higher level of comfort for passengers. Throughout all the proposed developments a dedicated Cost and weight reduction optimization approach will be implemented so as to enable improved performances in comparison to existing engine mounting system.
So as to provide an innovative, lightweight, low-cost EVIS for the related TP Demonstrator engine, Hutchinson proposes to carry out the expected work for two distinctive concepts: • Concept 1: “Cost efficiency concept” based on the adaptation of existing engine mounts, • Concept 2: “Full technical concept” based on specifically developed engine mounts.
Both Concepts will be investigated through the same usual V-shape approach for “systems integration” as detailed below: • Establish technical specifications of the engine mounts • Use and adapt/tune if necessary existing engine mounts for the first delivery • Analyze first test campaign results to optimize the EVIS design • Manufacture and deliver optimized EVIS • Analyze second test campaign results
Hutchinson will then fully contribute through the above whole process to assist the Topic in evaluating and selecting the most efficient and effective engine suspension system for the TP Demonstrator engine.
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "EVIS" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "EVIS" are provided by the European Opendata Portal: CORDIS opendata.