The page lists 31 deliverables related to the research project "GRIDSOL".
title and desprition | type | last update |
---|---|---|
Report on advisory management proceduresD1.4. will describe the work and meetings of advisory boards, that will provide guidance during the project execution. It will also summarise the main conclusions of these advisory boards. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-04-07 |
Assessment of GRDISOL integration into the EU electric power systemThis deliverable summarises the results of the complete set of simulations aimed at evaluating the performance of GRIDSOL power plants connected to the European transmission network. Steady state, dynamic and power quality analysis are performed with commercial tools in order to identify potentialities, constraints and benefits for both GRIDSOL plants and the power network. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-11 |
Methodology assessment for Smart Renewable Hubs implementationThis deliverable will summarise the novel approach for energy project development of Smart Renewables Hubs tackling with regulatory and policy obstacles and proposing sustainable roadmaps towards EU decarbonisation goals up to 2050. It covers the activities done in Task 7.2 First of its kind (FOIK) projects and Task 7.3 Life Cycle and Cost Analysis (LCCA). Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-11 |
Assessment of GRIDSOL configuration feasibility in Non-Interconnected SystemsThis report will summarise the characteristic of the potential market niche of GRIDSOL in European islands. It will take into account the particular challenges associated with project development in islands, detect local particularities and propose mitigation actions. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-11 |
Power System impact and GRIDSOL potentialsThis deliverable will describe the conclusions of the non-marginal analysis of GRIDSOL integration in EU power systems. GRIDSOL potentials will be estimated based on different assumption on selected parameters and system developments. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-11 |
Feasibility of GRIDSOL solutionsThis deliverable will include the conclusions of the analysis and evaluation of GRIDSOL power plant with regard to costs of power production (LCOE) and CO2 emission. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-11 |
WP5 Executive summaryThis deliverable will integrate and summarise the tasks accomplished during WP5 and the main conclusions achieved during the development of the WP. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-11 |
GRIDSOL impact in summaryThis report will summarise the conclusions of the impact of GRIDSOL in existing systems, including its main potentials and opportunities. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-11 |
Project WorkshopsHolding of dedicated workshops by GRIDSOL consortium, both for facilitating the communication with the end users and keeping them informed about the progress and achievements of the project. One of them will be included under the umbrella of ICREAS conference (Practical Applications of Agents and Multi-Agent Sytem). Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Websites, patent fillings, videos etc. | 2020-03-06 |
Exploitation strategies and Market uptakeThe overall exploitation strategy of the consortium as a whole and of the partners will be described here. An in-depth market research will also be included. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-06 |
Assessment of GRIDSOL configuration technical performance adequacy in the non-interconnected systemsThis report will summarise the conclusions of the study of the dynamic behavior of the CSP stations in an island environment and of the assessment of different ancillary services. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-06 |
Assessment of GRIDSOL integration into the EU power system marketThis deliverable will describe the results of the assessment of GRIDSOL integration into the EU electricity market, which will be performed using the developed model and scenarios representative of the European wholesale electricity market. A pilot system of reduced size and representative of the European system (both in terms of market, adequacy and operation) is used in order to allow the checking of the performances of GRIDSOL plant. The evaluation of the possible incomes and costs for one year of GRIDSOL plant operation is provided for different scenarios (2020, 2030). Furthermore a quantitative analysis of the ancillary service markets will be carried out for selected countries. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-06 |
Dissemination final reportThis document will summarise project achievements. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-03-06 |
First Project Management Plan ReviewD1.6. will include the first revision of the Project Management Plan, at the end of the first reporting period. Any change in project execution, planning, etc., will be describe in this document. If required, an updated Gantt chart will be provided. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-27 |
Report describing the most suitable solar field configurations both trough and heliostat for a given site technology & cost and methodology used to identify themThe main features of the solar field configurations selected, regarding cost-efficiency and suitability for GRIDSOL plants (including parameters such as topography or latitude) will be described in this deliverable. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-27 |
Dissemination final eventA dedicated final dissemination event at the end of the project to summarise project achievements and open the channels for commercial exploitation of the project results will be organised, Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Websites, patent fillings, videos etc. | 2020-02-27 |
WP8 Executive SummaryThis deliverable will summarise and update the previous deliverables D8.1, D8.2 and D8.3 (IPR management, Innovative business models and legal issues and Exploitation strategies and market uptake). By this way, D8.4 will cover the work done related to IPR management, business models and exploitation activities during the whole project. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-27 |
Final Project Management Plan ReviewD1.7. will include the final revision of the Project Management Plan, at the end of the project. Any change in project execution, planning, etc., will be describe in this document. If required, an updated Gantt chart will be provided. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-02-27 |
Project Management PlanThis deliverable will provide a detailed Project Management Plan. For this aim, a Gantt chart and a Work Breakdown Structure (WBS) will be prepared. It will include a schedule per task, responsible partner related subtasks, related deliverables, and dependencies on other tasks. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2019-08-07 |
Other synchronous technologies Validation ReportThis report will summarise the results of the validation of simplified libraries of static production models for biomass power plants and non-renewable systems (such as coal or combined cycles): Validation will be carried out with commercially available software such as System Advisor Model (SAM) or Thermoflex. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2019-08-07 |
IPR management proceduresThis deliverable summarises the IPR strategy of the consortium, based on the project Consortium Agreement. This will monitor the protection of IPR within and outside the Consortium. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2019-08-07 |
Dissemination movieMedia release, a GRIDSOL video and media support will be created, in order to raise social awareness of the project, etc. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Websites, patent fillings, videos etc. | 2019-08-07 |
Project visual identity guidelinesGuidelines for a consistent format of the project’s identification will be created in order to ensure an adequate recognisability of the project. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Websites, patent fillings, videos etc. | 2019-08-07 |
Non-synchronous technologies Validation ReportThis report will summarise the results of the validation of simplified libraries of static and dynamic production models for PV plants and wind farms- Validation will be carried out with commercially available software such as System Advisor Model (SAM). Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2019-08-07 |
Methodology for GRIDSOL feasibility and adequacy assessmentThis deliverable will describe the methodology and procedures for the following steps to be performed within this WP (simulations of electricity market, settings assessment, etc.). Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2019-08-07 |
GRIDSOL website, regularly updatedThe website of the Project will be created and regularly updated. It will contain general project information, information about project results, news on the project activities. Two-level access to the web site (public and internal) will be established. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Websites, patent fillings, videos etc. | 2019-08-07 |
Consortium operating proceduresThis deliverable will describe the consortium operation procedures, that set the framework for a successful project management and monitoring. These procedures will include administrative forms, financial aspects, chain of custody, etc. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2019-08-07 |
Innovative business models and legal issuesD8.2. will describe the integrated business model of the project, able to best exploit project outcomes, while identifying barriers and anticipating and putting forward adequate measures for overcoming them. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2019-08-07 |
Dissemination materials leaflet, poster, info packageThis deliverable will consist of the production of standardised, high quality printed material for dissemination purposes. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Websites, patent fillings, videos etc. | 2019-08-07 |
Communication & dissemination planThis document will summarise the dissemination and communication strategy of GRIDSOL, covering coordination of the overall dissemination and communication efforts of the consortium and consideration of the information sensitivity issues emerged from the ethical framework and multicultural aspects. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2019-08-07 |
Electricity storage system Validation ReportModelling and validation (carried out with the results of TECNALIA’s proprietary software) of electricity storage systems, such as batteries and flywheels, will be described in this report. Validation results and the possible inclusion of additional storage technologies will be included in this document. Static and dynamic models will be used. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2019-08-07 |