The page lists 11 deliverables related to the research project "TIPA".
title and desprition | type | last update |
---|---|---|
Roadmap to Certification and Verification FrameworkProduce a Roadmap to Certification that sets out the steps required to achieve full certification of the PTO. Generalise Verification Framework for the benefit of the wider industry. This deliverable relates to task T2.5: Roadmap to Certification. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-04-16 |
Publicity material update – year 3Updated project commercialisation and communication material to showcase final project results; update to the project Communication Plan showing progress against plan. This deliverable relates to task T9.1. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-04-16 |
Publicity material update – year 2Updated project commercialisation and communication material to reflect progress and emerging findings during the build and lab test phases; update to the project Communication Plan showing progress against plan. This deliverable relates to task T9.1. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-04-16 |
Report on power electronic reliabilityReport on the findings and outputs of the reliability of power electronics task T7.4, setting out: lifetime under expected operating conditions; likely failure modes; key factors affecting the lifetime; and potential measures to improve reliability and lifetime. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-04-16 |
Commercialisation Strategy Public ReportAn external report to inform potential clients and investors of the commercial opportunities associated with this PTO, both for tidal power and any other applications identified in T8.1. This deliverable relates to task T8.6. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-04-16 |
Report on electrical generator reliabilityReport on the findings and outputs of the reliability of electrical generators task T7.3, setting out: lifetime under expected operating conditions; likely failure modes; key factors affecting the lifetime; and potential measures to improve reliability and lifetime. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-04-16 |
Project publicity materialInitial project commercialisation and communication material (web page, social media, flyers, articles and slides); update to the project Communication Plan showing progress against plan. This deliverable relates to task T9.1. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-01-24 |
Report on techno-economic toolsReport on the techno-economic tools to be used in the project, describing: the tools to be used, how they contribute to the project objectives and the interfaces with work packages of the project, including the design tools developed in WP7. This deliverable relates to task T8.1. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-01-24 |
Publicity material update – year 1Updated project commercialisation and communication material to reflect progress and emerging findings during the design phase; update to the project Communication Plan showing progress against plan. This deliverable relates to task T9.1. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-01-24 |
Project Verification FrameworkPublic report that sets out the approach and methodology that will be used in verifying the system design, lab test results and in-sea test results. This deliverable relates to task T2.1: Formalise project verification strategy. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-01-24 |
Project reliability frameworkA report that sets out: how the reliability of the PTO will be assessed at the product design stage; how reliability will be incorporated into the product design; how test results will be used to refine the reliability estimate; and how project findings will be incorporated into a refined PTO design. This deliverable relates to task T7.1. Programme: H2020-EU.3.3.2. - Topic(s): LCE-07-2016-2017 |
Documents, reports | 2020-01-24 |