title and desprition type last update

Go-to-Market strategy

A plan which contains a clear strategy and accompanying actions to brand and market the product and successfully introduce the product on the market.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2020-03-06

Evaluation of pilot cases (v3)

Reports results from case studies. It will include: description of the objectives, both general and specific; detailed description of the use case with the context information; methodology applied; results; critical analysis (strengths and weaknesses); mitigation actions (feedback for research and development).

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2020-03-06

Final release [*]

Platform satisfying all the elicited requirements. It will include the definition of an Application Programming Interface (API) exposing the capabilities of the delivered software solution.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Demonstrators, pilots, prototypes 2020-03-06

Evaluation of pilot cases (v2)

Reports results from case studies. It will include: description of the objectives, both general and specific; detailed description of the use case with the context information; methodology applied; results; critical analysis (strengths and weaknesses); mitigation actions (feedback for research and development).

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2020-03-06

Q-Rapids process description: “The Solution” [*]

The formal descriptions of the Q-Rapid process including key concepts, definitions, roadmaps, practices, and case examples and main constraints. Q-Rapids process quality and performance is validated by comparing Q-Rapids process performance and quality to baseline process provided in D2.1 deliverable. D2.4 deliverable will consolidate data from all use cases in cross-case analysis.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2020-03-06

Dashboard final development [*]

Final version of the dashboard implementing the complete specification as defined in D3.1. Minor adjustments may take place until the end of the project at M36.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Demonstrators, pilots, prototypes 2020-03-06

Q-Rapids process final report

A document summarizing all the work done in WP 2.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2020-03-06

Data gathering and analysis consolidated

Consolidated data gathering and analysis prototype.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Demonstrators, pilots, prototypes 2020-03-06

Dashboard specification [*]

A document providing the specification of the dashboard. It will comprise: an ontology for the semantic level; a backlog for the functional requirements; mock-ups for the user interface; a set of QRs expressed through Volere (http://www.volere.co.uk/). This deliverable will evolve during the project and updated versions will be delivered to the Commission at months 12, 24 and 36.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2020-03-06

Final release

Describes the final data gathering and analysis framework. It also includes the definition of an Application Programming Interface (API) exposing the frameworks’ functionality

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Demonstrators, pilots, prototypes 2020-03-06

Data gathering and analysis prototype

Prototype realizing the data gathering and analysis approach

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Demonstrators, pilots, prototypes 2020-03-06

Q-Rapids reference model and technologies white paper

This deliverable will include final conclusions from the project, merging key aspects of the final reports of the different activities, results and recommendations for future research. All partners in the project will contribute to this white paper (not computed as effort). Preliminary versions of this white paper will be made available starting at month 6 as a particular communication instrument but the document will not be considered closed until the end.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2020-03-06

Architectural blueprint [*]

Technical description of the software architecture used in the project.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2020-03-06

Dashboard consolidated prototype

A more elaborated prototype in which all the indicators will be defined and implemented (up to minor variations in the last year). A first set of techniques for prediction,
what-if analysis and mitigation will be implemented in the dashboard. The most important QRs will be successfully passed and in particular, the user interface will be near to final.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Demonstrators, pilots, prototypes 2020-03-06

Market survey report

Report on the survey conducted in T8.2, including the protocol and the results with most relevant observations.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2020-03-06

Product backlog [*]

Architectural-significant requirements in the form of user stories, with all the
necessary metadata (priority, effort estimation, …). Quality requirements will be subject of special attention, encoded either as user stories themselves or as acceptance criteria when they are local to a particular functionality

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2020-03-06

Baseline process definition: “State-of-the-practice” [*]

A document providing a descriptive analysis of the current processes applied in the use cases in order to manage quality requirements, baseline process problem definitions, baseline process models and improvement areas.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2020-03-06

Baseline process metrics: “Metrics to improve” [*]

Metrics of baseline process, performance and quality, e.g. quality requirements throughput times.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2020-03-06

Evaluation results and lessons learned

Packaging of the final results of the evaluation, including: conclusion from the summative evaluations and lessons learned. The aim of the document is to provide improvement suggestions to be taken into account for the commercialisation of the solution.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2020-03-06

Construction and validation of the Q-Rapids process: “Developing the solution (v1)”

Description of the construction steps and applied solutions for introducing the Q-Rapids process. D2.3 is expected to contain mainly experience reports, empirical studies, experiment reports and quantitative and qualitative case analysis on impacts of piloting Q-Rapids methods and tools to quality requirements lifecycle process in use cases.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Demonstrators, pilots, prototypes 2020-03-06

Business model

A report that describes the business model for a successful industrialization of the product. It will be updated at the end of the project

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2020-03-06

Exploitation and innovation plan [*]

A report that proposes the exploitation and innovation
plan that will guide these two activities along the project and the steps towards sustainability of the results after the end of the
project. The plan will be updated after the first and second year evaluations and at the end of the project.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2020-03-06

Dissemination, communication and collaboration plan [*]

The plan will specify the high level goals, strategy, target groups, conditions, technical details and communication channels to be used during the development of the dissemination, communication and collaboration activities. Also it will include project indicators (referenced in D6.2) to periodically assess the success of these activities. After month 3, the plan will be continuously updated and new versions will be released at M6, M12 and M24 for evaluation purposes.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2020-03-06

Dashboard final report

A final report presenting both the complete technical specification of the platform and the knowledge needed to operate it.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2020-03-06

Analysis of opportunities [*]

A report describing the state of the market with respect to similar frameworks. The deliverable will survey technologies, standards and practices related to the project. It will be updated throughout of the project and new releases will be publicly released at months 24 and 36.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2020-03-06

Industry requirements and validation plan [*]

Description of the full validation plan. It will include a holistic and overall description of such a plan based on elicited users’ expectations and corresponding scenarios, and then detailed plans for each of the forthcoming deliverables including: schedule for evaluation, evaluation methodology, elicitation of reference data from the use case providers, etc. The deliverable will be updated at the end of the first and second pilot evaluations by adding details concerning the forthcoming ones.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2020-03-06

Consolidated version

Implementation of techniques developed so far in an integrated view. Most fundamental quality requirements will be tested up to a satisfactory extent.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Demonstrators, pilots, prototypes 2020-03-06

Construction and validation of the Q-Rapids process: “Developing the solution (v2)” [*]

Description of the construction steps and applied solutions for introducing the Q-Rapids process. D2.3 is expected to contain mainly experience reports, empirical studies, experiment reports and quantitative and qualitative case analysis on impacts of piloting Q-Rapids methods and tools to quality requirements lifecycle process in use cases.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Demonstrators, pilots, prototypes 2020-03-06

Dissemination, communication and collaboration report (v3)

The deliverable will report (in more detail than in the periodic and final reports) the activities done at month 36, the adherence to the plan established in D7.1 and a critical analysis of the opportunities for the future.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2020-03-06

Dissemination, communication and collaboration report (v2)

The deliverable will report (in more detail than in the periodic and final reports) the activities done at month 24, the adherence to the plan established in D7.1 and a critical analysis of the opportunities for the future.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2020-03-06

Validation design [*]

Detailed designs for the evaluations in accordance with the validation plan defined in D5.1. The deliverable will be updated together with D5.1.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2020-03-06

The Q-Rapids community

A community of users organized around GitHub. It will include: strategic roadmap; definition of indicators for health assessment; repositories for code and for models. The state of the community will be reported in the Periodic Reports at M12, M24 and M36 for evaluation.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Other 2020-02-27

Proof-of-concept

Basic configuration of the platform to demonstrate that the envisaged architecture is actionable and allows integration of bespoke and external components.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Demonstrators, pilots, prototypes 2019-11-20

Data gathering and analysis specification [*]

Provides the specification of the data gathering and analysis architecture. It will comprise the functionality as well as the technological requirements and constraints.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2019-11-20

Data gathering and analysis proof-of-concept

Provides the description of a first set-up of the architecture for data gathering and analysis as a proof of concept.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Demonstrators, pilots, prototypes 2019-11-20

Dashboard proof-of-concept

An operational prototype that will include a first set-up of the dashboard. Its main purpose will be to demonstrate the overall concept of the dashboard to the use case providers in the consortium and to other possible actors for early feedback. Given that T3.4 and T3.5 will not be active at this time, the focus is to demonstrate the correct computation of some key indicators from real data coming from WP1.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Demonstrators, pilots, prototypes 2019-11-20

Project website [*]

To reach the highest possible number of stakeholders, and to stimulate the discussion among interested audience the project, we will use using an open forum section of the website. The domain will be acquired at the start of the project, and a preliminary website showing only the project leaflet will open at the end of Month 1. It will be gradually filled of content until arriving to the M6 deadline in which it will be fully-fledged. After month 6, the website will be continuously updated. A section with public approved project deliverables will be included.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Other 2019-11-20

Dissemination, communication and collaboration report (v1)

The deliverable will report (in more detail than in the periodic and final reports) the activities done at month 12, the adherence to the plan established in D7.1 and a critical analysis of the opportunities for the future.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2019-11-20

Evaluation of pilot cases (v1)

Reports results from case studies. It will include: description of the objectives, both general and specific; detailed description of the use case with the context information; methodology applied; results; critical analysis (strengths and weaknesses); mitigation actions (feedback for research and development).

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Documents, reports 2019-11-20

Project dissemination and communication instruments [*]

The complete collection of dissemination materials like logo, promotional materials (e.g., flyers, videos), social media channels (Twitter, LinkedIn, SlideShare, …) and similar. After month 3, material will be continuously updated and delivered.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016

download deliverable 

Other 2019-11-20