The page lists 40 deliverables related to the research project "Q-RAPIDS".
title and desprition | type | last update |
---|---|---|
Go-to-Market strategyA plan which contains a clear strategy and accompanying actions to brand and market the product and successfully introduce the product on the market. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2020-03-06 |
Evaluation of pilot cases (v3)Reports results from case studies. It will include: description of the objectives, both general and specific; detailed description of the use case with the context information; methodology applied; results; critical analysis (strengths and weaknesses); mitigation actions (feedback for research and development). Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2020-03-06 |
Final release [*]Platform satisfying all the elicited requirements. It will include the definition of an Application Programming Interface (API) exposing the capabilities of the delivered software solution. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Demonstrators, pilots, prototypes | 2020-03-06 |
Evaluation of pilot cases (v2)Reports results from case studies. It will include: description of the objectives, both general and specific; detailed description of the use case with the context information; methodology applied; results; critical analysis (strengths and weaknesses); mitigation actions (feedback for research and development). Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2020-03-06 |
Q-Rapids process description: “The Solution†[*]The formal descriptions of the Q-Rapid process including key concepts, definitions, roadmaps, practices, and case examples and main constraints. Q-Rapids process quality and performance is validated by comparing Q-Rapids process performance and quality to baseline process provided in D2.1 deliverable. D2.4 deliverable will consolidate data from all use cases in cross-case analysis. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2020-03-06 |
Dashboard final development [*]Final version of the dashboard implementing the complete specification as defined in D3.1. Minor adjustments may take place until the end of the project at M36. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Demonstrators, pilots, prototypes | 2020-03-06 |
Q-Rapids process final reportA document summarizing all the work done in WP 2. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2020-03-06 |
Data gathering and analysis consolidatedConsolidated data gathering and analysis prototype. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Demonstrators, pilots, prototypes | 2020-03-06 |
Dashboard specification [*]A document providing the specification of the dashboard. It will comprise: an ontology for the semantic level; a backlog for the functional requirements; mock-ups for the user interface; a set of QRs expressed through Volere (http://www.volere.co.uk/). This deliverable will evolve during the project and updated versions will be delivered to the Commission at months 12, 24 and 36. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2020-03-06 |
Final releaseDescribes the final data gathering and analysis framework. It also includes the definition of an Application Programming Interface (API) exposing the frameworks’ functionality Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Demonstrators, pilots, prototypes | 2020-03-06 |
Data gathering and analysis prototypePrototype realizing the data gathering and analysis approach Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Demonstrators, pilots, prototypes | 2020-03-06 |
Q-Rapids reference model and technologies white paperThis deliverable will include final conclusions from the project, merging key aspects of the final reports of the different activities, results and recommendations for future research. All partners in the project will contribute to this white paper (not computed as effort). Preliminary versions of this white paper will be made available starting at month 6 as a particular communication instrument but the document will not be considered closed until the end. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2020-03-06 |
Architectural blueprint [*]Technical description of the software architecture used in the project. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2020-03-06 |
Dashboard consolidated prototypeA more elaborated prototype in which all the indicators will be defined and implemented (up to minor variations in the last year). A first set of techniques for prediction, Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Demonstrators, pilots, prototypes | 2020-03-06 |
Market survey reportReport on the survey conducted in T8.2, including the protocol and the results with most relevant observations. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2020-03-06 |
Product backlog [*]Architectural-significant requirements in the form of user stories, with all the Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2020-03-06 |
Baseline process definition: “State-of-the-practice†[*]A document providing a descriptive analysis of the current processes applied in the use cases in order to manage quality requirements, baseline process problem definitions, baseline process models and improvement areas. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2020-03-06 |
Baseline process metrics: “Metrics to improve†[*]Metrics of baseline process, performance and quality, e.g. quality requirements throughput times. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2020-03-06 |
Evaluation results and lessons learnedPackaging of the final results of the evaluation, including: conclusion from the summative evaluations and lessons learned. The aim of the document is to provide improvement suggestions to be taken into account for the commercialisation of the solution. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2020-03-06 |
Construction and validation of the Q-Rapids process: “Developing the solution (v1)â€Description of the construction steps and applied solutions for introducing the Q-Rapids process. D2.3 is expected to contain mainly experience reports, empirical studies, experiment reports and quantitative and qualitative case analysis on impacts of piloting Q-Rapids methods and tools to quality requirements lifecycle process in use cases. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Demonstrators, pilots, prototypes | 2020-03-06 |
Business modelA report that describes the business model for a successful industrialization of the product. It will be updated at the end of the project Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2020-03-06 |
Exploitation and innovation plan [*]A report that proposes the exploitation and innovation Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2020-03-06 |
Dissemination, communication and collaboration plan [*]The plan will specify the high level goals, strategy, target groups, conditions, technical details and communication channels to be used during the development of the dissemination, communication and collaboration activities. Also it will include project indicators (referenced in D6.2) to periodically assess the success of these activities. After month 3, the plan will be continuously updated and new versions will be released at M6, M12 and M24 for evaluation purposes. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2020-03-06 |
Dashboard final reportA final report presenting both the complete technical specification of the platform and the knowledge needed to operate it. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2020-03-06 |
Analysis of opportunities [*]A report describing the state of the market with respect to similar frameworks. The deliverable will survey technologies, standards and practices related to the project. It will be updated throughout of the project and new releases will be publicly released at months 24 and 36. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2020-03-06 |
Industry requirements and validation plan [*]Description of the full validation plan. It will include a holistic and overall description of such a plan based on elicited users’ expectations and corresponding scenarios, and then detailed plans for each of the forthcoming deliverables including: schedule for evaluation, evaluation methodology, elicitation of reference data from the use case providers, etc. The deliverable will be updated at the end of the first and second pilot evaluations by adding details concerning the forthcoming ones. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2020-03-06 |
Consolidated versionImplementation of techniques developed so far in an integrated view. Most fundamental quality requirements will be tested up to a satisfactory extent. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Demonstrators, pilots, prototypes | 2020-03-06 |
Construction and validation of the Q-Rapids process: “Developing the solution (v2)†[*]Description of the construction steps and applied solutions for introducing the Q-Rapids process. D2.3 is expected to contain mainly experience reports, empirical studies, experiment reports and quantitative and qualitative case analysis on impacts of piloting Q-Rapids methods and tools to quality requirements lifecycle process in use cases. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Demonstrators, pilots, prototypes | 2020-03-06 |
Dissemination, communication and collaboration report (v3)The deliverable will report (in more detail than in the periodic and final reports) the activities done at month 36, the adherence to the plan established in D7.1 and a critical analysis of the opportunities for the future. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2020-03-06 |
Dissemination, communication and collaboration report (v2)The deliverable will report (in more detail than in the periodic and final reports) the activities done at month 24, the adherence to the plan established in D7.1 and a critical analysis of the opportunities for the future. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2020-03-06 |
Validation design [*]Detailed designs for the evaluations in accordance with the validation plan defined in D5.1. The deliverable will be updated together with D5.1. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2020-03-06 |
The Q-Rapids communityA community of users organized around GitHub. It will include: strategic roadmap; definition of indicators for health assessment; repositories for code and for models. The state of the community will be reported in the Periodic Reports at M12, M24 and M36 for evaluation. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Other | 2020-02-27 |
Proof-of-conceptBasic configuration of the platform to demonstrate that the envisaged architecture is actionable and allows integration of bespoke and external components. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Demonstrators, pilots, prototypes | 2019-11-20 |
Data gathering and analysis specification [*]Provides the specification of the data gathering and analysis architecture. It will comprise the functionality as well as the technological requirements and constraints. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2019-11-20 |
Data gathering and analysis proof-of-conceptProvides the description of a first set-up of the architecture for data gathering and analysis as a proof of concept. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Demonstrators, pilots, prototypes | 2019-11-20 |
Dashboard proof-of-conceptAn operational prototype that will include a first set-up of the dashboard. Its main purpose will be to demonstrate the overall concept of the dashboard to the use case providers in the consortium and to other possible actors for early feedback. Given that T3.4 and T3.5 will not be active at this time, the focus is to demonstrate the correct computation of some key indicators from real data coming from WP1. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Demonstrators, pilots, prototypes | 2019-11-20 |
Project website [*]To reach the highest possible number of stakeholders, and to stimulate the discussion among interested audience the project, we will use using an open forum section of the website. The domain will be acquired at the start of the project, and a preliminary website showing only the project leaflet will open at the end of Month 1. It will be gradually filled of content until arriving to the M6 deadline in which it will be fully-fledged. After month 6, the website will be continuously updated. A section with public approved project deliverables will be included. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Other | 2019-11-20 |
Dissemination, communication and collaboration report (v1)The deliverable will report (in more detail than in the periodic and final reports) the activities done at month 12, the adherence to the plan established in D7.1 and a critical analysis of the opportunities for the future. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2019-11-20 |
Evaluation of pilot cases (v1)Reports results from case studies. It will include: description of the objectives, both general and specific; detailed description of the use case with the context information; methodology applied; results; critical analysis (strengths and weaknesses); mitigation actions (feedback for research and development). Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Documents, reports | 2019-11-20 |
Project dissemination and communication instruments [*]The complete collection of dissemination materials like logo, promotional materials (e.g., flyers, videos), social media channels (Twitter, LinkedIn, SlideShare, …) and similar. After month 3, material will be continuously updated and delivered. Programme: H2020-EU.2.1.1. - Topic(s): ICT-10-2016 |
Other | 2019-11-20 |