The page lists 11 deliverables related to the research project "SMART".
title and desprition | type | last update |
---|---|---|
Report on algorithms for 2D image processingThe deliverable will report on algorithms to be developed in T3.2 for processing of different types of 2D images (thermal, night vision, 2D images of stereo cameras) for the purpose of object detection and recognition. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-01-2015 |
Documents, reports | 2019-10-29 |
Identification and generation of relevant information and data flow between input and output requirementsThis deliverable is a document on identification and generation of relevant information and data flow between input and output requirements. This deliverable is based on management of the marshalling yard that would control and monitor the entire system by optimizing marshalling paths (routing problem), wagon allocation, determining the required number of funds for starting the manoeuvre and time planning operations to be executed (scheduling) respecting the official timetable. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-01-2015 |
Documents, reports | 2019-10-09 |
Design of the passive vibration isolation systemThe deliverable will report on hardware solution integrated into prototype of the obstacle detection system which will lower the level of vibration transmitting from the locomotive to obstacle detection system to the acceptable level. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-01-2015 |
Documents, reports | 2019-10-09 |
Overall framework architecture and list of requirements for real-time marshalling yard management systemThis report gives an overall framework architecture of the yard management problem, based on the operational research techniques that cover simulation based rules, heuristic, dynamic programming with problem decomposition and mathematical programming. This deliverable will also include a report on list of requirements for real-time marshalling yard management, forming questionnaire form for marshalling yard operational requirements further used for data collecting (task 5.2 of WP5) and forming of database (task 6.1. and 6.2 of WP6). Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-01-2015 |
Documents, reports | 2019-10-09 |
Architectural design of the information system for supervision and management of marshalling yardsA prototype of architectural design of the information system for supervision and management of marshalling yards. This deliverable focuses on designing the architecture of the web-based information system for supervision and management of marshalling yards based on requirements and specifications defined in WP4. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-01-2015 |
Demonstrators, pilots, prototypes | 2019-10-09 |
Integration data in unique database of EU marshalling yardsA report on the data collected for EU marshalling yards, such as timetables of trains, the number of track station, the availability of tracks, number and characteristics of the incoming and outgoing trains, connection between incoming wagons and trains and departure times of trains, static and dynamic rules for priority vehicles, the capacity of station, etc. used for integration data in unique database of EU marshalling yards. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-01-2015 |
Documents, reports | 2019-10-09 |
SMART Dissemination, communication activities and exploitation planThe deliverable will report on plan for all SMART dissemination, communication and exploitation activities. This will include public website (initial set-up and constant updates), all project leaflets as well as promotion in different dissemination activities. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-01-2015 |
Documents, reports | 2019-10-09 |
Obstacle Detection System Requirements SpecificationThis deliverable integrates the results of T1.1 to T1.3, providing the list of requirements and specification for an obstacle detection system based on which RD will be performed in WP 2 and WP 3 , as well as WP 7 (Evaluation). Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-01-2015 |
Documents, reports | 2019-10-03 |
Report on selected sensors for multi-sensory system for obstacle detectionThe deliverable will report on requirements for selection of particular sensors as well as on the specifications for sensors selected in T2.1-T2.3. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-01-2015 |
Documents, reports | 2019-10-03 |
Identification of relevant information about train classification process and marshalling yard sorting methodsA report on identification of relevant information about train classification process in marshalling yard and marshalling yard sorting methods will include the analysis of the classification and sorting process performed in order to produce outbound trains with single-stage and multistage sorting modes of operation for shunting yards. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-01-2015 |
Documents, reports | 2019-10-03 |
Report on sub-systems conformance testingThis deliverable reports on the conformance testing of all sub-systems chosen and developed in T2.1-T2.4. Programme: H2020-EU.3.4.8.5. - Topic(s): S2R-OC-IP5-01-2015 |