The page lists 15 deliverables related to the research project "mF2C".
title and desprition | type | last update |
---|---|---|
D3.1.1 Security and privacy aspects for the mF2C Controller Block (IT-1)This deliverable will describe the security/privacy aspects required to design the mF2C Controller Block. An internal version of this deliverable in M20 will be used to feed into the WP3 tasks, taking over the Controller Block design for IT-2. Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016 |
Documents, reports | 2020-02-03 |
D5.2.1 mF2C solution demonstration and field trial results (validation IT-1)This document includes the design, implementation and evaluation of the proposed mF2C management system, based on the proposed tests in each use case scenario, for each iteration. Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016 |
Demonstrators, pilots, prototypes | 2020-02-03 |
D2.2.1 mF2C Security/Privacy Requirements and Features (IT-1)mF2C reports on security features as they evolve and get integrated into the framework for each iteration. These deliverables will contain aspects of security related activities carried out during the project for IT-1 in M4 and as final Task 2.2 outcome. An internal report is proposed in M20 to feed into WP3 and WP4 for the IT-2 PoC design. Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016 |
Documents, reports | 2020-02-03 |
D6.1 Dissemination strategy and planThis deliverable presents the dissemination strategy plan, the web-site structure, and an analysis of potential new market opportunities. Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016 |
Documents, reports | 2020-02-03 |
D3.3.1 mF2C Agent Controller Block integration (IT-1)This deliverable presents in M12 the preliminary feedback obtained from the integration tasks for IT-1, and is used by Task 5.1 in WP5 to start the overall integration. Later, at M32, this deliverable includes the final integrated system, hence constituting the final outcome of WP3. An internal report in M26 will be used for the IT-2 implementation. Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016 |
Documents, reports | 2020-02-03 |
D6.2.1 mF2C annual report on dissemination and standardization (Year 1)This deliverable contains all dissemination, standardization and exploitation activities carried out during the 1st project year. Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016 |
Documents, reports | 2020-02-03 |
D4.4.2 mF2C Interfaces (IT-1)This deliverable reports in M12 the first results for the implementation of the interfaces to be integrated into the mF2C PoC in IT-1 in WP5, an improved version for IT-2 will be produced in M32 for the final interfaces implementation. Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016 |
Documents, reports | 2020-02-03 |
D4.2.1 Design of the mF2C Platform block components and microagents (IT-1)This deliverable reports in M9 the IT-1 results coming from the design of the Platform Blocks and microagents that will feed into the integration activities in WP4. The final version in M30 constitutes the final report describing the definitive Platform Block and microagents design. An internal version is used for IT-2. Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016 |
Documents, reports | 2020-02-03 |
D4.1.1 Security and privacy aspects for the mF2C Gearbox block (IT-1)This deliverable will describe the security and privacy aspects required to design the F2C Gearbox block. An internal version of this deliverable in M20 will be used to feed into the WP4 tasks taking over the Gearbox block design for IT-2. Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016 |
Documents, reports | 2020-02-03 |
D2.3.1mF2C Architecture (IT-1)This deliverable is the mF2C architecture as it gets defined and updated and redefined during the project life time. A preliminary version in M6 will be used to deploy PoC IT-1 in WP3 and WP4 and a final version in M25 will constitute the final mF2C architectural design. Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016 |
Documents, reports | 2020-02-03 |
D4.3.1 mF2C Platform Manager blocks and microagents integration (IT-1)This deliverable presents in M12 the preliminary feedback obtained from the integration tasks for IT-1 and is used by WP4 design activities to fine tune their designs, leading into IT-2 (an internal report in M26). Later, in month 32, this deliverable includes the final integrated system, hence constituting the final outcome of WP4. Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016 |
Documents, reports | 2020-02-03 |
D2.1.1 Tracking Scientific, Technology and Business Trends (Version 1)This deliverable gives a generic overview of all relevant scientific technology and business trends of which the awareness is necessary for the project, and for the proposed area of research at large. Reporting is in M4 and M22 aligned to IT-1 and IT-2 respectively and in M334 including a global reporting on technology, business models and scientific trends. Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016 |
Documents, reports | 2020-02-03 |
D1.1.1 Project Plan (IT-1)Overall plan and vision for all activities happening in the project for each of the project’s iterations. It will aggregate WP level roadmaps and provide an overview of technical and business activities. Each WP will elaborate project plans according to the two main project iterations. In addition, it will contain each iteration of the Data management plan as described in section 2.2.7 including policies, mechanisms and strategies for standards, privacy issues, open access guarantees, among others. Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016 |
Open Research Data Pilot | 2020-02-03 |
D5.1.1 mF2C reference architecture (integration IT-1)This document will provide the description of the proposed architecture and management processes for each iteration where all the blocks work together in optimized fashion. For each iteration, the system is ready for the test trials and validation process. Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016 |
Documents, reports | 2020-02-03 |
D3.2.1 Design of the mF2C Controller Block (IT-1)This deliverable reports in M9 on the preliminary results coming from the design of the Controller Block for IT-1 that will in turn feed into the integration activities in Task 3.6. The final version in M30 constitutes the final report, describing the definitive Controller Blocks design. An internal version in M22 will be used to deploy IT-2 PoC. Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016 |
Documents, reports | 2020-02-03 |