LightKone: list of downloadable deliverables.
title and desprition
| type |
last update |
Report on generic edge computing (report + software)
The first deliverable reports on the results of Task T 5.1, including support for aggregation-based computations at the edge. The second deliverable reports the solutions developed in Task T 4.2 for supporting generic computation at the Edge (this includes a set of distributed protocols, their formal correctness proof, and experimental evaluation) as well as the initial prototypes of IoT applications. The third deliverable will present the set of mechanisms, and their integration in the previously defined protocols, to provide security guarantees and autonomic behaviour, and the final prototypes for IoT applications. The final deliverable will demonstrate that one of our application partners examples can be implemented on top of our infrastructure provider.
Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016
download deliverable
|
Documents, reports |
2020-02-19 |
Initial runtime edge computing system (report + software)
Four deliverables will be provided by this work package in the form of research reports, software, and user documentation. The reports will describe the outcome of the theoretical work and contributions throughout the four tasks, whereas the documentation will be targeted for end users of the artifacts. Each are described as follows:
• At M 12, the deliverable will include the prototype of the initial edge computing system and a report that desribes the algorithms and data structures used.
Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016
download deliverable
|
Documents, reports |
2020-02-19 |
Infrastructure support for aggregation in edge computing (report + software)
The first deliverable reports on the results of Task T 5.1, including support for aggregation-based computations at the edge. The second deliverable reports the solutions developed in Task T 4.2 for supporting generic computation at the Edge (this includes a set of distributed protocols, their formal correctness proof, and experimental evaluation) as well as the initial prototypes of IoT applications. The third deliverable will present the set of mechanisms, and their integration in the previously defined protocols, to provide security guarantees and autonomic behaviour, and the final prototypes for IoT applications. The final deliverable will demonstrate that one of our application partners examples can be implemented on top of our infrastructure provider.
Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016
download deliverable
|
Documents, reports |
2020-02-19 |
Formal requirements
Two deliverables will be provided: first, we will specify a set of informal application requirements, and second, we will select a subset of these and make formal specifications of their informal requirements. The latter subset will be used in the rest of the project to drive development of the edge-computing platform and its industrial application.
Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016
download deliverable
|
Documents, reports |
2020-02-19 |
Basic programming model for edge computing (report + software)
There will be four deliverables for this work package, giving three successive programming models for edge computing. Each programming model will be both a report and software. The software will be tightly coordinated with the corresponding deliverables of WP 3, which gives the runtime infrastructure. The connection between the two is the API of the runtime layer: the programming model layer will target this API. The definition of this API is a critical part of the success of the edge computing platform and will be the subject of collaboration between WP 3 and WP 4.
• The first-year deliverable will be a basic programming model, which is a completed and optimised version of the Selective Hearing model of the SyncFree project.
• The second-year deliverables will be an extended programming model, with extensions for the scenarios from WP 2.
• The third-year deliverable will be a final programming model, improved for scalability and robustness through feedback from the evaluations of WP 7, as well as a design for an end- user programming interface for the infrastructure provider.
Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016
download deliverable
|
Documents, reports |
2020-02-19 |
Year 2 activity report
Deliverable D 8.1 (M 03) consists of setting up the Project LightKone Web2.0 portal, mailing lists, wikis and other supporting tools. The other deliverables of this work package are yearly reports describing the status of the project during a year.
• The primary evidence for dissemination is the presentation of the deliverables at scientific venues (invited talks, conferences and workshops) and demonstrations at conferences, standardisation meetings, and trade conferences. This will be reported in the yearly activity report.
• The market research deliverables at each year end are the continuous process of performing market research to determine where our solution fits against the existing solutions brought to market in industry. This task is to ensure that our project has a clear differentiator in its approach, and stays grounded in the classes of applications that are being built.
• The business plan deliverables at each year are the continuous process of refining the business plan based on market research, the other deliverable and feedback from dissemination activities, ensuring the best possible product/market fit.
Note that all deliverables in LightKone are public (PU) except for the three business plan deliverables here, which are confidential (CO).
Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016
download deliverable
|
Documents, reports |
2020-02-19 |
Year 1 market research
Deliverable D 8.1 (M 03) consists of setting up the Project LightKone Web2.0 portal, mailing lists, wikis and other supporting tools. The other deliverables of this work package are yearly reports describing the status of the project during a year.
• The primary evidence for dissemination is the presentation of the deliverables at scientific venues (invited talks, conferences and workshops) and demonstrations at conferences, standardisation meetings, and trade conferences. This will be reported in the yearly activity report.
• The market research deliverables at each year end are the continuous process of performing market research to determine where our solution fits against the existing solutions brought to market in industry. This task is to ensure that our project has a clear differentiator in its approach, and stays grounded in the classes of applications that are being built.
• The business plan deliverables at each year are the continuous process of refining the business plan based on market research, the other deliverable and feedback from dissemination activities, ensuring the best possible product/market fit.
Note that all deliverables in LightKone are public (PU) except for the three business plan deliverables here, which are confidential (CO).
Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016
download deliverable
|
Documents, reports |
2020-02-19 |
Extended programming model for edge computing (report + software)
There will be four deliverables for this work package, giving three successive programming models for edge computing. Each programming model will be both a report and software. The software will be tightly coordinated with the corresponding deliverables of WP 3, which gives the runtime infrastructure. The connection between the two is the API of the runtime layer: the programming model layer will target this API. The definition of this API is a critical part of the success of the edge computing platform and will be the subject of collaboration between WP 3 and WP 4.
• The first-year deliverable will be a basic programming model, which is a completed and optimised version of the Selective Hearing model of the SyncFree project.
• The second-year deliverables will be an extended programming model, with extensions for the scenarios from WP 2.
• The third-year deliverable will be a final programming model, improved for scalability and robustness through feedback from the evaluations of WP 7, as well as a design for an end-user programming interface for the infrastructure provider.
Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016
download deliverable
|
Documents, reports |
2020-02-19 |
Year 2 market research
Deliverable D 8.1 (M 03) consists of setting up the Project LightKone Web2.0 portal, mailing lists, wikis and other supporting tools. The other deliverables of this work package are yearly reports describing the status of the project during a year.
• The primary evidence for dissemination is the presentation of the deliverables at scientific venues (invited talks, conferences and workshops) and demonstrations at conferences, standardisation meetings, and trade conferences. This will be reported in the yearly activity report.
• The market research deliverables at each year end are the continuous process of performing market research to determine where our solution fits against the existing solutions brought to market in industry. This task is to ensure that our project has a clear differentiator in its approach, and stays grounded in the classes of applications that are being built.
• The business plan deliverables at each year are the continuous process of refining the business plan based on market research, the other deliverable and feedback from dissemination activities, ensuring the best possible product/market fit.
Note that all deliverables in LightKone are public (PU) except for the three business plan deliverables here, which are confidential (CO).
Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016
download deliverable
|
Documents, reports |
2020-02-19 |
First report on heavy edge computing (report + software)
WP 6 has four deliverables reporting on the progress in the area of heavy edge application and infrastructure:
• The first-year deliverable describes the new concepts for heavy edge applications, their prob- lems and solution strategies, as well as the envisioned architectures of the applications.
• The second-year deliverable reports on the solution of selected concepts and the develop- ment of heavy edge applications.
• The third-year deliverable focusses on the description of the applied concepts, the realised infrastructure, and the evaluation techniques specific for heavy edge applications.
• The final deliverable will demonstrate that one of our application partners examples can be implemented on top of our infrastructure provider.
Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016
download deliverable
|
Documents, reports |
2020-02-19 |
Runtime system for edge computing with appl. support (report + software)
Four deliverables will be provided by this work package in the form of research reports, software, and user documentation. The reports will describe the outcome of the theoretical work and contributions throughout the four tasks, whereas the documentation will be targeted for end users of the artifacts. Each are described as follows:
• At M 24, the deliverable will include an updated prototype of the previous one that ad- dresses different categories of applications, accompanied with a report desribing the theo- retical work and used tools.
Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016
download deliverable
|
Documents, reports |
2020-02-19 |
Year 1 activity report
Deliverable D 8.1 (M 03) consists of setting up the Project LightKone Web2.0 portal, mailing lists, wikis and other supporting tools. The other deliverables of this work package are yearly reports describing the status of the project during a year.
• The primary evidence for dissemination is the presentation of the deliverables at scientific venues (invited talks, conferences and workshops) and demonstrations at conferences, standardisation meetings, and trade conferences. This will be reported in the yearly activity report.
• The market research deliverables at each year end are the continuous process of performing market research to determine where our solution fits against the existing solutions brought to market in industry. This task is to ensure that our project has a clear differentiator in its approach, and stays grounded in the classes of applications that are being built.
• The business plan deliverables at each year are the continuous process of refining the business plan based on market research, the other deliverable and feedback from dissemination activities, ensuring the best possible product/market fit.
Note that all deliverables in LightKone are public (PU) except for the three business plan deliverables here, which are confidential (CO).
Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016
download deliverable
|
Documents, reports |
2020-02-19 |
First evaluation report of edge applications (report + software)
WP 7 has two deliverables reporting on the evaluation of the technology developed in the project:
• The M 24 report will present an initial assessment of the techniques being developed, with initial prototypes that will not include all features and have limited scale.
• The M 36 report will present results of experiments performed with realistic size deploy- ments. Ease of programming will be assessed through the use of surveys to programmers.
The deliverables will include software and data so that the results can be reproduced by third parties.
Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016
download deliverable
|
Documents, reports |
2020-02-19 |
Web site and collaboration tools
Deliverable D 8.1 (M 03) consists of setting up the Project LightKone Web2.0 portal, mailing lists, wikis and other supporting tools. The other deliverables of this work package are yearly reports describing the status of the project during a year.
• The primary evidence for dissemination is the presentation of the deliverables at scientific venues (invited talks, conferences and workshops) and demonstrations at conferences, standardisation meetings, and trade conferences. This will be reported in the yearly activity report.
• The market research deliverables at each year end are the continuous process of performing market research to determine where our solution fits against the existing solutions brought to market in industry. This task is to ensure that our project has a clear differentiator in its approach, and stays grounded in the classes of applications that are being built.
• The business plan deliverables at each year are the continuous process of refining the business plan based on market research, the other deliverable and feedback from dissemination activities, ensuring the best possible product/market fit.
Note that all deliverables in LightKone are public (PU) except for the three business plan deliverables here, which are confidential (CO).
Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016
download deliverable
|
Documents, reports |
2020-02-19 |
Informal requirements
Two deliverables will be provided: first, we will specify a set of informal application requirements, and second, we will select a subset of these and make formal specifications of their informal requirements. The latter subset will be used in the rest of the project to drive development of the edge-computing platform and its industrial application.
Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016
download deliverable
|
Documents, reports |
2020-02-19 |
New concepts for heavy edge computing
WP 6 has four deliverables reporting on the progress in the area of heavy edge application and infrastructure:
• The first-year deliverable describes the new concepts for heavy edge applications, their prob- lems and solution strategies, as well as the envisioned architectures of the applications.
• The second-year deliverable reports on the solution of selected concepts and the develop- ment of heavy edge applications.
• The third-year deliverable focusses on the description of the applied concepts, the realised infrastructure, and the evaluation techniques specific for heavy edge applications.
• The final deliverable will demonstrate that one of our application partners examples can be implemented on top of our infrastructure provider.
Programme: H2020-EU.2.1.1. - Topic(s): ICT-06-2016
download deliverable
|
Documents, reports |
2020-02-19 |