The page lists 11 deliverables related to the research project "H2Future".
title and desprition | type | last update |
---|---|---|
Validated monitoring systemValidated monitoring system to calculate the use case KPIs Programme: H2020-EU.3.3.8.3. - Topic(s): FCH-02-7-2016 |
Other | 2020-04-16 |
Specifications of pilot test 5 / Use Case 5Specifications of Pilot test 5: Optimizing electricity supply and demand of the steel plant with the support of a PEM electrolyser (minimizing deviations to forecasted consumption) Programme: H2020-EU.3.3.8.3. - Topic(s): FCH-02-7-2016 |
Documents, reports | 2019-05-29 |
Specifications of quasi-commercial operationSpecifications of quasi-commercial operation: Operation to obtain revenues from power price opportunities, participation in the power industry’s balancing markets as well as provision of additional services to the grid Programme: H2020-EU.3.3.8.3. - Topic(s): FCH-02-7-2016 |
Documents, reports | 2019-05-29 |
Dissemination master PlanDissemination master Plan Programme: H2020-EU.3.3.8.3. - Topic(s): FCH-02-7-2016 |
Documents, reports | 2019-05-29 |
Specifications of final testsSpecifications of final tests: Continuous operation 24/7 part 2: facility ageing issues Programme: H2020-EU.3.3.8.3. - Topic(s): FCH-02-7-2016 |
Documents, reports | 2019-05-29 |
Specifications of pilot test 1/ Use Case 1Specifications of pilot test 1: Stress tests, Ramp-up and partial-load testing Programme: H2020-EU.3.3.8.3. - Topic(s): FCH-02-7-2016 |
Documents, reports | 2019-05-29 |
KPIs to monitor the demonstrations and perform the exploitation tasksKPIs to monitor the demonstrations and perform the exploitation tasks Programme: H2020-EU.3.3.8.3. - Topic(s): FCH-02-7-2016 |
Documents, reports | 2019-05-29 |
Public Web SiteProject web site available for public access Programme: H2020-EU.3.3.8.3. - Topic(s): FCH-02-7-2016 |
Websites, patent fillings, videos etc. | 2019-05-29 |
Specifications of pilot test 2 /Use Case 2Specifications of pilot test 2: Continuous operations 24/7 Programme: H2020-EU.3.3.8.3. - Topic(s): FCH-02-7-2016 |
Documents, reports | 2019-05-29 |
Specifications of pilot test 4 / Use Case 4Specifications of pilot test 4: Steel production via the electric arc furnace route and direct reduction utilizing hydrogen: 45min break, 15min operation Programme: H2020-EU.3.3.8.3. - Topic(s): FCH-02-7-2016 |
Documents, reports | 2019-05-29 |
Specifications of pilot test 3 / Use Case 3Specifications of pilot test 3: Technical testing of the PEM-facility to meet the requirements of the grid services and power price opportunities Programme: H2020-EU.3.3.8.3. - Topic(s): FCH-02-7-2016 |
Documents, reports | 2019-05-29 |