Opendata, web and dolomites

RUBSEE

Extending artificial intelligence revolution in the waste field beyond sorting

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 RUBSEE project word cloud

Explore the words cloud of the RUBSEE project. It provides you a very rough idea of what is the project "RUBSEE" about.

2008    operation    time    95    flows    recovering    2022    amounts    detecting    boost    profit    material    meet    421    directive    customer    revenues    payback    complete    200    tn    compliance    incinerated    urban    pet    thanks    optimize    1st    1200    plastics    20    regulatory    losses    cartons    sadako    142    actual    units    lost    7tn    recuperation    adapting    installation    wtp    data    3m    cans    disruptive    detection    plant    wasteful    household    technologies    spending    50    variability    valuable    content    thereof    incomes    intelligence    6000    2020    visionartificial    treatment    recover    ec    clients    gt    performance    5m    current    maintenance    market    recovers    net    aren    materials    39    hdpe    regulations    trl    assuming    clear    98    wall    bricks    recovery    bigger    computer    recovered    economic    complementary    efficient    plants    months    waste    industry    rubsee    investment    incremental    flow    landfilled    monitoring    additional    solution    solutions    levels    wtps    environmental   

Project "RUBSEE" data sheet

The following table provides information about the project.

Coordinator
SADAKO TECHNOLOGIES SL 

Organization address
address: CALLE MARTINEZ CUBELLS 7 1 1
city: VALENCIA
postcode: 46002
website: n.a.

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Spain [ES]
 Project website http://www.sadako.es/rubsee-project/
 Total cost 1˙800˙176 €
 EC max contribution 1˙260˙123 € (70%)
 Programme 1. H2020-EU.3.5. (SOCIETAL CHALLENGES - Climate action, Environment, Resource Efficiency and Raw Materials)
2. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument)
 Code Call H2020-SMEINST-2-2016-2017
 Funding Scheme SME-2
 Starting year 2017
 Duration (year-month-day) from 2017-02-01   to  2019-09-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    SADAKO TECHNOLOGIES SL ES (VALENCIA) coordinator 1˙260˙123.00

Map

 Project objective

Current WTPs (Waste Treatment Plants) aren’t able to recover all the valuable waste they process, indeed more valuable materials are lost and landfilled or incinerated. The reason of this wasteful spending is clear: current methods do not allow an increase in material recuperation in a cost-effective way: the incremental cost of recovering more materials is bigger than the market value of the additional materials recovered. Losses can reach 2,5M€/yr of high-value waste PET/HDPE plastics, cans, cartons). Current technologies aren’t enough to meet EU regulations like directive 2008/98/EC, which requires that 50% of household waste is recovered by 2020. Based in our 1st product (Wall-B), SADAKO has developed RUBSEE, a disruptive real-time monitoring system (using Computer visionArtificial intelligence) of waste flows in a WTP in order to optimize the performance/operation thereof and the recovery of different materials. RUBSEE will allow waste industry improve its economic, regulatory compliance and environmental performance with a solution that is cost efficient and complementary to actual solutions. In order to address present industry need, our goal is to scale from detecting just PET to HDPE, Cans and Bricks, increase/reach detection levels for each material up to >95%, and boost its TRL from 6 to 9. An average WTP plant, processes 7tn/h of urban waste with 39% content of PET, HDPE and Cans and recovers 6000 tn/year of PET, HDPE & Cans. Thanks to RUBSEE data, current equipment performance can be improved up to 20% by adapting their parameters to the variability of the waste flow on real time. This means 1200 Tn/year, increasing revenues up to 421,200€/yr for an average customer. Assuming that the complete RUBSEE installation cost amounts 142,000 € (10 RUBSEE units 6000 €/yr Maintenance costs), the investment payback will be 4.2 months for our clients. Thanks to this RUBSEE project, we expect a boost of the incomes (NET profit associated to RUBSEE: 2,3M€ in 2022)

 Deliverables

List of deliverables.
Report on dissemination activities during the period of the grant Documents, reports 2020-03-23 11:34:02

Take a look to the deliverables list in detail:  detailed list of RUBSEE deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "RUBSEE" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "RUBSEE" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.5.;H2020-EU.2.3.1.)

EPIC (2017)

Environmentally Friendly Recycled Plastic Floors in Containers

Read More  

PAIR (2015)

Plasma active pollution control system

Read More  

ProTreaT (2015)

FEASIBILITY ASSESSMENT OF THE GREEN “ProTreaT” TECHNOLOGY FOR PROTEIN-BASED, NATURAL REMOVAL OF HEAVY METALS FROM WATER AND WASTEWATER

Read More