The page lists 15 deliverables related to the research project "WATERPROTECT".
title and desprition | type | last update |
---|---|---|
Inventory of available mitigation and BMPs including cost-effectiveness analysisInventory of available mitigation and BMPs including cost-effectiveness analysis. (ITP, M6) Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016 |
Documents, reports | 2020-02-19 |
Framework for developing and analysing water governance systemsReport detailing the framework for developing and analysing water governance systems. ILVO is responsible partner, together with EWP, UCSC and UCPH and with contributions from all project partners. Deliverable conceptualizing water governance and highlighting the dimensions and attributes of any water governance system that determine its outcome, along with an operationalization to guide the development and structure the analysis of water governance systems. Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016 |
Documents, reports | 2020-02-19 |
Integration of best examples into online platform, the Water Action HubIntegrate best examples into online platform, the Water Action Hub. Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016 |
Websites, patent fillings, videos etc. | 2020-02-19 |
Development of strategies to realise the improved take up of mitigation measures and BMPsDevelopment of strategies to realise the improved take up of mitigation measures and BMPs.(ITP, M18) Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016 |
Documents, reports | 2020-02-19 |
Technical report summarising the conceptual understanding of the natural system in the case studyTechnical report summarising the conceptual understanding of the natural system in the case study. Where adequate, the conceptual model is implemented in an operational numerical model. Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016 |
Documents, reports | 2020-02-19 |
Final roadmapProduction of final roadmap for publication. Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016 |
Documents, reports | 2020-02-19 |
Summary report on user requirements analysis for collaborative tool in each case study areaSummary report on user requirements analysis for collaborative tool in each case study area (M 6). GEUS is responsible partner. All case study partners are responsible for providing case study specific results to the report. Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016 |
Documents, reports | 2020-02-19 |
Communication and Dissemination Plan + Stakeholder databaseThe Communication and Dissemination Plan will outline the specifics, procedures and timelines for external dissemination among stakeholders outside the consortium to exploit the projects’ results and to ensure fast deployment of the mitigation measures, tools and management practices concerned. The Communication and Dissemination Plan will also include the development of a set of communication and dissemination materials to promote the project’s activities and results. The plan will explain in detail objectives, procedures and strategies, target groups, tools and activities for each target group, procedures for the participation in events and conferences, synergies with other projects, timetable, indicative budget and impact indicators. The plan will be developed at the beginning of the project (M4) and an updated version of the plan, adjusted to the project achievements, will be presented during M18. Adjacent to the communication and dissemination plan, a stakeholder database (including stakeholder contact details) will be established to facilitate knowledge sharing of relevant stakeholders between consortium partners and facilitate further communication between the consortium and stakeholders. Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016 |
Other | 2020-02-19 |
Project website and social media operationalThe project website will enable a widespread dissemination of the project, its objectives, results, partners and approach and will include both a public and a private area, the latter reserved to consortium members as a platform for knowledge sharing. Dedicated sections will be created to present the individual case studies, general information on the project and detailed information about the innovative farming systems and mitigation measures that have been identified to deliver good water quality. The website will remain operative for 2 years after the project has ended. In addition, social media profiles (Twitter, LinkedIn, ResearchGate, YouTube, Vimeo, etc.) will be set up to touch the general public in an attractive way. Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016 |
Websites, patent fillings, videos etc. | 2020-02-19 |
Policy report and recommendations highlighting the policy related water quality driving factors as well as the level of integration of water and agricultural policies in the case study areasThe report will look at the management system and policies in place, see where the policies are likely to have the biggest positive or negative impact and will recommend improvements. UCSC is responsible partner. Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016 |
Documents, reports | 2020-02-19 |
Inventory of applied mitigation measures and BMPs in pilot case study areas and assessment of the potential for the uptake of new ideasInventory of applied mitigation measures and BMPs in pilot case study areas and assessment of the potential for the uptake of new ideas.(ITP, M12) Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016 |
Documents, reports | 2020-02-19 |
Exchange of BMPs at EU level, using the format of EIP index cards for relevant BMPsExchange of BMPs at EU level, using the format of EIP index cards for relevant BMPs.(ITP, M14) Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016 |
Documents, reports | 2020-02-19 |
Summary report on the functional analysis and design of collaborative tool in each case study areaSummary Report on the functional analysis and design of collaborative tool in each case study area (M 12) VITO is responsible partner. All case study partners are responsible for providing case study specific results to the report. Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016 |
Documents, reports | 2020-02-19 |
Complete comparative case study assessment mapping existing examples, water management systems and compare to WaterProtect case studiesComplete comparative case study assessment mapping existing examples, water management systems and compare to WaterProtect case studies. Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016 |
Documents, reports | 2020-02-19 |
Identification of key end users to which to upscale project roadmapReport identifying key end users to which to upscale project roadmap. Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016 |
Documents, reports | 2020-02-19 |