WATERPROTECT project deliverables

The page lists 15 deliverables related to the research project "WATERPROTECT".

 List of Deliverables

WATERPROTECT: list of downloadable deliverables.
title and desprition type last update

Inventory of available mitigation and BMPs including cost-effectiveness analysis

Inventory of available mitigation and BMPs including cost-effectiveness analysis. (ITP, M6)

Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016

download deliverable 

Documents, reports 2020-02-19

Framework for developing and analysing water governance systems

Report detailing the framework for developing and analysing water governance systems. ILVO is responsible partner, together with EWP, UCSC and UCPH and with contributions from all project partners. Deliverable conceptualizing water governance and highlighting the dimensions and attributes of any water governance system that determine its outcome, along with an operationalization to guide the development and structure the analysis of water governance systems.

Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016

download deliverable 

Documents, reports 2020-02-19

Integration of best examples into online platform, the Water Action Hub

Integrate best examples into online platform, the Water Action Hub.

Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016

download deliverable 

Websites, patent fillings, videos etc. 2020-02-19

Development of strategies to realise the improved take up of mitigation measures and BMPs

Development of strategies to realise the improved take up of mitigation measures and BMPs.(ITP, M18)

Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016

download deliverable 

Documents, reports 2020-02-19

Technical report summarising the conceptual understanding of the natural system in the case study

Technical report summarising the conceptual understanding of the natural system in the case study. Where adequate, the conceptual model is implemented in an operational numerical model.

Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016

download deliverable 

Documents, reports 2020-02-19

Final roadmap

Production of final roadmap for publication.

Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016

download deliverable 

Documents, reports 2020-02-19

Summary report on user requirements analysis for collaborative tool in each case study area

Summary report on user requirements analysis for collaborative tool in each case study area (M 6). GEUS is responsible partner. All case study partners are responsible for providing case study specific results to the report.

Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016

download deliverable 

Documents, reports 2020-02-19

Communication and Dissemination Plan + Stakeholder database

The Communication and Dissemination Plan will outline the specifics, procedures and timelines for external dissemination among stakeholders outside the consortium to exploit the projects’ results and to ensure fast deployment of the mitigation measures, tools and management practices concerned. The Communication and Dissemination Plan will also include the development of a set of communication and dissemination materials to promote the project’s activities and results. The plan will explain in detail objectives, procedures and strategies, target groups, tools and activities for each target group, procedures for the participation in events and conferences, synergies with other projects, timetable, indicative budget and impact indicators. The plan will be developed at the beginning of the project (M4) and an updated version of the plan, adjusted to the project achievements, will be presented during M18. Adjacent to the communication and dissemination plan, a stakeholder database (including stakeholder contact details) will be established to facilitate knowledge sharing of relevant stakeholders between consortium partners and facilitate further communication between the consortium and stakeholders.

Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016

download deliverable 

Other 2020-02-19

Project website and social media operational

The project website will enable a widespread dissemination of the project, its objectives, results, partners and approach and will include both a public and a private area, the latter reserved to consortium members as a platform for knowledge sharing. Dedicated sections will be created to present the individual case studies, general information on the project and detailed information about the innovative farming systems and mitigation measures that have been identified to deliver good water quality. The website will remain operative for 2 years after the project has ended. In addition, social media profiles (Twitter, LinkedIn, ResearchGate, YouTube, Vimeo, etc.) will be set up to touch the general public in an attractive way.

Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016

download deliverable 

Websites, patent fillings, videos etc. 2020-02-19

Policy report and recommendations highlighting the policy related water quality driving factors as well as the level of integration of water and agricultural policies in the case study areas

The report will look at the management system and policies in place, see where the policies are likely to have the biggest positive or negative impact and will recommend improvements. UCSC is responsible partner.

Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016

download deliverable 

Documents, reports 2020-02-19

Inventory of applied mitigation measures and BMPs in pilot case study areas and assessment of the potential for the uptake of new ideas

Inventory of applied mitigation measures and BMPs in pilot case study areas and assessment of the potential for the uptake of new ideas.(ITP, M12)

Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016

download deliverable 

Documents, reports 2020-02-19

Exchange of BMPs at EU level, using the format of EIP index cards for relevant BMPs

Exchange of BMPs at EU level, using the format of EIP index cards for relevant BMPs.(ITP, M14)

Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016

download deliverable 

Documents, reports 2020-02-19

Summary report on the functional analysis and design of collaborative tool in each case study area

Summary Report on the functional analysis and design of collaborative tool in each case study area (M 12) VITO is responsible partner. All case study partners are responsible for providing case study specific results to the report.

Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016

download deliverable 

Documents, reports 2020-02-19

Complete comparative case study assessment mapping existing examples, water management systems and compare to WaterProtect case studies

Complete comparative case study assessment mapping existing examples, water management systems and compare to WaterProtect case studies.

Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016

download deliverable 

Documents, reports 2020-02-19

Identification of key end users to which to upscale project roadmap

Report identifying key end users to which to upscale project roadmap.

Programme: H2020-EU.3.2.1.1.;H2020-EU.3.2.1.3.;H2020-EU.3.2.1.2. - Topic(s): RUR-04-2016

download deliverable 

Documents, reports 2020-02-19