PlastiCircle project deliverables
							
							
	
The page lists 8 deliverables related to the research project "PlastiCircle".
		 List of Deliverables
		
		
		PlastiCircle: list of downloadable deliverables.
		
			
				| title and desprition
				 | type | 
				last update | 
			
		
		
				
					
						Specifications required by end users and comparison with sorted material. Pretreatment needed. Draft
						[D5.1]	Specifications required by end users and comparison with sorted material. Pretreatment needed. Draft [AXION, M15].  
-This deliverable will include the preliminary results of T5.1. 
-It will be a report describing the technical specifications required in the material for each one of the applications to be developed: foam boards, automotive parts, bituminous roofing membranes, garbage bags and urban furniture. Also, a comparative will be done with the properties of the materials obtained in WP4.  
-This deliverable will be the basis for T5.2., T5.3. and T5.4. 
						Programme: H2020-EU.3.5.4. - Topic(s): CIRC-01-2016-2017 
						download deliverable  
					 | 
					Documents, reports | 
					2020-04-08 | 
				
			
				
					
						System design and preliminary specifications
						System design and preliminary specifications [SAV; M6]:  
- This deliverable will include the results of T2.1. including the container design and architecture, list of materials and component and flow diagrams.  
-The information on this deliverable will be the basis for T2.2. to 2.7. and WP3. 
						Programme: H2020-EU.3.5.4. - Topic(s): CIRC-01-2016-2017 
						download deliverable  
					 | 
					Documents, reports | 
					2020-04-08 | 
				
			
				
					
						Dissemination and communication plan [ICLEI, M6].
						[D9.3]	Dissemination and communication plan [ICLEI, M6].  
-This deliverable is based on the results of T9.1 and T9.5. 
-It is a scheme and report of the planned dissemination and communication activities. 
-This deliverable is the basis for T9.2 and T9.6. 
						Programme: H2020-EU.3.5.4. - Topic(s): CIRC-01-2016-2017 
						download deliverable  
					 | 
					Documents, reports | 
					2020-04-08 | 
				
			
				
					
						Training Plan [SAV, M10].
						[D9.5] Training Plan [SAV, M10]. 
-This deliverable is based on the results of T9.3.  
-It is a scheme and report of the planned training activities. 
						Programme: H2020-EU.3.5.4. - Topic(s): CIRC-01-2016-2017 
						download deliverable  
					 | 
					Documents, reports | 
					2020-04-08 | 
				
			
				
					
						Technical description of the sorter to be developed
						[D4.2] Technical description of the sorter to be developed [PICVISA, M16].  
-This deliverable is based on the results of T4.2. and T4.3. 
-It is a report describing the technical specifications and design of the sorter: THz (Tera-Hertz) imaging and Whisk Broom Scanner. 
-This deliverable is the basis for T4.4. and T4.5. 
						Programme: H2020-EU.3.5.4. - Topic(s): CIRC-01-2016-2017 
						download deliverable  
					 | 
					Documents, reports | 
					2020-04-08 | 
				
			
				
					
						Life cycle definition and description
						[D7.1]	Life cycle definition and description [ITENE, M8].  
-This deliverable is based on the results of T7.1. 
- It will include the life cycle model of the current plastic waste collection, transport, sorting and treatment in the three cities and in a EU level. 
-This deliverable is the basis for T7.2., T7.3., T7.4., T7.5. and T7.6. 
						Programme: H2020-EU.3.5.4. - Topic(s): CIRC-01-2016-2017 
						download deliverable  
					 | 
					Documents, reports | 
					2020-04-08 | 
				
			
				
					
						Definition of the PlastiCircle data management plan [ICLEI, M6].
						[D9.2]	Definition of the PlastiCircle data management plan [ICLEI, M6].  
-This deliverable is based on the results of all WPs 
-It is a plan on how to manage the data generated within the project.  Concretely it is a first version of the PlastiCircle Data Management Plan, including the link to PlastiCircle portal. 
-This deliverable is the basis for dissemination and communication activities 
						Programme: H2020-EU.3.5.4. - Topic(s): CIRC-01-2016-2017 
						download deliverable  
					 | 
					Open Research Data Pilot | 
					2020-04-08 | 
				
			
				
					
						Visual identity: logo and templates
						D9.1] Visual identity: logo and templates [ICLEI, M3].  
-This deliverable is based on the results of T9.6. 
						Programme: H2020-EU.3.5.4. - Topic(s): CIRC-01-2016-2017 
						download deliverable  
					 | 
					Websites, patent fillings, videos etc. | 
					2020-04-08 |