The page lists 5 deliverables related to the research project "METRO-HAUL".
title and desprition | type | last update |
---|---|---|
D2.1. Definition of Use Cases, Service Requirements and KPIsThe deliverable will include all the work done in T2.1 and is based on inputs from M2.1 and following discussions and elaborations on KPIs. The document will include a presentation of all the Use Cases selected to be taken as a reference of the project, a list of relevant Services with their requirements and SLAs and the METRO-HAUL associated KPIs obtained from a mapping of Service requirements and 5G general capabilities to the METRO-HAUL scope. The document is a standard report with potential attachments to provide details on architecture and services (spreadsheets, high resolution pictures). Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2019-05-31 |
D4.1. METRO-HAUL Control and Management Requirements and FrameworkD4.1 will report the initial design for the control architecture, justifying design choices and deployment models. D4.1 will cover a preliminary specification of the interfaces in view of integration and interoperability. D4.1 will list selected components to be developed and which ones will be integrated in full demonstration scenarios with WP5. For each component, D4.1 will detail its implementation roadmap, functional regression and integration tests, and the means to validate the implementation, including control KPIs. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2019-05-31 |
D3.1. Selection of metro node architectures and optical technology optionsD3.1 reports details of the Metro Node and OIE architectures together with the relevant design guidelines for access metro and metro core edge nodes. The design guidelines and specifications for the technical implementation of the OIEs and the interconnection aspects with access and core networks to be developed in the T3.2-T3.4 will be reported. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2019-05-31 |
D5.1. Report on Vertical Use Cases Performance metricsAnalysis of the vertical uses cases will form the basis for the report on Key Performance Indicators, that can be used by WP3, WP4 and WP5 in their design criteria. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |
Documents, reports | 2019-05-31 |
D6.1. METRO-HAUL Year1 report on communication, dissemination and standardisation activitiesD6.1 will summarize the carried-out activities during the first year of the project, this includes creation of the project knowledge site; developing dissemination strategy plans for initial dissemination and exploitation plans, and communicating across the METRO-HAUL partners, and identification of which SDOs to target for METRO-HAUL work proposals. It will also include an Education Plan defining METRO-HAUL strategy for external education on key technologies. Programme: H2020-EU.2.1.1. - Topic(s): ICT-07-2017 |