Opendata, web and dolomites

PLUG-N-HARVEST project deliverables

The page lists 26 deliverables related to the research project "PLUG-N-HARVEST".

 List of Deliverables

PLUG-N-HARVEST: list of downloadable deliverables.
title and desprition type last update

Dissemination Activities Annual Report

Dissemination Activities Annual Report. This report will be delivered periodically every 12 months. The first version in M12, the second one in M24, the third one in M36 and the last one in month 51.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17

Guidelines On Circular Economy Design Delimitants And Conditioners

Guidelines On Circular Economy Design Delimitants And Conditioners. The first version of this report will be delivered in M18 and the updated version in M36.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17

Plug-N-Play Optimal Energy Management System (OEMS) at District/Grid Level

Plug-N-Play Optimal Energy Management System (OEMS) at District/Grid Level. The first version of this report will be delivered in M18 and the updated version in M39.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17

Report On Standardization Models

Report On Standardization Models. This report will be delivered periodically every 12 months. The first version in M12, the second one in M24, the third one in M36 and the last one in month 51.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17

Active-façade CFD simulation and optimization guidelines

Active-façade CFD simulation and optimization guidelines. The first version of this report will be delivered in M15 and the updated version in M33.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17

Use Case Site Survey and Audit Report

Use Case Site Survey and Audit Report. The first version of this report will be delivered in M12 and the updated version in M30.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17

PLUG-N-HARVEST ADBE Advanced Design

PLUG-N-HARVEST ADBE Advanced Design. The first version of this report will be delivered in M18 and the updated version in M36.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17

Progress Periodic Management Reports

Progress Periodic Management Reports. This report will be delivered/updated three times during the project. The first version in M12, the second one in M24 and the last one in month 36.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17

Exploitation Plans

Exploitation Plans. This report will be delivered periodically every 12 months. The first version in M12, the second one in M24, the third one in M36 and the last one in month 51.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17

Evaluation Plan

Evaluation Plan. The first version of this report will be delivered in M12 and the updated version in M30.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17

Project Website & Social Media

Project Website & Social Media

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17

Risk Assessment

Risk Assessment

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17

Plug-n-Play Intelligent Management and Control System (IMCS) for ADBE

Plug-n-Play Intelligent Management and Control System (IMCS) for ADBE. The first version of this report will be delivered in M18 and the updated version in M39.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17

Data Management Plan

Data Management Plan. This report will be delivered/updated three times during the project. The first version in M18, the second one in M24 and the last one in month 36.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Open Research Data Pilot 2019-09-17

Dissemination Plans and Promotion

Dissemination Plans and Promotion. This report will be delivered/updated three times during the project. The first version in M6, the second one in M24 and the last one in month 36.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17

End-Users and Business Requirements Report

End-Users and Business Requirements Report. The first version of this report will be delivered in M12 and the updated version in M30.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17

Materials Database Web Tool

Materials Database Web Tool. The first version of this report will be delivered in M18 and the updated version in M36.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Websites, patent fillings, videos etc. 2019-09-17

Privacy and Security Components Description

Privacy and Security Components Description. The first version of this report will be delivered in M18 and the updated version in M39.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17

Market Analysis & Business Plan

Market Analysis & Business Plan. This report will be delivered periodically every 12 months. The first version in M12, the second one in M24, the third one in M36 and the last one in month 51.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17

Quality Assessment Plan

Quality Assessment Plan

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17

PLUG-N-HARVEST ADBE Simulative Tests Evaluation

PLUG-N-HARVEST ADBE Simulative Tests Evaluation. The first version of this report will be delivered in M18 and the updated version in M36.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17

Ethical monitoring & Contingency Plans

Ethical monitoring & Contingency Plans

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17

Systems engineering requirements definition

Systems engineering requirements definition. The first version of this report will be delivered in M12 and the updated version in M30.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17

Methodology To Check The Degree Of Compliance Of CE Principles On The Initial Stages Of Design

Methodology To Check The Degree Of Compliance Of CE Principles On The Initial Stages Of Design. The first version of this report will be delivered in M18 and the updated version in M27.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Other 2019-09-17

Project Management

Project Management

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17

Control Safety Mechanisms

Control Safety Mechanisms. The first version of this report will be delivered in M18 and the updated version in M39.

Programme: H2020-EU.2.1.5.2. - Topic(s): EEB-07-2017

download deliverable 

Documents, reports 2019-09-17