The page lists 17 deliverables related to the research project "ASTRail".
title and desprition | type | last update |
---|---|---|
Proposed GNSS Minimum Performance RequirementsDeliverable D1.6 will present the results of Task 1.8 corresponding to item h of work stream 1. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-01-2017 |
Documents, reports | 2020-02-07 |
Validation ReportThis final deliverable will present the full modelling of the Moving Block integrated with Automated Driving Technologies developed in Task 4.4. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-01-2017 |
Documents, reports | 2020-02-07 |
GNSS Solutions ReportOutcomes of Task 1.7 will be presented in this deliverable that is associated to item f of work stream 1. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-01-2017 |
Documents, reports | 2020-02-07 |
Report on the project results/achievements for future S2R activitiesThe final report summarising the main results achieved in the project, best practise for future S2R activities, etc… will be provided at the end of the project by Task 5.3. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-01-2017 |
Documents, reports | 2020-01-13 |
Dissemination and Exploitation activitiesThe final report summarising the results/impacts of all the dissemination, communication and exploitation activities of ASTRail will be prepared by Task 5.1. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-01-2017 |
Documents, reports | 2020-01-13 |
Preliminary Trial ReportThis deliverable will present the trial modelling of the Moving Block according to selected formal modelling techniques done in Task 4.3. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-01-2017 |
Documents, reports | 2019-10-03 |
Report on Preliminary Analysis and on Rankingof Formal MethodsA literature review on the main formal modelling and verification languages and tools used in industrial railway applications will be presented in this deliverable that is associated to Task 4.1. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-01-2017 |
Documents, reports | 2019-10-03 |
Modelling of the moving block signalling systemThe deliverable D2.1 will present the results of Task 2.1 and 2.2 which include the performance of system model and definition of the use cases for further safety analysis. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-01-2017 |
Documents, reports | 2019-10-03 |
Automatic Train Operations: implementation, operation characteristics and technologies for the Railway fieldThe deliverable D3.2 will provide the outcomes of the analysis of Task 3.2 and Task 3.3. The operation conditions of ATO will be analysed for the different grade of automation, while implementation characteristics that can be borrowed from the automotive sector will be specified. Furthermore, the deliverable will detail the evaluation analysis performed in Task 3.3 to identify which automatic driving technologies, not already exploited in the railway sector, are the most suited to be reused in the rail field. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-01-2017 |
Documents, reports | 2019-10-03 |
GNSS algorithms designThis deliverable will include the results of Task 1.6 that corresponds to the activity expected by item e of work stream 1. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-01-2017 |
Documents, reports | 2019-10-03 |
Moving Block signalling system Hazard AnalysisD2.2 will present the outcomes of Task 2.3 and 2.4 including results of Hazard identification and risk analysis and evaluation of Safety Level of Moving Block Signalling system. The report will contain the description of Safety Related Application Conditions for operational procedures and maintenance activities. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-01-2017 |
Documents, reports | 2019-10-03 |
State of the Art of Automated Driving technologiesThe deliverable D3.1 will present the survey on the automated driving technologies performed in Task 3.1. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-01-2017 |
Documents, reports | 2019-10-03 |
The ERTMS hazards associated with GNSS faultsDeliverable D1.3 will present the results achieved in tasks T1.4 and T1.5. Outcomes of these tasks is associated to items c and d of work stream 1. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-01-2017 |
Documents, reports | 2019-10-03 |
Aeronautical Standards ReviewThis deliverable will present the results of Task 1.1 and 1.2 and it will address the items a and b of work stream 1 described in the text of the Open call. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-01-2017 |
Documents, reports | 2019-10-03 |
Local GNSS EffectsDeliverable D1.2 will include the outcome of Task 1.3 that address item g of the work stream 1. This task and its deliverable have been anticipated with respect to what suggested in the text of the Open Call since this activity is preparatory to the tasks of WP1 as detailed in the description of Task T1.3. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-01-2017 |
Documents, reports | 2019-10-03 |
Set up public websiteThis is for the set up, and going live, of a public website for the project. This will be continuously updated with news and results throughout the life of the project. Task 5.1 will take care of this deliverable. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-01-2017 |
Websites, patent fillings, videos etc. | 2019-08-30 |
Set up a dissemination and exploitation plan for the projectA report defining the project dissemination, communication and exploitation strategies for the project will be prepared by Task 5.1 Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-01-2017 |
Documents, reports | 2019-08-30 |