The page lists 26 deliverables related to the research project "PLANET".
title and desprition | type | last update |
---|---|---|
PLANET P2H-enabled human-centric VES moduleThis deliverable includes the documentation and prototype of the building-level optimization module that can integrate the building assets into the PLANET system. It will facilitate market communications and transactions for BAS service procurement as well as coordinate intra-building equipment usage with optimal occupant comfort preservation and fair distribution of costs/returns. (T3.3) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
PLANET dissemination and communication plan and associated material (v.3)Updated report on the adopted dissemination and communication plan, including the training activities towards stakeholders. (T7.1) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
Methodology & scenarios for the validation of the PLANET system impact (v.1)This report will document the initial methodology and context for the validation of the PLANET system impact. It will specify the simulation scenarios/context and propose evaluation tools to provide answers to the research questions. (T5.1) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
Final PLANET P2H process/system modelThis deliverable includes both documentation and the actual prototypes of the high-level power-to-heat models that will be used in the PLANET system for optimization. They will be validated with measurements or a high-fidelity heat grid thermal-hydraulic simulator. (T2.5) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
Report on the current regulatory frameworks and proposal for a new integrated regulatory schemeThis report will review the current regulatory schemes. The goal is to point out their limits and propose a new “innovation based†regulatory scheme that would be applied to a holistic energy system comprising electricity, gas and heating. (T6.2) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
Final PLANET P2G process/system modelsThis deliverable includes both documentation and the actual prototypes of the high-level P2G models that will be used in the PLANET system for optimization. Several model prototypes will be developed to enlarge the optimization search space. (T2.4) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
PLANET system architecture definition (Final)The document will be report the second version of the architecture design and elaboration, based on the made refinements. (T1.4) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
PLANET Communication MiddlewareThis deliverable includes the prototype of the PLANET system communication middleware as well as its documentation. This middleware will support communications among all other PLANET system components and will comply to the PLANET common information model. (T4.2) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Demonstrators, pilots, prototypes | 2020-04-14 |
District-level storage/conversion management & coordination engine (SCCE)This deliverable includes the prototype and documentation of the SCCE engine. The latter will optimize storage and conversion deployment and operation in the electricity grid to facilitate RES integration. (T3.5) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
Interim PLANET P2H process/system modelsThis deliverable is a preliminary version of the document of D2.7 that has been introduced for effective progress monitoring of the project. (T2.5) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
Preliminary interfaces between electricity, gas, transportation and heating/ cooling networksThis report will documents the designed interfaces to facilitate the integration of all applicable systems/devices to the electricity, gas, transportation and heating/ cooling networks. Special emphasis will be given to monitoring and control of the systems/devices to satisfy grid requirements/qualifications for BAS service provision and converted power injection or virtual storage (T4.1) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
Interim PLANET P2G process/system modelsThis deliverable is a preliminary version of document of D2.5 that has been introduced for effective progress monitoring of the project. (T2.4) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
PLANET system architecture definition (Initial)This report will document the architectural synthesis process as well as the final detailed PLANET system architecture. It will provide a break down of the system functionality into individual system components and encapsulate issues such as: functional behaviour and communication interfaces, implementation technology and deployment options and security. (T1.4) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
Electricity and Gas demand/supply, Heat demand/supply forecasting models for future energy system scenarios (v.2)This report will document models for energy supply – including conventional generation and variable RES - and uncontrollable demand forecasting in the future energy system scenarios. They will also include projections of heat, gas demand and supply. (T3.1-T3.2) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
Report on the new market scenario: market functioning and innovative business modelsThis report will document new business models in the emerging landscape shaped by synergies between networks. It will also explore and investigate novel market mechanisms. (T6.1) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
PLANET Common Information ModelThis report will document in detail the common information model of the PLANET system. The model will ensure the semantic integrity of all system communications and will include aspects ranging from grid integration to human comfort modelling to encapsulate the range of project activities. (T3.4) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
Human-centric, context-aware VES demand flexibility profilesThis report will document electricity demand flexibility models of a building that incorporate the additional flexibility offered by Virtual Energy Storage devices/tools. The models will encapsulate human preferences for ambient comfort so that they can be directly used for control of the building amenities without significant impact of indoor comfort. (T2.3) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
Target context and requirements for conversion module deployment in the Smart GridThe purpose of this report is to project how the Smart Grid landscape will evolve in order to set the proper targets for the PLANET work. It will take into account the competition by alternative storage technologies and the evolution of conventional generation to provide a holistic picture on the future energy storage landscape, pinpoint the killer applications for small-scale P2G and P2HeatGrid units and identify the optimal storage technology to different application areas. (T2.2) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
PLANET dissemination and communication plan and associated material (v.1)Report on the adopted dissemination and communication plan, including the training activities towards stakeholders. The reports will be regularly updated. (T7.1) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
Report of energy system outlook and scenario definitionThe report includes the detailed analysis of the current harmonized market model for electricity for evaluating the adequacy of existing roles to deploy and operate the PLANET system. This document consists of generate holistic, comprehensive and educated projections on the future of the energy system. (T1.2) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
End-user requirements and specifications of the PLANET systemThe document provide the user requirements and the detailed specification for the PLANET system and the specification for the design of the system architecture. (T1.1) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
Requirements documentation for PLANET system communication & grid interfacesThis report will define the requirements for effective communication & grid interfaces throughout the various system architecture layers to ensure that all necessary information is properly collected and transmitted. Detailed information flow specifications for the complete system will be documented in order to drive the system architecture design, the definition of the PLANET Common Information Model, the project standardization activities and all software development/configuration efforts. (T1.3) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
PLANET branding, website and social media channelsReport on the adopted branding design and implementation of the website and adopted social media (T7.1) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Websites, patent fillings, videos etc. | 2020-04-14 |
Electricity and Gas demand/supply, Heat demand/supply forecasting models for future energy system scenarios (v.1)This report will document models for energy supply – including conventional generation and variable RES - and uncontrollable demand forecasting in the future energy system scenarios. They will include projections of electricity and gas demand and supply. (T3.1-T3.2) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
PLANET dissemination and communication plan and associated material (v.2)Updated reports on the adopted dissemination and communication plan, including the training activities towards stakeholders. (T7.1) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |
Data Management PlanThe DMP will outlines the PLANET practices for collecting, organizing, backing up, and storing the data the project will be generating. It will be regularly updated. The DPM will make publicly accessible the data beyond the life of the project. (T8.3) Programme: H2020-EU.3.3.4. - Topic(s): LCE-05-2017 |
Documents, reports | 2020-04-14 |