The page lists 12 deliverables related to the research project "openEO".
title and desprition | type | last update |
---|---|---|
Data Warehouse request 2019A list of earth observation data, which are planned to be used in 2019 for the pilot use cases, and can be delivered by the Copernicus Data Warehouse. Programme: H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): EO-2-2017 |
Documents, reports | 2020-03-06 |
Hackathon reportReport about the outcomes of the Hackathon Programme: H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): EO-2-2017 |
Documents, reports | 2020-03-06 |
Proof of Concept (Python)Implementation of a first basic version of the Python Client APIs to connect with the Core API of the openEO interface (WP 3) Programme: H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): EO-2-2017 |
Demonstrators, pilots, prototypes | 2020-03-06 |
Overview document about back offices metadata standards and interfacesInvestigation on the metadata standards and interfaces of the back offices, which are involved by this project Programme: H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): EO-2-2017 |
Documents, reports | 2020-03-06 |
Report assessing back-end driver variabilityAnalysis of metadata standards and interfaces of the back offices, which are involved by this project, their similarities and differences Programme: H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): EO-2-2017 |
Documents, reports | 2020-03-06 |
Two early prototype back-ends (file-based, SciDB)Based on Deliverable D4 the development of the various back office drivers will take place in a first iteration step in close coordination with WPs 3 and 5. Programme: H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): EO-2-2017 |
Demonstrators, pilots, prototypes | 2020-03-06 |
openEO core API prototype including Proof of ConceptImplementation, testing, deployment and documentation of a first prototype of the openEO core interface Programme: H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): EO-2-2017 |
Demonstrators, pilots, prototypes | 2020-03-06 |
Data Warehouse use 2018Description of the usage of data, requested in \'Data Warehouse request 2018\'. Programme: H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): EO-2-2017 |
Documents, reports | 2020-03-06 |
Preliminary User Requirements report (incl. Use Case Workshop report 1)A report of the Strategic & Use Workshop (Month 6) and about preliminary identified user requirements Programme: H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): EO-2-2017 |
Documents, reports | 2020-03-06 |
Operative online dissemination portals (website, social media, GitHub)A Project website will show the actual state of openEO and important progress. Via a maintained forum on social media platforms, we will be able to encourage potential future users of openEO to be involved in decision-making processes. Programme: H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): EO-2-2017 |
Websites, patent fillings, videos etc. | 2020-03-06 |
First overview of needed processes from use casesFirst overview of needed processes for implementing pilot use cases Programme: H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): EO-2-2017 |
Documents, reports | 2020-03-06 |
openEO architecture specification, first versionPreliminary architecture document about specifications for openEO architecture, following an established template (e.g. arc42). Programme: H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): EO-2-2017 |
Documents, reports | 2020-03-06 |