The page lists 9 deliverables related to the research project "LITMUS".
title and desprition | type | last update |
---|---|---|
Detailed plan for submission of biomarkers to the regulatory authorities (EMA and FDA) for qualificationAgreed project plan for LITMUS to secure an official description of the validation process from the agencies that studies engaging in biomarkers will need to follow and fulfil for biomarker qualification. Programme: H2020-EU.3.1.7. - Topic(s): IMI2-2016-09-05 |
Documents, reports | 2020-04-07 |
SOPs for collection, processing and storage of whole blood, EDTA plasma, SST serum, urine, stool, frozen liver biopsiesPre-analytical SOPs will be written covering, e.g. sample collection and analysis of the stability/quality of the metabolomics profile of serum/plasma samples. Programme: H2020-EU.3.1.7. - Topic(s): IMI2-2016-09-05 |
Documents, reports | 2020-04-07 |
Imaging manual to standardise image acquisition across all participating sitesLITMUS Imaging Manuals will be produced in parallel to the scanning protocol. One covering the MRI technical aspects and a second covering the ultrasound-based elastography technologies (using manufacturer protocols for VCTE, SSI, ARFI). These will be distributed to the participating sites to ensure standardised operating practices are followed across all participating sites. Programme: H2020-EU.3.1.7. - Topic(s): IMI2-2016-09-05 |
Documents, reports | 2020-04-07 |
Project HandbookQuick reference guide for all LITMUS project participants Programme: H2020-EU.3.1.7. - Topic(s): IMI2-2016-09-05 |
Documents, reports | 2020-04-07 |
Risk assessment procedureProcedure for assessing risks and monitoring mitigation actions Programme: H2020-EU.3.1.7. - Topic(s): IMI2-2016-09-05 |
Documents, reports | 2020-04-07 |
Report describing minimally acceptable performance criteria for diagnostic testingWe will use Web-based surveys (SurveyMonkey) with all LITMUS participants to identify minimally acceptable performance criteria, using a modified Delphi approach over at least two rounds of surveys. Programme: H2020-EU.3.1.7. - Topic(s): IMI2-2016-09-05 |
Documents, reports | 2020-04-07 |
Detailed dissemination planPlans will be drawn up to regularly highlight the project developments at relevant conferences, in peer-reviewed journals and at dedicated workshops organised by the consortium. All journal publications will be open access. The dissemination plans, which will be continuously reviewed and updated, will identify key project related publications, which will be earmarked for “gold†open access. Dissemination will also be assured through the establishment and maintenance of a project website from the start of the project, with links to the participating researchers, clinicians and institutions. Programme: H2020-EU.3.1.7. - Topic(s): IMI2-2016-09-05 |
Documents, reports | 2020-04-07 |
An optimised histological staging system for NAFLD-associated fibrosisDevelopment and validation of an optimised histological staging system for NAFLD-associated fibrosis with correlation to fibrosis severity measured by CPA. Programme: H2020-EU.3.1.7. - Topic(s): IMI2-2016-09-05 |
Documents, reports | 2020-04-07 |
LITMUS Data Management PlanThis initial version of the DMP will describe the organisational and technical details about data collection, storage, retention, destruction, privacy and confidentiality. The Plan will also include details of the procedures for the transfer of data and will be accompanied by confirmation of compliance with national and EU law on the protection of individuals with regard to the processing of personal data. Programme: H2020-EU.3.1.7. - Topic(s): IMI2-2016-09-05 |
Documents, reports | 2020-04-07 |