The page lists 15 deliverables related to the research project "ERSAT GGC".
title and desprition | type | last update |
---|---|---|
Safety Analysis of ERSAT ERTMS Application over GNSSThis deliverable provides the description of the System Functional Hazard Analysis carried out on the Enhanced Functional ERTMS Architecture described in D 2.1. Programme: H2020-EU.3.4.2.2.;H2020-EU.3.4.1.2.;H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): GALILEO-1-2017 |
Documents, reports | 2020-04-14 |
GNSS Quantitative Study for ERSAT GGC ProjectThis deliverable describes the GNSS Fault Models and the GNSS Failure Models analysed during the System Functional Hazard Analysis and the impacts of such GNSS faults in the Position Domain. Programme: H2020-EU.3.4.2.2.;H2020-EU.3.4.1.2.;H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): GALILEO-1-2017 |
Documents, reports | 2020-04-14 |
Enhanced Functional ERTMS Architecture Capable of using GNSS and Public Radio TLC TechnologiesThis document describes the functional architecture and the functional interfaces. Programme: H2020-EU.3.4.2.2.;H2020-EU.3.4.1.2.;H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): GALILEO-1-2017 |
Documents, reports | 2020-04-14 |
Functional and Not Functional Test SpecificationThis document describes the specification of the functional and not functional tests required for carrying out the end-to-end validation of systems compliant with D 2.1. Programme: H2020-EU.3.4.2.2.;H2020-EU.3.4.1.2.;H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): GALILEO-1-2017 |
Documents, reports | 2020-04-14 |
Dissemination and Exploitation ReportThe document will report the events where project members were contributing and will summarise the conclusion coming from the various events organised by the project (conferences, workshops, meetings with ERSAT-GGC Exploitation group members, etc.). Programme: H2020-EU.3.4.2.2.;H2020-EU.3.4.1.2.;H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): GALILEO-1-2017 |
Documents, reports | 2020-04-09 |
Project Leaflet– UpdatedThe design and production of the project leaflets distributed during the events with the relevant stakeholders. Programme: H2020-EU.3.4.2.2.;H2020-EU.3.4.1.2.;H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): GALILEO-1-2017 |
Websites, patent fillings, videos etc. | 2020-04-09 |
Assessment report of the survey processThis deliverable represents the Independent Safety Assessment Report associated with the Standard Process and Methodology defined in D 4.1. This ISA Report will be carry out in accordance with the applicable European directives. Programme: H2020-EU.3.4.2.2.;H2020-EU.3.4.1.2.;H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): GALILEO-1-2017 |
Documents, reports | 2020-04-09 |
Field Data Analysis ReportThis deliverable describes the results of the analysis on the recorded field data and reports the obtained classification on the surveyed track areas. Programme: H2020-EU.3.4.2.2.;H2020-EU.3.4.1.2.;H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): GALILEO-1-2017 |
Documents, reports | 2020-04-09 |
Process Execution ReportThis deliverable reports the results of the application of the Standard Process and Methodology described in D 4.1 by using the toolset described and implemented respectively in D 4.2 and D 4.3. Programme: H2020-EU.3.4.2.2.;H2020-EU.3.4.1.2.;H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): GALILEO-1-2017 |
Documents, reports | 2020-04-09 |
Assessment report of the enhanced functional ERTMS architectureThis deliverable represents the Independent Safety Assessment Report associated with the Enhanced Functional ERTMS Architecture defined in D 2.1. This ISA Report will be carry out in accordance with the applicable European directives. Programme: H2020-EU.3.4.2.2.;H2020-EU.3.4.1.2.;H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): GALILEO-1-2017 |
Documents, reports | 2020-04-09 |
Track Survey Execution ReportThis deliverable describes the demonstration activities and the related results carried out for demonstrating the applicability of the Standard Process and related Methodology and Toolset. In addition, the deliverable will also outline the recommended operational requirements and the guidelines for their use. Programme: H2020-EU.3.4.2.2.;H2020-EU.3.4.1.2.;H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): GALILEO-1-2017 |
Documents, reports | 2020-04-09 |
Project WebsiteThis is for the set up, and going live, of a public website for the project. This will be updated throughout the life of the project. Programme: H2020-EU.3.4.2.2.;H2020-EU.3.4.1.2.;H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): GALILEO-1-2017 |
Websites, patent fillings, videos etc. | 2020-03-06 |
Data Management PlanA Plan that describes how data produced in the time frame of the project must be handled during and after the project. Programme: H2020-EU.3.4.2.2.;H2020-EU.3.4.1.2.;H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): GALILEO-1-2017 |
Open Research Data Pilot | 2020-03-06 |
Quality planQuality plan includes guidelines, Gantt, document and presentation template Programme: H2020-EU.3.4.2.2.;H2020-EU.3.4.1.2.;H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): GALILEO-1-2017 |
Documents, reports | 2020-03-06 |
Project LeafletThe design and production of the project leaflets distributed during the events with the relevant stakeholders. Programme: H2020-EU.3.4.2.2.;H2020-EU.3.4.1.2.;H2020-EU.2.1.6.3.;H2020-EU.2.1.6.1.2. - Topic(s): GALILEO-1-2017 |
Websites, patent fillings, videos etc. | 2020-03-06 |