Opendata, web and dolomites

3D-MUSE SIGNED

3D Multi-Process Sequential Integration for Smart Sensor Interfaces

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "3D-MUSE" data sheet

The following table provides information about the project.

Coordinator
UNIVERSITETET I OSLO 

Organization address
address: PROBLEMVEIEN 5-7
city: OSLO
postcode: 313
website: www.uio.no

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Norway [NO]
 Total cost 3˙846˙157 €
 EC max contribution 3˙846˙157 € (100%)
 Programme 1. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT))
 Code Call H2020-ICT-2017-1
 Funding Scheme RIA
 Starting year 2018
 Duration (year-month-day) from 2018-01-01   to  2021-12-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    UNIVERSITETET I OSLO NO (OSLO) coordinator 590˙891.00
2    COMMISSARIAT A L ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES FR (PARIS 15) participant 1˙607˙728.00
3    INTEGRATED DETECTOR ELECTRONICS AS NO (OSLO) participant 753˙125.00
4    LUNDS UNIVERSITET SE (LUND) participant 393˙527.00
5    STMICROELECTRONICS CROLLES 2 SAS FR (CROLLES) participant 350˙885.00
6    INSTITUT POLYTECHNIQUE DE GRENOBLE FR (GRENOBLE CEDEX 1) participant 150˙000.00

Map

 Project objective

The IoT is composed of connected devices that are characterized by their interaction with the environment via a plethora of sensors and actuators. The trend goes to ever more complex interactions and thus an increase in the number of different sensors integrated in the same product, which in turn requires the processing capability to handle all of those sensors. At the same time those systems are expected to still perform on an ever lower power budget, preferably so low as to be able to operate purely on power scavenging. And of course the cost needs to be moderate too. The electronics at the heart of such a system needs to be mixed-signal electronics that interfaces to the analog sensors and actuators, but can also provide the necessary digital processing power.

3D-MUSE wants to spearhead the progression from what we shall refer to as 'systems-in-stack' to true 'systems-in-cube' that monolithic/sequential 3D integration will enable. We define the former as a 3D system that is characterized by locating functional blocks within a single plain in the (typically parallel/wafer-bonding) 3D integration stack, while the latter makes use of the full emancipation of the interconnect density in the third dimension of sequential 3D integration and rather implements functional blocks in a volume comprising multiple tiers. We shall demonstrate this concept by conceiving novel architectures for micro circuits in a volume in a two tier 3D sequential integration process. In particular, we have identified mixed-signal circuits as, on one hand, a major bottleneck for functional performance scaling of sensor nodes and smart sensors in the IoT and cyberphysical systems, and on the other hand, excellent candidates for beneficial trade-offs when implemented as circuits in a volume with using two specialize tiers, one for analog device options and another for optimal digital designs. We shall refer to such a technology as 'multi-process' sequential 3D integration.

 Deliverables

List of deliverables.
Specification for the analog MOSFET Documents, reports 2020-01-30 10:20:29
Periodic Project report 1 Documents, reports 2020-01-30 10:20:29
Project Web-Page Websites, patent fillings, videos etc. 2020-01-30 10:20:29
Data management plan (DMP) Open Research Data Pilot 2020-01-30 10:20:29

Take a look to the deliverables list in detail:  detailed list of 3D-MUSE deliverables.

 Publications

year authors and title journal last update
List of publications.
2018 Laurent Brunet, Perrine Batude, Claire Fenouillet-Beranger, Maud Vinet
(Invited) 3D Monolithic Integration
published pages: 125-130, ISSN: 1938-5862, DOI: 10.1149/08508.0125ecst
ECS Transactions 85/8 2020-01-30

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "3D-MUSE" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "3D-MUSE" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.2.1.1.)

ACCORDION (2020)

Adaptive edge/cloud compute and network continuum over a heterogeneous sparse edge infrastructure to support nextgen applications

Read More  

XEUROPE (2020)

X-Europe

Read More  

CloudButton (2019)

Serverless Data Analytics Platform

Read More