The page lists 6 deliverables related to the research project "CEVOLVER".
title and desprition | type | last update |
---|---|---|
Report on brand-independent (or general) system level and controls requirementsRequirements for vehicle system architecture (electrical architecture, electrical consumers, etc.) and related control features based on outputs of parallel tasks 1.1 and 1.2, definition of VCU-to-cloud interfaces considering the leverage by 5G standards. Programme: H2020-EU.3.4. - Topic(s): LC-GV-01-2018 |
Documents, reports | 2020-04-09 |
Report on use cases and methodology for developing user centric connected EVs optimised for lifetime, value, efficiency, and reachEvaluation and characterization of use cases derived from cloud data provided by partners and recommendations how to exploit this information in the development process. Programme: H2020-EU.3.4. - Topic(s): LC-GV-01-2018 |
Documents, reports | 2020-02-12 |
Report on connectivity interface for simulation supported testingMinimum requirements for the connectivity of the simulation-supported testing environment (both driver functions and OEM gateways) to the cloud-based emulated infrastructure, including the definition and origin of data sources, data format, transfer rates, etc. Programme: H2020-EU.3.4. - Topic(s): LC-GV-01-2018 |
Documents, reports | 2019-10-08 |
Short description of the setup of the dissemination tools (website, flyer, branding)The launch of a public project website, accessible for the general public. A very short report will be uploaded with some key elements of the website and the dissemination tools Programme: H2020-EU.3.4. - Topic(s): LC-GV-01-2018 |
Documents, reports | 2019-10-08 |
Report on specification of brand-independent E/E interfaces, communication protocols, interactions of VCU and cloudReport will detail and document all of the agreements achieved in WP1 regarding the specification of interfaces, protocol and planned interactions with the cloud. All communication data will be limited to an agreed-upon brand-independent subset, as some data is security critical or IP blocked. Programme: H2020-EU.3.4. - Topic(s): LC-GV-01-2018 |
Documents, reports | 2019-10-08 |
Dissemination plan\"A report describing het initial disseminaiton plan, including a list of expected dissemination actions for the whole project duration and shortly after. This list will be a \"\"living\"\" document throughout the project. Programme: H2020-EU.3.4. - Topic(s): LC-GV-01-2018 |
Documents, reports | 2019-10-08 |