MIDAS project deliverables
The page lists 4 deliverables related to the research project "MIDAS".
List of Deliverables
MIDAS: list of downloadable deliverables.
title and desprition
| type |
last update |
Communication, Dissemination and exploitation plan
This deliverable will address the following contents
Communication:
• Identify social and professional network for promoting the action and demonstrating the EU funding effectiveness
• Update Partner’s websites with MIDAS relevant aspects and results
Dissemination:
• Dissemination of knowledge during and after the project
• Identification of the groups (academic/industrial/end user/certification bodies) that will be targeted for dissemination
• Identification of the objectives to be disseminated
• List of possible events to attend (conference, airshow, exhibition, …)
Exploitation:
• Identification of responsibilities and benefits deriving from a possible exploitation (ref. doc IP)
• Identification of stakeholders interested in the possible exploitation of MIDAS output
• Identification of the actions to achieve the exploitation
• Identification of all the possible derived technologies of MIDAS project for parallel projects (at Consortium and single Partner level)
Programme: H2020-EU.3.4.5.6. - Topic(s): JTI-CS2-2017-CfP07-SYS-03-14
download deliverable
|
Documents, reports |
2020-02-12 |
Preliminary Design Review
Preliminary Design Review
DRL list of Project Management Plan for PDR
• Hardware Design Description (HDD): description of hardware architecture, components, performance
• Software Design Description (SDD): description of software/firmware architecture, components, performance
• Software Test Plan (STP): description of methods for SW validation. Detailed test will be described in the Software Test Description (STD)
• Interface Control Documents (ICD): interfaces of the MIDAS unit (mechanical, electrical connectors, communication protocols)
• Projects analysis, preliminary drawings and design justification files
• Requirement Traceability Matrix
• Validation Test Plan (VTP): description of functional test to be executed on the HW, SW/FW and the complete system (planning)
• Qualification Test Plan (QTP): description of environmental test (planning)
• Test Requirement Document (TRD): description and requirements of the tools and test benches necessary for the testing and validation process; procedure for testing.
• HW/SW configuration management plan
Programme: H2020-EU.3.4.5.6. - Topic(s): JTI-CS2-2017-CfP07-SYS-03-14
download deliverable
|
Documents, reports |
2020-02-12 |
Data Management Plan
Data Management Plan
This deliverable describes the data management life cycle for the data to be collected, processed and/or generated by the MIDAS project. It includes information on:
• the handling of research data during and after the end of the project
• what data will be collected, processed and/or generated
• which methodology and standards will be applied
• whether data will be shared/made open access and
• how data will be curated and preserved (including after the end of the project).
The Horizon 2020 FAIR DMP template will be used.
Programme: H2020-EU.3.4.5.6. - Topic(s): JTI-CS2-2017-CfP07-SYS-03-14
download deliverable
|
Open Research Data Pilot |
2020-02-12 |
System Requirement Review
System Requirement Review (SSR)
DRL list of Project Management Plan for SRR
• System Requirement Specification (SRS): HW requirement, SW Requirements, Environmental Qualification Requirement, Quality Requirements, Performance Requirements
• Interface Requirement Specification (IRS): mechanical installation requirements, electrical installation requirements, communication interface requirements
• Project Quality Plan (PQP) : definitions of role and responsibilities, design and implementation workflows, Key-Performance-Indicators (KPI) identification, standards and regulatory references; subpart-1: HW development plan, FW development plan
• Project Master Plan (PMP)
• Project Risk Analysis
• SRR report
Programme: H2020-EU.3.4.5.6. - Topic(s): JTI-CS2-2017-CfP07-SYS-03-14
download deliverable
|
Documents, reports |
2019-06-06 |