The page lists 7 deliverables related to the research project "PROTECT".
title and desprition | type | last update |
---|---|---|
Requirements, constraints and system designOutput of WP2, summarising the outcome of the coordinated action among the Advisory Board and other end-users Organisations involved after the project start, preparing questionnaires, also engaging the end-users via the Serious Games paradigm and tools developed in WP6, so to have a comprehensive set of usability and suitability requirements and constraints, along with a preliminary architectural design to be fed into WP3 and WP5. Programme: H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1. - Topic(s): EIC-SMEInst-2018-2020 |
Documents, reports | 2020-01-27 |
Guidelines for the requirements, constraints and system designProvide a preliminary architectural design of the market-ready system, to be fed into WP3 as key input for the development and in WP5 for the market trade-off analysis, so to devise the necessary trade-off between the CAPEX (increasing with the number of fulfilled requirements) and the increase of projected revenues. Programme: H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1. - Topic(s): EIC-SMEInst-2018-2020 |
Documents, reports | 2020-01-27 |
Valuation of the user experience and plans for the demonstrationsIntermediate output of WP4: it will report the User\'s experience and (also in connection with the Advisory Board) will provide a detailed plan for the intermediate and final on-field demonstrations carried out by the practitioners with the PROTECT systems under development in WP3. Programme: H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1. - Topic(s): EIC-SMEInst-2018-2020 |
Documents, reports | 2020-01-27 |
Project HandbookDescribe the management procedures, define the Technical, Financial and Project management roles, along with assessment and communication guides. Programme: H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1. - Topic(s): EIC-SMEInst-2018-2020 |
Documents, reports | 2020-01-27 |
Agenda of the demonstrationsIn close cooperation with the Advisory Board and the end-users that already expressed their interest in PROTECT, an agenda will be established at M6, specifying the end-user hosting the demonstration, logistic, schedule, place and nature of the demonstrations. This agenda will be constantly updated as a function of the progresses of WP3 in providing new system Layers to be tested. Programme: H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1. - Topic(s): EIC-SMEInst-2018-2020 |
Documents, reports | 2020-01-27 |
Communication planIt will indicate the preliminary communication strategy, channels to be employed, expected impact, schedule of the planned events involving PROTECT (e.g. fairs, workshops), targeted stakeholders and mockups of the Serious Games to be developed Programme: H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1. - Topic(s): EIC-SMEInst-2018-2020 |
Documents, reports | 2020-01-27 |
WEB media kitsThe selected graphic design studio will produce the graphic line: all the elements of the “web kits†(in Task 6.3) and “project kits†(e.g. bag with illustrative materials, usb-stick, agendas, t-shirt) will be in-line with the project graphic line and will be used during events (fairs, workshops) attended by DUNE and at the “PROTECT-day†workshop planned at the end of the project. Programme: H2020-EU.3.;H2020-EU.2.3.;H2020-EU.2.1. - Topic(s): EIC-SMEInst-2018-2020 |
Websites, patent fillings, videos etc. | 2020-01-27 |