Opendata, web and dolomites

NECESSITY project deliverables

The page lists 8 deliverables related to the research project "NECESSITY".

 List of Deliverables

NECESSITY: list of downloadable deliverables.
title and desprition type last update

First workshop on clinical protocol development sharing opinions of patients, experts and health authorities

Advance identification of and signed contracts for external participants; Admin logistics (location, contracts, timing). Creation of materials from draft clinical outputs (from WP1-WP7). Plan information to be included in briefing package to be shared with HAs, patient groups & payers. Plan timing for HA/payer/patient group consultation and feedback.

Programme: H2020-EU.3.1.7. - Topic(s): IMI2-2017-12-03

download deliverable 

Websites, patent fillings, videos etc. 2020-03-24

EAB first report on ethical issues

The EAB will be held at month 12 of the project and minutes prepared.

Programme: H2020-EU.3.1.7. - Topic(s): IMI2-2017-12-03

download deliverable 

Documents, reports 2020-03-24

Initial Exploitation plan

A preliminary exploitation plan will be created
when the project begins and updated yearly. The plan will summarize the strategy and the concrete actions put in place by the NECESSITY Consortium for the optimal protection and exploitation of the results generated by the project

Programme: H2020-EU.3.1.7. - Topic(s): IMI2-2017-12-03

download deliverable 

Documents, reports 2020-03-11

Initial Dissemination and Communication plan.

A preliminary dissemination and communication plan will be created
when the project begins and updated yearly. The plan will summarize the strategy and the concrete actions put in
place by the NECESSITY Consortium for the optimal dissemination and communication of the results
generated by the project

Programme: H2020-EU.3.1.7. - Topic(s): IMI2-2017-12-03

download deliverable 

Documents, reports 2020-03-11

Communication Policy

A communication Policy will be put in place to ensure that: i) all innovation related activities are captured, assessed, and the IP protected and ii) all NECESSITY Partners will comply with the rules of IMI2 JU Grant Agreement and the IMI2 JU Communication Guide regarding the dissemination activities and the protection of foreground generated within the project

Programme: H2020-EU.3.1.7. - Topic(s): IMI2-2017-12-03

download deliverable 

Documents, reports 2020-03-11

First version of the protocol of the NECESSITY trial finalized

A first version of the complete NECESSITY trial protocol meeting requirements for submission to health authorities

Programme: H2020-EU.3.1.7. - Topic(s): IMI2-2017-12-03

download deliverable 

Documents, reports 2020-03-11

EAB cooperation report that will summarize the Experts profiles and their roles.

An Ethical Advisory board (EAB) will be defined and formalized in a EAB collaboration report. It will include the list of members, their role and frequency of the meetings.

Programme: H2020-EU.3.1.7. - Topic(s): IMI2-2017-12-03

download deliverable 

Documents, reports 2020-03-11

NECESSITY website

The NECESSITY website will be accessible on the internet at month 6 and it will be revised and improved
during the whole course of the action. Part of the website will be password-protected and dedicated to internal communication.

Programme: H2020-EU.3.1.7. - Topic(s): IMI2-2017-12-03

download deliverable 

Demonstrators, pilots, prototypes 2020-03-11