Opendata, web and dolomites

3D SIGNED

DMX Demonstration in Dunkirk

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

 3D project word cloud

Explore the words cloud of the 3D project. It provides you a very rough idea of what is the project "3D" about.

edge    relies    cmi    skills    hr    holistic    conditioning    efficient    engineering    complementary    acp    unprecedent    providers    region    societal    pilot    cluster    11    skilled    uetikon    capability    recovery    solvent    8m    gassco    countries    co2    dunkirk    requested    oil    industries    ssh    budget    quality    economies    brevik    dealt    dmxtm    food    north    full    creation    ifpen    mill    steel    tco2    rtd    amal    combined    grade    lca    mtco2    axens    fr    beginning    ccs    complete    dtu    dmxb    industrially    demonstrating    mt    embryo    hubs    trl    transversal    deploying    14    job    mainly    gas    transport    downstream    compatible    chain    territory    storage    give    transformation    sea    3d    kpi    expectations    heat    waste    rwth    environmentally    capture    companies    aside    2025    2035    transition    aquifers    76    recovered    reaching    plant    energy    markets    stakeholder    environmental    total    depletion    intensive    building    notably    industrial    smoothing    academics   

Project "3D" data sheet

The following table provides information about the project.

Coordinator
IFP Energies nouvelles 

Organization address
address: AVENUE DE BOIS PREAU 1 & 4
city: RUEIL MALMAISON
postcode: 92500
website: www.ifpenergiesnouvelles.com

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country France [FR]
 Total cost 19˙239˙368 €
 EC max contribution 14˙739˙369 € (77%)
 Programme 1. H2020-EU.3.3.2. (Low-cost, low-carbon energy supply)
 Code Call H2020-LC-SC3-2018-NZE-CC
 Funding Scheme RIA
 Starting year 2019
 Duration (year-month-day) from 2019-05-01   to  2023-04-30

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    IFP Energies nouvelles FR (RUEIL MALMAISON) coordinator 497˙135.00
2    AXENS SA FR (RUEIL MALMAISON) participant 7˙026˙137.00
3    ARCELORMITTAL ATLANTIQUE ET LORRAINE SAS FR (SAINT DENIS) participant 4˙765˙320.00
4    COCKERILL MAINTENANCE & INGENIERIE BE (SERAING) participant 484˙687.00
5    ACP POLSKA PL (WLOCLAWEK) participant 422˙275.00
6    TOTAL RAFFINAGE CHIMIE FR (COURBEVOIE) participant 387˙292.00
7    DANMARKS TEKNISKE UNIVERSITET DK (KGS LYNGBY) participant 349˙695.00
8    BREVIK ENGINEERING AS NO (BREVIK) participant 300˙416.00
9    RHEINISCH-WESTFAELISCHE TECHNISCHE HOCHSCHULE AACHEN DE (AACHEN) participant 249˙871.00
10    CU CHEMIE UETIKON GMBH DE (LAHR) participant 131˙250.00
11    GASSCO AS NO (KOPERVIK) participant 125˙290.00

Map

 Project objective

3D project aims mainly at demonstrating DMXTM CO2 Capture technology in AMAL’s Dunkirk (FR) steel mill on an industrial pilot plant (0.5 tCO2/hr.), bringing TRL from 4 to 7, with 76% of requested EU budget (14,8M€). DMXTM will give Europe an edge in cost, environmental- and energy-efficient recovery of CO2. Downstream requirements are fully considered in studies of conditioning, transport and storage in North Sea aquifers. Waste Heat Recovery well combined with DMXTM process will allow reaching unprecedent CO2 Capture cost under 40 €/tCO2. Environmental, societal and stakeholder’s expectations are dealt from the beginning and all-along the project to ensure capability of deploying the CCS cluster on Dunkirk territory. DMXB solvent production will be optimised industrially and environmentally, through LCA. 3D project is based on an EU holistic approach, building on previous an on-going CCS projects where many 3D partners are involved. 2025 full-scale CCS plant of 1.5 Mt CO2/y will be implemented from end of 3D project which will be an embryo of the future CCS cluster Dunkirk-North Sea 2035 (10 MtCO2/y). It is a major step in the transformation of energy- and CO2-intensive industries such as steel towards EU targets, with opportunities of job creation all along the CO2 CCS chain, notably for Dunkirk region economies and EU storage Hubs. 3D RTD and engineering providers would develop new markets aside from existing Oil & Gas, smoothing environmental and energy-depletion transition. Furthermore, quality of recovered CO2 through DMXTM process is compatible with food-grade markets. The project success relies on of a highly skilled and experienced consortium involving the complete chain of CCS and key transversal skills (LCA, SSH, KPI/TRL/cost assessment). 11 complementary partners from 6 European countries, of 2 academics (RWTH, DTU), 4 technology providers (ACP, GASSCO, IFPEN, UETIKON), 3 engineering companies (AXENS, CMI, BREVIK), 2 end-users (AMAL, TOTAL).

 Publications

year authors and title journal last update
List of publications.
2019 Paul Broutin (IFPEN), Bernard Petetin (ArcelorMittal), Xavier Courtial (Axens), Maxime Lacroix (TOTAL)
3D: A H2020 Project for the Demonstration of the DMXTM Process
published pages: , ISSN: , DOI:
PCCC-5 18 September 2019 2019-11-22
2019 Maxime Lacroix (TOTAL), Paul Broutin (IFPEN), Samuel Lethier (TOTAL), David Nevicato (TOTAL), Bernard Petetin (ArcelorMittal), Eric De Coninck (ArcelorMittal), Xavier Courtial (Axens)
DMX Demonstration in Dunkirk: 3D Project granted by H2020 Scope and Objectives
published pages: , ISSN: , DOI:
TCCS-10 18 June 2019 2019-11-22

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "3D" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "3D" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.3.2.)

Hybrid-BioVGE (2019)

Hybrid Variable Geometry Ejector Cooling and Heating System for Buildings Driven by Solar and Biomass Heat

Read More  

CO2Fokus (2019)

CO2 utilisation focused on market relevant dimethyl ether production, via 3D printed reactor- and solid oxide cell based technologies

Read More  

ELEMENT (2019)

Effective Lifetime Extension in the Marine Environment for Tidal Energy

Read More