R2CA SIGNED

REDUCTION OF RADIOLOGICAL CONSEQUENCES OF DESIGN BASIS AND DESIGN EXTENDION ACCIDENTS

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "R2CA" data sheet

The following table provides information about the project.

Coordinator
INSTITUT DE RADIOPROTECTION ET DE SURETE NUCLEAIRE 

Organization address
address: AV DE LA DIVISION LECLERC 31
city: FONTENAY AUX ROSES
postcode: 92260
website: http://www.irsn.org

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country France [FR]
 Total cost 4˙156˙896 €
 EC max contribution 3˙184˙940 € (77%)
 Programme 1. H2020-Euratom-1.1. (Support safe operation of nuclear systems)
 Code Call NFRP-2018
 Funding Scheme RIA
 Starting year 2019
 Duration (year-month-day) from 2019-09-01   to  2023-08-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    INSTITUT DE RADIOPROTECTION ET DE SURETE NUCLEAIRE FR (FONTENAY AUX ROSES) coordinator 701˙436.00
2    HELMHOLTZ-ZENTRUM DRESDEN-ROSSENDORF EV DE (DRESDEN) participant 237˙500.00
3    Teknologian tutkimuskeskus VTT Oy FI (Espoo) participant 219˙877.00
4    AGENZIA NAZIONALE PER LE NUOVE TECNOLOGIE, L'ENERGIA E LO SVILUPPO ECONOMICO SOSTENIBILE IT (ROMA) participant 215˙177.00
5    UNIVERSITAET FUER BODENKULTUR WIEN AT (WIEN) participant 212˙847.00
6    CENTRO DE INVESTIGACIONES ENERGETICAS, MEDIOAMBIENTALES Y TECNOLOGICAS-CIEMAT ES (MADRID) participant 194˙000.00
7    JRC -JOINT RESEARCH CENTRE- EUROPEAN COMMISSION BE (BRUSSELS) participant 177˙416.00
8    LIMITED LIABILITY COMPANY ANALYTICAL RESEARCH BUREAU FOR NPP SAFETY UA (KYIV) participant 177˙304.00
9    NINE NUCLEAR AND INDUSTRIAL ENGINEERING SRL IT (LUCCA) participant 170˙625.00
10    TRACTEBEL ENGINEERING BE (BRUXELLES) participant 149˙700.00
11    ENERGIATUDOMANYI KUTATOKOZPONT HU (Budapest) participant 138˙750.00
12    ELECTRICITE DE FRANCE FR (PARIS 08) participant 135˙921.00
13    POLITECNICO DI MILANO IT (MILANO) participant 118˙396.00
14    BEL V BE (BRUXELLES) participant 95˙625.00
15    UJV REZ, a. s. CZ (HUSINEC) participant 92˙300.00
16    STATE ENTERPRISE STATE SCIENTIFIC AND TECHNICAL CENTER FOR NUCLEAR AND RADIATION SAFETY UA (KYIV) participant 84˙687.00
17    LIETUVOS ENERGETIKOS INSTITUTAS LT (KAUNAS) participant 63˙375.00

Map

 Project objective

The Reduction of Radiological Consequences of design basis and extension Accidents (R2CA) project targets the development of harmonized methodologies and innovative management approach and safety devices for the evaluation and for the reduction of the consequences of DBA and DEC-A accidents in operating and foreseen nuclear power plants in Europe. For both purposes development of methodologies will be conducted with the goal of reassessing the safety margins using less conservative approaches and considering the new risks that rose from the original design or design extension phases. This will reinforce the confidence on these safety margins for conditions up to the extended design domain, will allow the identification of new accident management measures and devices and will support the optimization of the potential associated emergency population protection measures. Improvement of evaluations tools will be supported by the reassessment of the existing experimental and analytical databases. The efficiency of the approach will be demonstrated by comparing at start and then at the end of the project the results of the evaluation of a series of reactor cases selected by a senior expert group among two main categories: loss of coolant accidents and steam generator tube rupture accidents. Detailed analyzes of these reactor cases simulations will suggest the development of harmonized evaluation methodologies. The project will include also innovative actions to estimate the pros and cons of potential new accident management measures and devices, to explore the potential switch of prognosis evaluation tools to the diagnosis of on-going fuel cladding failure and to explore the potentiality for these accidental situations of advanced technological fuels.

 Deliverables

List of deliverables.
Quality Management report Documents, reports 2020-04-17 18:49:22
Minutes of the kick-off meeting Documents, reports 2020-04-17 18:49:22
Minutes of the Senior Expert Group meeting Documents, reports 2020-04-17 18:49:22

Take a look to the deliverables list in detail:  detailed list of R2CA deliverables.

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "R2CA" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "R2CA" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-Euratom-1.1.)

MUSA (2019)

MANAGEMENT AND UNCERTAINTIES OF SEVERE ACCIDENTS

Read More  

SHARE (2019)

StakeHolder-based Analysis of REsearch for Decommissioning.

Read More  

R2CA (2019)

REDUCTION OF RADIOLOGICAL CONSEQUENCES OF DESIGN BASIS AND DESIGN EXTENDION ACCIDENTS

Read More