The page lists 8 deliverables related to the research project "COREWIND".
title and desprition | type | last update |
---|---|---|
Review of the state of the art of mooring and anchoring designs, technical challenges and identification of relevant DLCsDefinition of the benchmark versus which developments in WP2 will be performed and will thus summarize current mooring and anchoring state of the art for floating wind projects currently installed or being engineered. Document will then identify the critical design parameters, constraints and key performance indicators. Finally design load cases for station keeping system will be specifically addressed in this document to complement WP1 output. Programme: H2020-EU.3.3.2. - Topic(s): LC-SC3-RES-11-2018 |
Documents, reports | 2020-04-07 |
Creation of the project corporate identityExplanation of the corporate identity of the Project. It will include a project logo (full colour, grayscale and black and white versions), a project slogan, social media design, newsletter design and templates for official communications, including MS PowerPoint presentations, MS Word documents and the project deliverables. Programme: H2020-EU.3.3.2. - Topic(s): LC-SC3-RES-11-2018 |
Documents, reports | 2020-04-02 |
Design load basisLocation, depth, met-ocean conditons, soil information, design load cases for the two 15MW floater-turbine concepts. Programme: H2020-EU.3.3.2. - Topic(s): LC-SC3-RES-11-2018 |
Documents, reports | 2020-04-02 |
Website launched and set-up of social media profilesProject website and social media profiles ready. Programme: H2020-EU.3.3.2. - Topic(s): LC-SC3-RES-11-2018 |
Websites, patent fillings, videos etc. | 2020-03-24 |
Review of the state of the art of dynamic cable system designsReport defining state of the art in relation to dynamic cables for floating wind projects currently employed. Opportunities for technology exploitation for future development towards next level commercialization will also be identified. Programme: H2020-EU.3.3.2. - Topic(s): LC-SC3-RES-11-2018 |
Documents, reports | 2020-03-24 |
Initial FlyersA one-page flyer will be created presenting the basic information of the project asobjectives, duration, partners involved and website page to be distributed by all the project partners in meetings, events and workshops. Programme: H2020-EU.3.3.2. - Topic(s): LC-SC3-RES-11-2018 |
Websites, patent fillings, videos etc. | 2020-03-24 |
Definition of the 15MW Reference Wind TurbineDescription and HAWC2 model of the 15MW reference wind turbine Programme: H2020-EU.3.3.2. - Topic(s): LC-SC3-RES-11-2018 |
Documents, reports | 2020-03-11 |
Report of initial kick-off meetingInformation about the Kick-off Meeting will be delivered. It will include intial tasks, discussions and actions decided to be taken into account. Programme: H2020-EU.3.3.2. - Topic(s): LC-SC3-RES-11-2018 |
Documents, reports | 2020-03-11 |