# | ||||
---|---|---|---|---|
1 | DREAM Design and Realization of equipped engine compartments including cowling for a fast compound rotorcraft | 2017 | 1˙454˙805.00 | 1˙249˙600.00 |
2 | LATTE Full Fairing for Main Rotor Head of the LifeRCraft demonstrator | 2017 | 464˙437.00 | 399˙543.00 |
3 | TRAIL Design, manufacture and deliver a high performance, low cost, low weight Nacelle Structure for Next Generation Tilt-Rotor (NGCTR) | 2019 | 6˙049˙853.00 | 5˙199˙438.00 |
The Institution SIEC BADAWCZA LUKASIEWICZ-INSTYTUTLOTNICTWA has been involved also in the following Horizon 2020 projects.