Opendata, web and dolomites

Programme h2020-eu.3.4.5.3. [45 projects]

This page shows the list of projects involved in the programme "IADP Fast Rotorcraft (H2020-EU.3.4.5.3.)" of the Horizon 2020 Framework Research Programme.

Following table lists the European H2020 projects involved in the "H2020-EU.3.4.5.3." programme. Projects are ordered by starting date.

Click on table headers to rearrange data.

# acronym  start  total cost  EC contribution  code call 
1 CA3TCH 2015 799˙000 799˙000 H2020-CS2-CFP01-2014-01
2 PROPTER 2015 409˙252 409˙252 H2020-CS2-CFP01-2014-01
3 POCOL 2015 1˙229˙831 499˙000 H2020-CS2-CFP01-2014-01
4 HElAIrcOPT 2016 529˙806 370˙860 H2020-CS2-CFP01-2014-01
5 VOLT 2016 3˙929˙375 800˙000 H2020-CS2-CFP01-2014-01
6 FURADO 2016 399˙000 399˙000 H2020-CS2-CFP01-2014-01
7 ISG 2016 1˙361˙702 953˙191 H2020-CS2-CFP01-2014-01
8 HVEMB 2016 1˙476˙620 690˙000 H2020-CS2-CFP01-2014-01
9 ACTIonRCraft 2016 1˙250˙163 800˙000 H2020-CS2-CFP02-2015-01
10 9eGEN 2016 1˙670˙550 1˙169˙385 H2020-CS2-CFP02-2015-01
11 MUTR 2016 606˙400 606˙400 H2020-CS2-CFP02-2015-01
12 AMATHO 2016 3˙321˙160 1˙749˙999 H2020-CS2-CFP02-2015-01
13 NGCTR DIGIFuel 2016 1˙784˙750 1˙279˙362 H2020-CS2-CFP02-2015-01
14 NO-ICE-ROTOR 2017 985˙000 749˙987 H2020-CS2-CFP02-2015-01
15 DREAM 2017 1˙454˙805 1˙249˙600 H2020-CS2-CFP03-2016-01
16 FastCan 2017 2˙141˙875 1˙498˙500 H2020-CS2-CFP03-2016-01
17 INSTEP 2017 2˙087˙620 1˙707˙445 H2020-CS2-CFP03-2016-01
18 HVDCGEN 2017 1˙411˙687 988˙181 H2020-CS2-CFP03-2016-01
19 iGear 2017 499˙758 410˙044 H2020-CS2-CFP03-2016-01
20 NAFTI 2017 2˙190˙700 1˙100˙000 H2020-CS2-CFP04-2016-02
21 Constance 2017 861˙530 748˙405 H2020-CS2-CFP04-2016-02
22 HaSU 2017 982˙604 746˙322 H2020-CS2-CFP04-2016-02
23 Wimper 2017 733˙710 600˙000 H2020-CS2-CFP04-2016-02
24 LATTE 2017 464˙437 399˙543 H2020-CS2-CFP04-2016-02
25 DEFENDER 2018 1˙426˙470 1˙115˙004 H2020-CS2-CFP03-2016-01
26 FRC GAM 2018 2018 136˙809˙569 85˙997˙327 H2020-IBA-CS2-GAMS-2017
27 cLEvER 2018 998˙683 696˙329 H2020-CS2-CFP06-2017-01
28 TiltHex 2018 472˙890 331˙023 H2020-CS2-CFP02-2015-01
29 STRONGRCRAFT 2018 2˙666˙150 1˙957˙658 H2020-CS2-CFP06-2017-01
30 FLAPSENSE 2018 1˙056˙040 1˙000˙240 H2020-CS2-CFP06-2017-01
31 HEROe Bearing 2018 854˙193 597˙935 H2020-CS2-CFP06-2017-01
32 CONCERTO 2018 634˙936 634˙936 H2020-CS2-CFP06-2017-01
33 ASTRO 2018 712˙500 498˙750 H2020-CS2-CFP06-2017-01
34 NEXTTRIP 2018 2˙777˙222 2˙582˙756 H2020-CS2-CFP06-2017-01
35 HIRIS 2018 2˙709˙575 1˙500˙000 H2020-CS2-CFP06-2017-01
36 HIGHTRIP 2018 3˙495˙243 3˙495˙243 H2020-CS2-CFP07-2017-02
37 TRINIDAT 2019 3˙346˙396 3˙346˙396 H2020-CS2-CFP08-2018-01
38 ELECTRA 2019 1˙874˙295 1˙200˙000 H2020-CS2-CFP08-2018-01
39 STEADIEST 2019 570˙510 428˙982 H2020-CS2-CFP08-2018-01
40 ADMITTED 2019 1˙718˙330 1˙718˙330 H2020-CS2-CFP08-2018-01
41 TRIcEPS 2019 3˙281˙251 2˙614˙290 H2020-CS2-CFP08-2018-01
42 RoCS 2019 2˙999˙768 2˙842˙172 H2020-CS2-CFP08-2018-01
43 SMAR-TeR 2019 1˙309˙293 1˙309˙293 H2020-CS2-CFP09-2018-02
44 TRAIL 2019 6˙049˙853 5˙199˙438 H2020-CS2-CFP09-2018-02
45 ATTILA 2019 5˙614˙013 5˙614˙013 H2020-CS2-CFP09-2018-02
- - - 213˙958˙515.00 145˙403˙591.00 -