The page lists 29 deliverables related to the research project "Built2Spec".
title and desprition | type | last update |
---|---|---|
State of the art of the next generation thermal self-inspection techniqueSummary of non intrusive instrumentation based on imagery techniques usable in construction sector and benchmark of existing mobile systems. Output of Task 2.1 and part of Task 2.3. Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-10-08 |
Mobile devices lab test resultsDifferent plug-ins and iOS apps will be tested and compared with standardized measurements made according to ISO regulation. The uncertainty associated with the use of microphones class 2 in mobile devices and assess will be quantified and the reliability of the information generated in the acoustic measurements performed with these microphones will be evaluated. Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-10-08 |
Training PlanTraining Plan Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-10-08 |
Building modelling and 3D automated referencingDescription of the different models developed in this task: Wall model, inverse model to determine the building thermal parameters from TIR and direct model to study the impact of actual materials on the building energy balance. Output of task 2.1 and Task 2.2 Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-10-08 |
Pilots resultsFinal comparative and performance assessment of the field test operation by end-users including feedback. Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-06-06 |
Acoustic in situ test resultsEvaluation of experimental results of the novel methodology tested in a controlled environment. The tests done with the software developed and the acoustic methodology created will be reported in this deliverable. The experimental results will be compared with the results obtained from sound insulation measurements done with conventional equipment. Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-06-06 |
Virtual Construction Management Platform (freeware version)A free version of the Virtual construction Management platform will be demonstrated at an dissemination event aimed at the stakeholder community. Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Other | 2019-06-06 |
Methodology for Smart Material Self-Inspection & Quality ChecksOutput of Task 4.1 with photo evidence of prototypes and reporting on the modelling developed in Task 4.2 Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-06-06 |
Data required as evidence of complianceA report defining and describing the characteristics of the data that is required as evidence of compliance with the relevant standards for each self-inspection technique and quality check procedure. Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-06-06 |
Imagery Comparison DeliverableThe output of Task 4.4 will be a document describing and evaluating on construction site data using the image-based technique for identifying discrepancies between as-built and as-planned construction state Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-06-06 |
Contribution to the open source BIM communityOutput of tasks 4.5 and 4.6.This will include new BIM software open source tools improvements development within the project and will be provided to the BIM community to disseminate the new innovations in the industry Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Other | 2019-06-06 |
Critical analysis of the thermal self-inspection techniques and protocols developedValidation report of the developed method under laboratory conditions and also, in realistic conditions, at pilot site scale and critical analysis. Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-06-06 |
Market AnalysisMarket Analysis Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-05-06 |
Use of BIM technologically for self-inspection and quality checksThis report will describe the improved BIM technology with different new features like object level (non- BIM) data linking, IFC GUIDs integrity workflow and (on site) mobile usage from BIM tools in the cloud. This report is a direct output of Task 4.5 Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-05-06 |
Acoustic methodologyReport of acoustic methodology developed for in situ sound insulation measurements with mobile devices and indoor positioning. A methodology for the application of these devices to sound insulation measurements and acoustic maps generation will be developed and reported in this deliverable. Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-05-06 |
Airtightness test methodologyAn efficient method for identifying leakage pathways when using the airtightness tester. In this deliverable, the most efficient method for identifying the leakage pathways between pulse tests will be evaluated and a methodology developed. Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-05-06 |
IAQ specificationsIn this deliverable the detailed specifications for the IAQ interface and for the BIM platform will be described. This interface will have an informative role on the presentation of IAQ results, but also interactive functions making possible an exchange with the users. Especially, this platform will propose recommendations or corrective actions according to the IAQ observed results. Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-05-06 |
Planning and Management of the field test operationsGuidelines, organisation and planning for pilot test implementation in different worksites Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-05-06 |
Public Communication MaterialsGeneral Communication material on the project will be developed for use at dissemination events, websites, workshops etc. for all of the project partners. This will be updated across the project lifetime. Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Other | 2019-05-06 |
Public Website & Press ReleaseThe project website will be designed and built including project Intranet for the consortium. An initial press release highlighting the project will be issues to community stakeholders and partners for further dissemination. The website will be continuously updated and press releases be repeated across the project. Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Other | 2019-05-06 |
Long Term Testing teams Workshop materialsUser manuel documents and pedagogic materials for training end users testing the system on the worksites. Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Other | 2019-05-06 |
IAQ indicatorsProposal of IAQ indicator(s).In this report will be described a group of indicators, allowing qualifying indoor air quality, on the basis of the parameters monitored by the sensor. The indicators development will increase the visibility of the results for the workers and the users. This development will be based on our knowledge of indoor ambiances, regulatory values, guide values and health values. Plus, a thinking will be lead on the use and display of these indicators, related to the IAQ interface development (following task). Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-05-06 |
Performance Gap Assessment MethodologyIn the deliverable D1.2 which is a report the methodology will be described how the mismatch between planned energy performance and the performance at commissioning stage due to the construction process can be assessed. This methodology will be dealing with those parts of the construction process which are being seen as highly influencing the energy performance if not executed as planned. Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-05-06 |
User, Self-Inspection, and Quality Check RequirementsThe final targeted user groups will be identified in a very early stage and during the first months of the project the 6 workshops of task 1.1 with members of the future user groups will be conducted. The output of these workshops will be processed and the needs of the future users regarding self-inspection and quality checks will be identified. These requirements will be reported in the deliverable D1.1 Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-05-06 |
Automated Quality Assurance and Compliance methodologyA report that describes and explains the step by step methodologies required to implement the self-inspection techniques for Quality Assurance and Compliance to achieve the required standards of energy performance and IEQ. In separate sections for each self-inspection technique the report will provide a detailed performance description, or ‘story’, of what the software must do to provide a convenient, easy to use experience for the user of the VCM system. This is necessary as input to WP6 so that the software developers have a clear description of how the software has to function. Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-05-06 |
3D Mobile Capture DeliverableThe output of Task 4.3 will be a demonstration and report of a prototype of on- site 3D model capture with a consumer mobile device Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-05-06 |
Parametric loudspeaker lab test resultsThe characterization of the source will be done in an anechoic room. In addition, a set of reverberation time measurements in buildings and sound insulation measurements will be done to evaluate the level of noise generated by this source. Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-05-06 |
Integrated Self-Inspection Quality Check FrameworkThe framework of the integrated approach which is described in the deliverable D1.3 are based on the outcomes of the 6 workshops processed, compiled and supplemented by additional information. In this report it will also be documented which out of the numerous amount of the elements of the integrated process are selected for the methodology of Virtual Construction Management Platform (VCMP). The deliverable D1.3 directly leads to the development of the system architecture (D1.4) Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Documents, reports | 2019-05-06 |
Minimal Survey Data SetA list of the Minimal Survey Data Set which can be efficiently captured to satisfy each self-inspection technique and quality check procedure and test. Programme: H2020-EU.2.1.5.2. - Topic(s): EeB-03-2014 |
Other | 2019-05-06 |