The page lists 18 deliverables related to the research project "Real-Time-Mining".
title and desprition | type | last update |
---|---|---|
Public comprehensive documentation of industry field test in two applications including results on performance assessments and further potential for improvementScientific article highlighhting the practical results of the integrated Real Time Mining concept experimentally tested at selected field test sites. Its purpose is to provide a foundation for follow up development. Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2020-02-12 |
Report on field measurement results for the positioning system including accuracy and reliability measurementsReport on field measurement results for the positioning system including accuracy and reliability measurements Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2020-02-12 |
Real-Time-Mining Flyer, NewslettersReal-Time-Mining Flyer, Newsletters (months 12;24;36;48) Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Websites, patent fillings, videos etc. | 2020-02-12 |
Demonstrator for the combined underground positioning systemIntegration of the three technologies, inertial navigation system, ultra-wideband system and geometrical scanners into a modular system. Constriuction, demonstration and evaluation. Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Demonstrators, pilots, prototypes | 2020-02-12 |
Report on Integration of central Real-Time Mining control cockpit from WP6 with ZG from task 9.1Report on Integration of central Real-Time Mining control cockpit from WP6 with ZG from task 9.1 Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2020-02-12 |
Report on field measurement results on machine performance sensors – cutting equipmentReport on field measurement results on machine performance sensors – cutting equipment Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2020-02-12 |
Comprehensive documentation of the application demonstration including the data management frameworkReport documenting development of a robust, intuitive, real-time database management and integration system. Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2020-02-12 |
Report with definitive interfaces linking SPI, controlling factors influencing the KPI’s and geological and technical machine or system parameters that need to be measured for effective extraction process controlAs per title, the deliverable will be a report that specifies the agreed interfaces linking SPI, controlling factors influencing the KPI’s and geological and technical machine or system parameters that need to be measured for effective extraction process control Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2020-02-12 |
Documentation on central mine monitoring and control station “Zentrale Grubenwarte†(IGW)Report describing an advanced mine monitoring control, operation and safety system suitable for small scale mines. The report will document the modifications to integrate systems generated in the Real-Time-Mining module Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2020-02-12 |
Statistical inference rule for linking SPIs and sensor measurements and optimized bulk sampling schemesReport describing a statistical inference rule linking SPI’s with sensor measurements for single, bulk and insitu - sample measurements. Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2020-02-12 |
Concepts and algorithmic tools to support decision support in unit operation and auxiliary processes taking advantage of real-time dataReport describing and documenting concepts and algorithmic tools to support decision support in unit operation and auxiliary processes taking advantage of real-time data Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2020-02-12 |
Validated computer assisted short-term scheduling and production control tool utilizing real-time deposit informationReport document a short term mine planning and production control methodology developed during the Real Time Mining project. Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Demonstrators, pilots, prototypes | 2020-02-12 |
D1.3 Catalogue of Sustainability and Industrial Viability Indicators specifically related to REAL-TIME-MINING including a description of required sensor functionality, precision and accuracy needed to quantify SPIsreport cataloguing the development of a set of detailed Sustainable Performance Indicators (SPI) of the process allowing for a measureable quantification of impacts of Real-Time-Mining. Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2020-02-12 |
Proceedings of European Conference for Real-Time MiningPublished compilation of key project findings to date Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2020-02-12 |
Public documentation and detailed description of the theoretically developed algorithms for rapid sequential resource/reserve model updatingPeer reviewed article describing a theoretical framework for updating of resource models developed within the Real Time Mining project. Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2020-02-12 |
Report defining specification of sensor combinations incorporating required precision, identifying preferred location for sensor acquired data acquisition, techno-economic assessmentReport that summarises the initial assessment of sensor requirements with discussion and assessment of suitable sensor combinations. Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Documents, reports | 2020-02-12 |
Project websiteProject website for public project visibility Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Websites, patent fillings, videos etc. | 2020-02-12 |
Validated computer assisted long- and medium term UG mine planning tool taking geological uncertainty into account and the ability to pre-sort and back-fill zero-value materialReport describing a demonstration activity using a mine planning methodology developed during the Real Time Mining project. Programme: H2020-EU.3.5.3. - Topic(s): SC5-11a-2014 |
Demonstrators, pilots, prototypes | 2020-02-12 |