Opendata, web and dolomites

HyVar project deliverables

The page lists 42 deliverables related to the research project "HyVar".

 List of Deliverables

HyVar: list of downloadable deliverables.
title and desprition type last update

Periodic Activity Report – Second release

Second release of the Periodic Activity Report

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-31

Demonstrator System Model v.2.0

Final version of D6.1

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-31

Hybrid Product Reconfiguration Design Guidelines v.2.0

FInal version of D4.1

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-31

Scalability Validation/Test Suite v.2.0

Final version of D4.3

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-31

MSPL demonstrator Results v2.0

Final versione of D6.2

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-31

Dissemination and Exploitation Plan v.1.0

First version of the Dissemination and Exploitation Plan

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

DSVL Tool Chain software modules v.2.0

Final version of the DSVL tool chain

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Other 2019-05-30

Periodic Activity Report - First Release

First release of the Periodic Activity Report

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

Cloud-based inventory system and software manager v.1.0

This deliverable includes the software modules (source code and executables) that implement the inventory system and the software manager in the cloud-based environment.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Other 2019-05-30

Final DSVL Syntax and Semantics specifications

Final DSVL Syntax and Semantics specifications - update from D2.2 and D2.4

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

Engineering Methodology and Processes Guidelines for DSVL v.2.0

Final version of D3.1

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

Communication Strategy & Plan - Final Release

Final version of Communication Strategy & Plan

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

Technical and Business Evaluation Report

This task includes the activities of evaluation of the results from the demonstrator’s execution and the analysis of scalability and resilience of distributed software, with the objective to refine the software prototypes. The evaluation will include also the analysis of results from the usability tests and a business evaluation of the more relevant features supporting the commercial exploitation.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

Variability Mining methodology specifications v.1.0

This documents describers the Variability Mining methodology and its specifications for the developments activitiies- First version

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

Periodic Cost Statements Report - First Release

Cost Statement Report - first period

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

Communication Strategy & Plan v.2.0

Second version of Communication Strategy & Plan - D2.1

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

DSVL Syntax and Semantics specifications v.1.0

This documents defines the DSVL Language Syntax and Semantics

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

DSVL Tool Chain software modules v.1.0

This deliverable includes the software modules which implements the DSVL tool chain in the target devices.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Other 2019-05-30

Demonstrator System Model v.1.0

In this deliverable it will be defined a fragment of the concrete applicative scenario that is suitable for demonstration and evaluation, covering:
-ï‚· An overall end-to-end demonstration scenario, where variables such as number of ECU, heterogeneity and complex updating procedures (i.e. multiple nodes) will be evaluated to properly address scalability and resilience KPIs.
ï‚·- the set of MM ECUs considered by the demonstrator
ï‚· -a set of variants of the software for each ECU together with the cross-ECUs dependencies,
ï‚· -the relevant data that must be collected from the ECUs,
 -an evolution of the ECUs’ software and data that must be collected.
One of the ECUs will be a TCU that will play the role of gateway between the cloud and the vehicle. Within the scope of demonstrator, TCUs will be used as physical equivalents of other vehicle ECUs.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

End-to-end Demonstrator Results v.1.0

This deliverable contains the setup and results of the end-to-end demonstrator applied to the complete demonstration scenario

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

Dissemination and Exploitation Plan - Final Release

Final release of the Dissemination and Exploitation Plan, including a detailed Business Plan

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

Engineering Methodology and Processes Guidelines for DSVL v.1.0

This document contains the engineering guidelines and processes to apply
the DSVL (developed in WP2) in industrial practice

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

Incremental Validation Techniques of Variability Models v.2.0

Final updated version of D3.2

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

Communication Strategy & Plan v.1.0

The preliminary communication activities plan presented in Section 2 of the DOW will be extended and detailed by the HyVar consortium partners during project execution. The plan will be released in three phases, one per year, including activities for all the three industries identified. The plan will include a description of the communication activities to be developed, including blog posts, popular media articles, and conferences/seminars.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-05-30

Scalability Validation/Test Suite v.1.0

This document formalises the virtualized reconfiguration algorithm to experiment with its elastic and scalable behaviour. This formalization allows predictions of how to optimally scale the reconfiguration algorithm and further to identify the requirements to the cloud infrastructure on which the algorithm will be deployed

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

Validation/Test suites against Variability Models v.2.0

Final version of D.3.3

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

Final Requirements specifications for the DSVL

Final version of D1.1 - Final Requirements specifications for the DSVL

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

Project external website

This deliverable includes the set-up and initial publishing of the HyVar website

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-05-30

Incremental Validation Techniques of Variability Models v.1.0

This document contains the results of the verification techniques, such as SAT-solving or CSP-solving, used to validate the variability model defined in the DSVL.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

Periodic Cost Statements Report – Second release

Periodic Cost Statements Report

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

Data Management Plan

This deliverable contains the Data Management Plan accordingy to H2020 guidelines.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Open Research Data Pilot 2019-05-30

Dissemination and Exploitation Plan v. 2.0

Second version of Dissemination and Exploitation Plan - D2.2

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

Virtualized Product Reconfiguration Algorithm Description v.2.0

Final version of D4.2

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

MSPL demonstrator Results v1.0

This deliverable contains the results from the MSPL demonstrator.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

Hybrid Product Reconfiguration Design Guidelines v.1.0

This document containts the product reconfiguration algorithm for hybrid variability selection. This algorithm is hybrid as it combines the variability model, the specific instance configuration, and contextual information from sensor data streams to decide on how a given product configuration should evolve.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

Updated Requirements, Syntax and Semantics and Variability Mining methodology specifications v.2.0

This documents contains Requirements, Syntax and Semantics and Variability Mining methodology specifications in its second version (as an update from D2.1, D2.2 and D3.3)

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

Virtualized Product Reconfiguration Algorithm Description v.1.0

This docuemtn contains the guidelines with the elastic and scalable parallelization of the hybrid reconfiguration algorithm as defined in D4.2

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

Requirements specifications for the DSVL v.1.0

This document contains the requirements for the DSVL sublanguage describing variability models and the DSVL sublanguage for expressing the code base.
First version

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

Cloud-based inventory system and software manager v.2.0

FInal version of the inventory system and the software manager

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Other 2019-05-30

End-to-end Demonstrator Results v.2.0

Final version of D6.3

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-05-30

Project Handbook

This deliverable includes the project plan and the website for the management of deliverables, sharing of information and documents among partners.

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30

Final Variability Mining methodology specifications

Final Variability Mining methodology specifications - update from D2.3 and D2.4

Programme: H2020-EU.2.1.1.3. - Topic(s): ICT-09-2014

download deliverable 

Documents, reports 2019-05-30