The page lists 30 deliverables related to the research project "PANORAMIX".

 List of Deliverables

PANORAMIX: list of downloadable deliverables.
title and desprition type last update

Analysis of User Feedback

Based on the user feedback from the deployment of mix networking with email, we will determine whether or not users found the privacy sufficient. This report will also include the feedback from the living lab research, where the mobile message app is tested with 1000 test users.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Final Review and Assessment

This deliverable will review and assess the activities, results, and progresses of Y3. This will provide a basis for each consortium member to engage in further EU projects with increased performance and efficiency.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Y1 Review and Assessment

This deliverable will review and assess the activities, results, and progresses of Y1. This will provide a basis for moving into Y2 and examine where the consortium was successful and where improvements are needed for the following year.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Initial Requirements, Design, and Prototype

The first version of the system that addresses basic concerns in all three tasks that do not depend on other work packages, requirements addressing the state-of-the-art industry environments, design addressing development methodology and tools, and prototype addressing development, deployment, and the testing environment.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Minimum Viable Product

A viable demonstration of the designs and capabilities developed by Task 5.2, in a first integration with the mix-net service.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Demonstrators, pilots, prototypes 2019-11-28

Minimum Viable Product (MVP)

A functional, deployable, and demonstrable mix-net service implemented according to results and requirements from WP3, WP5, WP6 and WP7.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Applying Mix Nets to Email Document

This report will present the use-case and requirements, based on empirical data, of the mix networking infrastructure, with a focus on usability, a mathematical analysis of the privacy set, and threat models.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Modelling, Design and Analysis:Interim report

First iteration of a NIZK shuffle proof. Describes the shuffle protocol that may be used in implementation within WP5; Integrates robustness into efficient mix-net designs and
decryption mixes; proposes robust definitions of mix-nets as differentially private mechanisms

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Survey/Statistics: Interim report

Interim report including requirements analysis and initial design.
This report will describe the results of the requirements analysis and outline the initial design used to start the implementation.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Initial report

Modelling and Design elements. Describes some of the existing shuffle protocols (WP3.2), initial design options for mix-nets (WP3.1) and definitions of privacy (WP3.3)

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Preliminary Exploitation Plan

In this deliverable the first version of exploitation plan will be presented. It will be aligned with the consortium partners’ business plans and market evaluation.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Requirements and User Interface Design

Documents including a first version of the e-voting
system.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Dissemination Report I

Dissemination reports will be delivered each year and the dissemination plan will be updated if necessary.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Complete Exploitation Plan

We will update D2.5 with exploitation activities already performed including definition of business models for market adoption of results of the project.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Y2 Review and Assessment

This deliverable will review and assess the activities, results, and progresses of Y2. This will provide a basis for moving into Y3 and examine where the consortium was successful and where improvements are needed for the following year.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Dissemination Plan

A dissemination plan will be outlined, where dissemination activities via various channels will be planned as described in Task 2.1.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Public Web Page and Blog

A public webpage will be created and updated throughout the duration of the project.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Websites, patent fillings, videos etc. 2019-11-28

Ethics report

The ethics report details all procedures that will be implemented for data collection, storage, protection, retention and destruction and confirmation of personal information by Panoramix partners.
Copies of ethical approvals by the competent Ethics Committee and copies of approvals for the collection of personal data by the competent University Data Protection Officer / National Data Protection authority will be included, and in case of data not publicly available, relevant authorisations will also be provided if applicable.
This deliverable will also contain templates of the informed consent form to be used.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Dissemination Report II

Dissemination reports will be delivered each year and the dissemination plan will be updated if necessary.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Open-source code of integrated system for desktops

This deliverable, available as code on GitHub with a brief developer guide to the code, will allow system administrators to deploy the mixnetworking infrastructure for email, with clients for desktop and mobile (Android).

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Other 2019-11-28

Integrated System

A fully integrated, tested, and documented system, incorporating any updated requirements and designs from the experience of the MVP that can be disseminated.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Final Service

The final version of the e-voting service, fully documented for developers and
users, and proven in production conditions.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Other 2019-11-28

Dissemination Report III

Dissemination reports will be delivered each year and the dissemination plan will be updated if necessary.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Integrated Service

The integrated service implements the full feature set and incorporates adjustments after the experience with the MVP.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Other 2019-11-28

Standardisation Report

The standardization-related efforts and achievements will be collected in this report.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Scientific Advisory Board Reports

After each EAB meeting EAB will write a report with observations, recommendations and conclusions on actions for increasing the project impact. A summary of all reports will be compiled at the end of the project.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Report on Exploitation Activities and Updated Plan for Further Exploitation

Final update of the exploitation plan will be presented and a list of exploitation activities performed during the last year of the project will be reported.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Final System

A production-ready system and a corresponding internet service incorporating any external feedback and addressing any remaining integration issues.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Final report

Final iteration of the NIZK shuffle proof together with security analysis, and an implementation; validation of mix-net design options and refinement of definitions to suit other WPs

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28

Final report validation & testing

This report will summarize the results of the validation and testing including lessons learned. It
will provide guidance to future adopters of the system.

Programme: H2020-EU.3.7. - Topic(s): DS-01-2014

download deliverable 

Documents, reports 2019-11-28