Opendata, web and dolomites

dReDBox project deliverables

The page lists 31 deliverables related to the research project "dReDBox".

 List of Deliverables

dReDBox: list of downloadable deliverables.
title and desprition type last update

MEC NFV application migration report (a)

In this deliverable, the NFV application migration results will be reported. The document will cover system requirements and expected capabilities, and identify risks.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

System interconnect design and SDN control (a)

Report on the detailed specification of the optical system interconnect and supportive control software design. Final report will also contain validation results of the system interconnect.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

System Architecture specification (b)

This deliverable will report a list of specifications and a high level description of the dReDBox architecture.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

dReDBox use cases demonstration report

In this deliverable a thorough evaluation of execution and value findings of all use cases on the dReDBox platform will be reported.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

Disaggregated Memory system demonstrator

Prototype of dRedBox memory demonstrator implementation

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Demonstrators, pilots, prototypes 2019-10-03

Website and Social Media Presence

Set up the project website, plus a web portal for collaboration between project members and including bidirectional linkage to relevant influential social platforms.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Websites, patent fillings, videos etc. 2019-10-03

Software and hardware system integration and evaluation (a)

Two releases of incremental integration outcome are aimed to be delivered and accompanying evaluation results for a range of in-lab experimental scenarios. This will reflect joint hardware and software activities carried out on T5.3 and T5.4. Documentation is aimed to be delivered at the end of each integration phase of both software and hardware technologies in a single deliverable.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

Disaggregated memory design and management techniques (b)

Report on the detailed specification of the memory adaptation hardware and control logic, interfaces to hypervisor for memory block allocation purposes, and all the necessary memory protection support. Final report will also contain validation results of the disaggregated memory prototype.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

Specification of dReDBox layers, operational semantics and cross-layer interfaces (a)

Report on iterative specification of the dReDBox layers, along with relevant interfaces and performance simulation results and findings. The final specification will feed into the final system architecture specification to be reported in D2.3/2.4/2.5.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

Video analytics application migration report (b)

In this deliverable, the surveillance application migration results will be reported. The document will cover system requirements and expected capabilities, and identify risks.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

Dissemination Plan and Report (c)

A dissemination plan for the project describing the appropriate communication strategy for increased awareness of project results in the various relevant end-user communities, the industry and the scientific community. The plan will also include the production of dissemination materials (printed project materials, brochures, information package and other dissemination materials). A list of related projects on EU and national levels will be also compiled and maintained. Further deliverables will report on the dissemination eminence of the project and wherever needed, refine and update the dissemination plan according to technological, scientific and market evolution.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

System Software Architecture, Interfaces and Techniques (b)

Periodic report summarizing the results of the system software specification performed and associated research results obtained in Tasks 4.1, 4.2, 4.3 and 4.4.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

System interconnect design and SDN control (b)

Report on the detailed specification of the optical system interconnect and supportive control software design. Final report will also contain validation results of the system interconnect.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

Dissemination Plan and Report (d)

A dissemination plan for the project describing the appropriate communication strategy for increased awareness of project results in the various relevant end-user communities, the industry and the scientific community. The plan will also include the production of dissemination materials (printed project materials, brochures, information package and other dissemination materials). A list of related projects on EU and national levels will be also compiled and maintained. Further deliverables will report on the dissemination eminence of the project and wherever needed, refine and update the dissemination plan according to technological, scientific and market evolution.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

Specification of dReDBox layers, operational semantics and cross-layer interfaces (b)

Report on iterative specification of the dReDBox layers, along with relevant interfaces and performance simulation results and findings. The final specification will feed into the final system architecture specification to be reported in D2.3/2.4/2.5.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

System Architecture specification (c)

This deliverable will report a list of specifications and a high level description of the dReDBox architecture.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

Dissemination Plan and Report (a)

A dissemination plan for the project describing the appropriate communication strategy for increased awareness of project results in the various relevant end-user communities, the industry and the scientific community. The plan will also include the production of dissemination materials (printed project materials, brochures, information package and other dissemination materials). A list of related projects on EU and national levels will be also compiled and maintained. Further deliverables will report on the dissemination eminence of the project and wherever needed, refine and update the dissemination plan according to technological, scientific and market evolution.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

Requirements Specification and KPIs Document (b)

This report from T2.1 and T2.2 aims to provide a description and requirements specification of pilot use cases, and derived dReDBox KPIs. The first iteration will also provide a first system concept proposal to feed D2.3/2.4/2.5.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

Hardware integration and tests of all bricks and tray

This report aims to provide all results associated with the design, implementation of the computer brick, the memory brick and the accelerator brick as well as the host tray that will integrate the high-radix switch addressed in T5.1 and T5.2. M23 Deliverable will focus on integration and tests.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

System Architecture specification (a)

This deliverable will report a list of specifications and a high level description of the dReDBox architecture.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

System Software Architecture, Interfaces and Techniques (a)

Periodic report summarizing the results of the system software specification performed and associated research results obtained in Tasks 4.1, 4.2, 4.3 and 4.4.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

Requirements Specification and KPIs Document (a)

This report from T2.1 and T2.2 aims to provide a description and requirements specification of pilot use cases, and derived dReDBox KPIs. The first iteration will also provide a first system concept proposal to feed D2.3/2.4/2.5.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

Video analytics application migration report (a)

In this deliverable, the surveillance application migration results will be reported. The document will cover system requirements and expected capabilities, and identify risks.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

Network analytics application migration report (b)

In this deliverable, the network analytics application migration steps will be reported. The document will cover system requirements and expected capabilities, and identify risks.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

MEC NFV application migration report (b)

In this deliverable, the NFV application migration results will be reported. The document will cover system requirements and expected capabilities, and identify risks.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

System Software Architecture, Interfaces and Techniques (c)

Periodic report summarizing the results of the system software specification performed and associated research results obtained in Tasks 4.1, 4.2, 4.3 and 4.4.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

Disaggregated memory design and management techniques (a)

Report on the detailed specification of the memory adaptation hardware and control logic, interfaces to hypervisor for memory block allocation purposes, and all the necessary memory protection support. Final report will also contain validation results of the disaggregated memory prototype.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

Software and hardware system integration and evaluation (b)

Two releases of incremental integration outcome are aimed to be delivered and accompanying evaluation results for a range of in-lab experimental scenarios. This will reflect joint hardware and software activities carried out on T5.3 and T5.4. Documentation is aimed to be delivered at the end of each integration phase of both software and hardware technologies in a single deliverable.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

Hardware requirements and design of all bricks and tray

This report aims to provide all results associated with the design, implementation of the computer brick, the memory brick and the accelerator brick as well as the host tray that will integrate the high-radix switch addressed in T5.1 and T5.2. M11 Deliverable will focus on hardware requirements and design.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

Dissemination Plan and Report (b)

A dissemination plan for the project describing the appropriate communication strategy for increased awareness of project results in the various relevant end-user communities, the industry and the scientific community. The plan will also include the production of dissemination materials (printed project materials, brochures, information package and other dissemination materials). A list of related projects on EU and national levels will be also compiled and maintained. Further deliverables will report on the dissemination eminence of the project and wherever needed, refine and update the dissemination plan according to technological, scientific and market evolution.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03

Network analytics application migration report (a)

In this deliverable, the network analytics application migration steps will be reported. The document will cover system requirements and expected capabilities, and identify risks.

Programme: H2020-EU.2.1.1. - Topic(s): ICT-04-2015

download deliverable 

Documents, reports 2019-10-03