The page lists 12 deliverables related to the research project "CARIM".
title and desprition | type | last update |
---|---|---|
Industrial workshops (2)D6.9: Industrial workshops. M12, M28 Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015 |
Websites, patent fillings, videos etc. | 2019-05-30 |
Manufactured Prototypes for homologationD3.4: Prototypes for testing and validation of the wheel / Manufacturing process data. M18 Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015 |
Demonstrators, pilots, prototypes | 2019-05-30 |
Environmental test report for carbon wheelD4.2 Results of environmental test report of carbon wheel prototypes. M28 Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015 |
Documents, reports | 2019-05-30 |
Open access publicationsD5.3: Publications: at least 2 Open Access, peer-reviewed publications and 2 publications in other media e.g. trade journals. Reported at the end of the project in M28 Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015 |
Websites, patent fillings, videos etc. | 2019-05-30 |
Presentation of the project at trade fairs and conferencesD5.4: Presentation of the project at least 2 trade fairs and conferences. Reported M28 Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015 |
Websites, patent fillings, videos etc. | 2019-05-30 |
Process chain ready for production of prototypesD3.3: Implemented manufacturing process chain for preforming and HP-RTM in industrial scale with integrated monitoring system for prototype production. M18 Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015 |
Demonstrators, pilots, prototypes | 2019-05-30 |
Report for dynamic full life-cycle simulationD4.3 Full life-cycle simulation report, correlated with mechanical tests. M18 Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015 |
Documents, reports | 2019-05-30 |
Regularly updated dissemination materialD5.2: Dissemination material: at least 2 press releases, project presentation, poster and flyer, newsletter and synopsis of results, prepared starting from month 3 and regularly updated. M6 (onwards) Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015 |
Websites, patent fillings, videos etc. | 2019-05-30 |
HP-RTM mold for manufacturing of the wheel ready to be taken into operationD3.2: Final design of HP-RTM mold for manufacturing of the wheel / manufactured mold ready to be taken into operation on HP-RTM equipment available at Fraunhofer ICT. M12 Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015 |
Demonstrators, pilots, prototypes | 2019-05-30 |
Project website; continuously updatedD5.1: Project website; the public website will be functioning by month 3, and it will continuously be updated with the public results of the project, and with information directed to the different expected audiences. M3 Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015 |
Websites, patent fillings, videos etc. | 2019-05-30 |
Industrial workshops (1)D6.5: Industrial workshops. M12, M24 Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015 |
Websites, patent fillings, videos etc. | 2019-05-30 |
Preforming mould and manufacturing equipment ready to be taken into operationD3.1: Final design of preforming mold and equipment technology for manufacturing of wheel preforms / manufactured mold ready to be taken into operation on the PreformCenter equipment at Fraunhofer ICT. M12 Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015 |
Demonstrators, pilots, prototypes | 2019-05-30 |