The page lists 17 deliverables related to the research project "MIGRATE".
title and desprition | type | last update |
---|---|---|
Recommendations for a deployment roadmap of grid connection rules and novel power system control lawsThis Report will describe the synergies between Exploitation and Dissemination activities and involved the ACER statements in order to implement a deployment Roadmap for a new or adapted Connection rules and System control laws Programme: H2020-EU.3.3.4. - Topic(s): LCE-06-2015 |
Documents, reports | 2020-04-03 |
Mitigation of power-quality disturbances and provision of differentiated PQThe Report will propose mitigation Solutions with regard to Programme: H2020-EU.3.3.4. - Topic(s): LCE-06-2015 |
Documents, reports | 2020-04-03 |
Requirement guidelines for generating units that enable to operate a grid without synchronous machinesThe document will provide Guidelines for generating Units operating in a grid without synchronise machines Programme: H2020-EU.3.3.4. - Topic(s): LCE-06-2015 |
Documents, reports | 2020-04-03 |
Recommendations for connection code implementationThis document will provide recommendations for the network connection code implementation (on the basis of the three most impacted European connection codes). It indicates a methodology to assess the conditions under which higher levels of PE penetration can be implemented without harming the system operational security. Programme: H2020-EU.3.3.4. - Topic(s): LCE-06-2015 |
Documents, reports | 2020-04-03 |
Final project conference proceedings to disclose the consortium conclusions and recommendationsThe Report will describe the minutes of meeting of the final conference in Brussels and delivers the final recommendations of the project as well. Programme: H2020-EU.3.3.4. - Topic(s): LCE-06-2015 |
Documents, reports | 2020-02-07 |
New options for existing system services and needs for new system servicesThe document will describe new ancillary services which may be needed in Systems with 100% PE, whereas existing ancillary services as provided today may also have to be implemented differently. Programme: H2020-EU.3.3.4. - Topic(s): LCE-06-2015 |
Documents, reports | 2019-10-29 |
Influence of PQ disturbances on operation of PE rich power networksThe Report will describe the impacts Programme: H2020-EU.3.3.4. - Topic(s): LCE-06-2015 |
Documents, reports | 2019-10-29 |
Recommendations for the future evolution of the synchronized measurement technology and deployment in EuropeThe Report describes: Programme: H2020-EU.3.3.4. - Topic(s): LCE-06-2015 |
Documents, reports | 2019-10-29 |
Report on systemic issuesThe report will describe the challenges with an increasing share of PE devices in the grid regading systemic issues Programme: H2020-EU.3.3.4. - Topic(s): LCE-06-2015 |
Documents, reports | 2019-09-06 |
Critical PQ phenomena and sources of PQ disturbances in PE rich power systemsThe document will provide a summary of: Programme: H2020-EU.3.3.4. - Topic(s): LCE-06-2015 |
Documents, reports | 2019-09-06 |
Description of system needs and test casesThe Report describes a setting of coherent and complete framework to support the approach of 100% converter-based devices connected. Programme: H2020-EU.3.3.4. - Topic(s): LCE-06-2015 |
Documents, reports | 2019-09-06 |
Propagation of PQ disturbances through the power networksThe Report will deliver: Programme: H2020-EU.3.3.4. - Topic(s): LCE-06-2015 |
Documents, reports | 2019-09-06 |
Proceedings of workshops with stakeholdersThe reports will summarize the Minutes of Meetings with the stakeholders (Reference Group, ENSTO-E, EDSO....) Programme: H2020-EU.3.3.4. - Topic(s): LCE-06-2015 |
Documents, reports | 2019-09-06 |
Project web siteA website will be developed in the project as one of the main interfaces towards the stakeholders who are interested in the work and achievements of the project. Moreover, the project website: Programme: H2020-EU.3.3.4. - Topic(s): LCE-06-2015 |
Websites, patent fillings, videos etc. | 2019-09-06 |
Requirements for monitoring and forecasting PE-based KPIsThe Report will describe based on the Output of WP 1 the requirements for forecasting and Monitoring PE-based KPIs. Programme: H2020-EU.3.3.4. - Topic(s): LCE-06-2015 |
Documents, reports | 2019-09-06 |
Communication master planDissemination strategy: objectives and targets; Programme: H2020-EU.3.3.4. - Topic(s): LCE-06-2015 |
Documents, reports | 2019-09-06 |
Lessons learned from the pilot testing of monitoring and forecasting KPIs enabling TSOs to assess the impact of PE-penetrationThe document proposed methodologies to be applied with the existing infrastructure among the project partners. If the results are not fully positive, a solution will be proposed (whether based on pseudo-measurements or simulations) to enable the further deployment. Programme: H2020-EU.3.3.4. - Topic(s): LCE-06-2015 |
Documents, reports | 2019-09-06 |