Opendata, web and dolomites

GREENERNET project deliverables

The page lists 19 deliverables related to the research project "GREENERNET".

 List of Deliverables

GREENERNET: list of downloadable deliverables.
title and desprition type last update

Technical plans of the field test system

Report on the whole test environment plans including
layout, schematics, wiring, test operation steps and expected verification procedure.

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2020-03-20

Dissemination and Communication plan & report

reports the T6.1 activities

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Websites, patent fillings, videos etc. 2020-03-20

Final Progress reports

reports the overall work and the results provided

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2020-03-20

Product Royalties Mgmt

CE certification

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2020-03-20

Optimized electrolytes

electrolytes will be optimized on performance and cost targets.

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2020-03-20

First Year Progress reports

reports the first year of GREENERNET activity

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2020-03-20

Industrial requirements the AQDS battery production.

Technical report which de- scribes main
problems and functionalities to be supported by GREENERNET developments.

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2020-03-20

First Multi-objective microgrid optimisation tool

different microgrid components will be
optimized with regard to several constraints

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2020-03-20

Design reports

Technical report which includes the obtained reference model satisfying industrial
requirements detected in T1.1 and the high level architecture design based on this reference model that will be
used for implementing GREENERNET solution

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2020-03-20

Requirement document for the BSC and a specification of the control algorithms.

This document will include the main details on the BSC development.

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2020-03-20

Specification of the BSC controller

Detailed specification and design of the BSC controller, and
the respective implementation within the reference embedded platform.

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2020-03-20

Final industrial design of the battery

a final industrial design for a marketable battery will
be realized.

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2020-03-20

Report on battery lab tests and validation

a report including the battery validation will be
realized, including a final chapter on critical issues eventually evidenced

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2020-03-20

Final Residential/SME microgrid management platform

Final Residential/SME microgrid management platform

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Other 2020-03-20

Residential/SME microgrid management platform

Residential/SME microgrid management platform

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2020-03-20

Final Multi-objective microgrid optimisation tool

Final Multi-objective microgrid optimisation tool

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Other 2020-03-20

Documentation of the test operation

Report on the result of the test operation

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2020-03-20

Uses Cases Test Report

This deliverable report the actual data from test cycles.

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2020-03-20

Report on battery standalone tests and validation

a report on the battery in-field standalone
validation will be realized, including a final chapter on critical issues eventually evidenced.

Programme: H2020-EU.3.;H2020-EU.2. - Topic(s): FTIPilot-1-2015

download deliverable 

Documents, reports 2020-03-20