Explore the words cloud of the BLUE SNOW project. It provides you a very rough idea of what is the project "BLUE SNOW" about.
The following table provides information about the project.
Coordinator |
CTRL4 ENVIRO SL
Organization address contact info |
Coordinator Country | Spain [ES] |
Project website | http://www.ctrl4enviro.com/ |
Total cost | 71˙429 € |
EC max contribution | 50˙000 € (70%) |
Programme |
1. H2020-EU.3.4. (SOCIETAL CHALLENGES - Smart, Green And Integrated Transport) 2. H2020-EU.2.1.1. (INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies - Information and Communication Technologies (ICT)) 3. H2020-EU.2.3.1. (Mainstreaming SME support, especially through a dedicated instrument) |
Code Call | H2020-SMEINST-1-2016-2017 |
Funding Scheme | SME-1 |
Starting year | 2016 |
Duration (year-month-day) | from 2016-09-01 to 2017-02-28 |
Take a look of project's partnership.
# | ||||
---|---|---|---|---|
1 | CTRL4 ENVIRO SL | ES (CERVERA LLEIDA) | coordinator | 50˙000.00 |
Despite the huge amount of electrical energy needed to move a ropeway up to a mountain, higher as faster it turns, all around the globe they keep turning at the same nominal speed regardless how many people are waiting for boarding. It would be obvious to adjust the frequency of pass of gondolas, chair lifts or ropeways in general to the number of users that are waiting. In a ski resort, that number uses to be low most of time, workdays. Therefore, a system able to automatically know how long people must wait and able to modify the ropeway speed according to it, could noticeably reduce the energy consumption and would offer a better service during the rush hour. Ropeways have the possibility of manually modifying their speed already, a task that can be performed by the driver. Nevertheless, regarding the experience of ski resorts managers, it is more critical asking him/her to take care of the boarding manoeuvres of users than optimizing the ropeway speed, hence that last uses to turn at its nominal speed. Blue Snow is an integrated system that: 1. Determines the queue waiting-time in the boarding area of a ropeway and informs about it to users and facility managers. This part has been pilot-tested. 2. Automatically optimizes the speed of the ropeway so that it can save energy and it prevents queues. The company has this part patent-pending. Determination of the queue waiting-time is privacy-respectful, thanks to the use of thermal cameras. Without ignoring other applications, like urban transport by cable or leisure parks, the worldwide market of ski-resorts for Blue Snow is estimated to be 500 M€, while European one is 200 M€. This SME Instrument application is to reach that second one as first and highest cost-effective target. Acquiring a better knowledge of the market and its stakeholders, preparing with a ropeway manufacturer a pilot to test the designed speed-modulation system and refining a business plan are the planned activities to carry on with the gran
Are you the coordinator (or a participant) of this project? Plaese send me more information about the "BLUE SNOW" project.
For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.
Send me an email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.
Thanks. And then put a link of this page into your project's website.
The information about "BLUE SNOW" are provided by the European Opendata Portal: CORDIS opendata.