The page lists 31 deliverables related to the research project "CPaaS.io".
title and desprition | type | last update |
---|---|---|
CPaaS.io System Architecture (V1)This Deliverable provides the system architecture of the CPaaS.io project as a set of Views and Perspective following the Architectural Reference Model framework and methodology. In particular it provides a Functional View that features a functional decomposition in Functional Components with interfaces, an Information view that provides information about data storage, ontologies, plus a comprehensive set of System Use-cases. Two additional views, namely P-R and Context Views are also part of the system architecture. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
Data Management Plan (V1)This deliverable contains the CPaaS.io Data Management Plan will outline the approach and mechanisms that will be put in place to handle, curate and facilitate where possible the open access to data collected and generated by CPaaS.io. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
Exploitation Plans and Activities (V1)Includes the exploitation plans for all individual partners plus the consortium as a whole and documents concrete exploitation activities that have occurred. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
Empowerment Components DefinitionThis deliverable will resume the initial work of task 5.1 in order to provide an initial definition of the global requirements and solutions to be used to define the mechanism to be used for empowering user with the control of their information. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
Requirement Collection and AnalysisThis deliverable consists of a document describing the requirement process and the main outcome of this activity. An annex to this main document consists of VOLERE template that captures all kinds of requirements mentioned above with mapping to architecture Views and Perspectives. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
Requirements Specification (V1)This deliverable contains an initial description of each use including the application architecture, definition of data sources, a description of the user interfaces and an initial backlog of user stories ready to be implemented. An update will be delivered before the second implementation and validation phase in D2.5. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
First Ethics ReportAfter definition of the requirements (month 3) and the definition of the holistic data management approach (D6.1, month 6), and ethics review will be undertaken. This report will summarize the findings of the ethics analysis performed in Task 2.1, as well as the measures designed for ensuring compliance with the ethical standards of H2020, including informed consent procedures, measurements for preventing the risk of enhancing vulnerability/stigmatization of individuals/groups, incidental findings procedures, procedures for data collection, storage, retention and destruction and confirmation that these comply with national and EU legislation in cases where such procedures are identified as required. Copies of ethical approvals for the collection of personal data by the competent University Data Protection officer /National Data Protection authority (if required) and other relevant documents, by instance, informed consent Forms and Information Sheets, will be annexed. A further release of the report will be produced at the end of the project (Month 30) to report any updates that became necessary in the course of the project. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
Dissemination and Standardisation Report (V1)Report on all activities regarding standardisation and dissemination. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
Project WebsiteThe website is the first address for the general public to get information about the project. In addition to general information about the project, and the technical and scientific content (deliverables, scientific papers, links to source code etc.) it will contain information in an easily consumable format (e.g., videos and blogs) about the use cases and the societal benefits of the project. The website is updated regularly. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Websites, patent fillings, videos etc. | 2019-07-18 |
Holistic Data Management: State of the ArtReport describing the state of the art regarding data quality annotations in general and specifically for IoT data, data linking and semantic annotations and identification of relevant privacy mechanisms. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
City Stakeholder Group Workshop ISummary of the results from the first stakeholder group workshop. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
Requirements Specification (V2)This deliverable contains an update to the Requirements Specification (D2.1) before the second implementation and validation phase. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
Holistic Data Management: Initial Concepts and ModelsReport containing initial concepts and models developed in the respective tasks of this work package. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
User Empowerment ArchitecturalThis deliverable will integrate the final components definition from task 5.1 and the proposed mechanism for privacy preserving defined in task 5.2 in order to provide a global architectural vision of the approach provided in the project for the user empowerment. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
City Stakeholder Group Workshop IISummary of the results from the second stakeholder group workshop. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
CPaaS.io Final System ArchitectureUpdated version of D3.5 containing the completed architecture. It will also include a requirement cross-check and an assessment in regards to the IoT ARM. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
Holistic Data Management: Refined Concepts and ModelsReport containing the refined concepts and models developed in the respective tasks of this work package (update of D6.3), taking into account the experiences and learnings from the first use case trials and feedback from stakeholders. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
Profiling Specifications for Cloud-Edge OrchestrationThis deliverable will describe the procedures involved in the final task migration system and evaluate important performance-related aspects (from those discussed in D4.1), potentially also together with aspects of task deployment mechanisms of Task 4.3. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
City Stakeholder Group Workshop IIISummary of the results from the third stakeholder group workshop. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
Feedback and Validation Report (V1)This deliverable contains the results of Tasks 2.3 and 2.4, i.e., it contains a report on the pilot execution and the validation report of the use cases and platform. It will summarize the main aspects of the feedback from the pilot execution and provide a detailed report of the use case and platform validation process and results. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
Dissemination and Standardisation Report (V2)Updated version of D7.3. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
CPaaS.io System Architecture (V3)Updated version of D3.3. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
Feedback and Validation Report (V2)This deliverable is an updated version of D2.6, containing a report on the pilot execution and the validation report of the use cases and platform. It will provide a detailed report of the use case and platform validation process and results. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
Analysis and Selection of Task Migration TechnologiesThis deliverable will analyse potential task migration techniques that can be aligned with the overall CPaaS architecture and investigate selected task migration aspects (such as application support, dynamicity, or migration overhead) which require enhancements in order to best serve the project and its Use Cases. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
Data Management Plan (V2)Updated version of D7.2. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
Criteria for Validating Federation and TransferabilityThis deliverable will define the criteria for assessing the platforms federation and transferability criteria based on the event management cases. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
Project Final ReportPublic report summarizing all the achievements of the project in regards to technical progress, use cases and exploitation opportunities. It will also include a roadmap for further R&D work. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
Dissemination and Standardisation Report (V3)Updated version of D7.6. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
CPaaS.io System Architecture (V2)Updated version of D3.2, taking into account the first experiences with the platform. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
Validation of Federation and TransferabilityThis deliverable will report on the evaluation results of federation and transferability criteria for the event management and use cases. In particular it will provide Blue Prints as synthesized results of the transferability analysis performed in task T2.4. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |
Final Ethics ReportThis is an update of the first ethics report in D2.3 to report any changes and additions that became necessary in the course of the project. Programme: H2020-EU.2.1.1. - Topic(s): EUJ-02-2016 |
Documents, reports | 2019-07-18 |