Opendata, web and dolomites

IN2SMART SIGNED

Intelligent Innovative Smart Maintenance of Assets by integRated Technologies

Total Cost €

0

EC-Contrib. €

0

Partnership

0

Views

0

Project "IN2SMART" data sheet

The following table provides information about the project.

Coordinator
HITACHI RAIL STS SPA 

Organization address
address: VIA MANTOVANI 3/5
city: GENOVA
postcode: 16151
website: www.ansaldo-sts.com/it/index.html

contact info
title: n.a.
name: n.a.
surname: n.a.
function: n.a.
email: n.a.
telephone: n.a.
fax: n.a.

 Coordinator Country Italy [IT]
 Project website http://projects.shift2rail.org/s2r_ip3_n.aspx
 Total cost 7˙290˙632 €
 EC max contribution 7˙290˙632 € (100%)
 Programme 1. H2020-EU.3.4.8.3. (Innovation Programme 3: Cost Efficient and Reliable High Capacity Infrastructure)
 Code Call H2020-S2RJU-CFM-2016-01-1
 Funding Scheme Shift2Rail-RIA
 Starting year 2016
 Duration (year-month-day) from 2016-09-01   to  2019-10-31

 Partnership

Take a look of project's partnership.

# participants  country  role  EC contrib. [€] 
1    HITACHI RAIL STS SPA IT (GENOVA) coordinator 1˙635˙393.00
2    TRAFIKVERKET - TRV SE (BORLANGE) participant 773˙256.00
3    STRUKTON RAIL BV NL (UTRECHT) participant 766˙590.00
4    NETWORK RAIL INFRASTRUCTURE LIMITED UK (LONDON) participant 733˙260.00
5    SNCF RESEAU FR (LA PLAINE SAINT-DENIS) participant 653˙186.00
6    DEUTSCHE BAHN AG DE (BERLIN) participant 466˙937.00
7    BOMBARDIER TRANSPORTATION SWEDEN AB SE (VASTERAS) participant 293˙303.00
8    THALES GROUND TRANSPORTATION SYSTEMS UK LTD UK (READING) participant 288˙881.00
9    DEUTSCHES ZENTRUM FUER LUFT - UND RAUMFAHRT EV DE (KOELN) participant 248˙863.00
10    FRAUNHOFER GESELLSCHAFT ZUR FOERDERUNG DER ANGEWANDTEN FORSCHUNG E.V. DE (MUNCHEN) participant 239˙976.00
11    VIRTUAL VEHICLE RESEARCH GMBH AT (GRAZ) participant 193˙320.00
12    SIEMENS AKTIENGESELLSCHAFT DE (MUNCHEN) participant 184˙650.00
13    CENTRO DE ESTUDIOS DE MATERIALES Y CONTROL DE OBRA SA ES (MALAGA) participant 184˙426.00
14    SIEMENS MOBILITY GMBH DE (MUNCHEN) participant 148˙650.00
15    MER MEC SPA IT (MONOPOLI) participant 111˙090.00
16    CAF TURNKEY & ENGINEERING SOCIEDAD LIMITADA ES (ZAMUDIO) participant 88˙880.00
17    FCP FRITSCH, CHIARI & PARTNER ZIVILTECHNIKER GMBH AT (WIEN) participant 86˙653.00
18    OBB-Infrastruktur AG AT (WIEN) participant 70˙331.00
19    ACCIONA CONSTRUCCION SA ES (ALCOBENDAS) participant 53˙327.00
20    INFRAESTRUTURAS DE PORTUGAL SA PT (LISBOA) participant 37˙870.00
21    TURKIYE CUMHURIYETI DEVLET DEMIR YOLLARI ISLETMESI GENEL MUDURLUGU TR (ANKARA) participant 16˙230.00
22    WIENER LINIEN GMBH &CO KG AT (WIEN) participant 15˙553.00
23    SCHWEIZERISCHE BUNDESBAHNEN SBB CH (BERN) participant 0.00

Map

 Project objective

IN2SMART represents the 1st proposal of the Shift2Rail members referred, according to MAAP, to the following Technology Demonstrators (TDs): TD3.7 Railway Information Measuring and Monitoring System (RIMMS), TD3.6 Dynamic Railway Information Management System (DRIMS) and TD3.8 Intelligent Asset Management Strategies (IAMS). These TDs will deploy an overall concept for Intelligent Asset Management based on the following three main interlinked layers: •Measuring and Monitoring systems to collect data from the field related to the railway assets status: IN2SMART will develop unmanned systems for “remote” monitoring; track geometry, switches & crossings and signalling monitoring systems; innovative measurement of train parameters and wheel defects combined with rolling stock identifications systems. •Data management, data mining and data analytics procedures to process data from the field and from other sources: IN2SMART will develop standard open interfaces to access heterogeneous maintenance-related data; analytic tools to automatic detect anomalies, discover and describe maintenance workflow processes and predict railway assets decay towards prescriptive maintenance. •Degradation models and decision making tools to support maintenance strategies and execution: IN2SMART will lay the foundation of a generic framework for asset management and decision support process. This framework will specify the scope, objectives, workflow and outcomes of the decision-making process for maintenance interventions planning, and will be the enabler for the development of future decision support tools and systems. IN2SMART will also develop an optimised tamping tool and a robot platform for maintenance works. IN2SMART will complement the work of the IN2RAIL lighthouse project to reach a homogeneous TRL4/5 demonstrator. The following Grant will start from IN2SMART to reach the final Integrated Technology Demonstrators that will deploy the overall concept of Intelligent Asset Management.

 Deliverables

List of deliverables.
Requirements analysis and Definition of standard guideline Documents, reports 2020-01-24 15:10:31
Requirements and KPI Documents, reports 2020-01-24 15:10:31
Dissemination and data management plans, including project web site Documents, reports 2020-01-24 15:10:31
Report on track/switch parameters and problem zones Documents, reports 2020-01-24 15:10:31
Open data: a review of the state-of-the-art Documents, reports 2020-01-24 15:10:31

Take a look to the deliverables list in detail:  detailed list of IN2SMART deliverables.

 Publications

year authors and title journal last update
List of publications.
2018 Narezo Guzman, Daniela; Hadzic, Edin; Schuil, Robert; Baars, Eric; Groos, Jörn Christoffer
Data-driven condition now- and forecasting of railway switches for improvement in the quality of railway transportation
published pages: , ISSN: , DOI:
4th European Conference of the Prognostics and Health Management (PHM) Society 2020-01-24
2018 Narezo Guzman, Daniela; Hadzic, Edin; Schuil, Robert; Baars, Eric; Groos, Jörn C.
Turning data driven condition now- and forecasting for railway switches into maintenance actions
published pages: , ISSN: , DOI: 10.5281/zenodo.1491428
Transport Research Arena 2018 Conference Proceedings 2020-01-24
2018 Alice Consilvio; Carlo Crovetto; Benoit Guyot; Andy Kirwan; Nadia Mazzino; Federico Papa
Towards an intelligent and automated platform for railway Asset Management
published pages: , ISSN: , DOI: 10.5281/zenodo.1441166
Transport Research Arena Conference Proceedings 16-19 April 2018 2020-01-24
2017 Beate Dutschk- Jörn C. Groos- Edin Hadzic- Thomas Böhm
Deeper insight in railway switch condition nowcasting
published pages: , ISSN: , DOI:
2020-01-24
2017 Alice Consilvio, Carlo Crovetto, Nadia Mazzino, Federico Papa
La digitalizzazione dell\'infrastruttura ferroviaria: verso una piattaforma intelligente per la manutenzione predittiva
published pages: , ISSN: , DOI:
2020-01-24

Are you the coordinator (or a participant) of this project? Plaese send me more information about the "IN2SMART" project.

For instance: the website url (it has not provided by EU-opendata yet), the logo, a more detailed description of the project (in plain text as a rtf file or a word file), some pictures (as picture files, not embedded into any word file), twitter account, linkedin page, etc.

Send me an  email (fabio@fabiodisconzi.com) and I put them in your project's page as son as possible.

Thanks. And then put a link of this page into your project's website.

The information about "IN2SMART" are provided by the European Opendata Portal: CORDIS opendata.

More projects from the same programme (H2020-EU.3.4.8.3.)

IN2TRACK2 (2018)

Research into enhanced track and switch and crossing system 2

Read More  

FUNDRES (2019)

FUTURE UNIFIED DC RAILWAY ELECTRIFICATION SYSTEM

Read More  

Assets4Rail (2018)

Measuring, monitoring and data handling for railway assets; bridges, tunnels, tracks and safety systems

Read More