The page lists 9 deliverables related to the research project "MISTRAL".
title and desprition | type | last update |
---|---|---|
Report on Business ViabilityThe report describes the value network enabling the techno-economic proposition designed in D2.1 (Scenario portfolio and techno-economic proposition). It describes the offerings and business rationale enabling the techno-economic proposition (Business model) and a comparative quantitative analysis based on life cycle costs. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-03-2015 |
Documents, reports | 2019-07-22 |
Validated Techno-economic propositionThe report describes the final techno-economic proposition validated in view of the findings generated by WP3 (Business Viability Analysis) and WP4 (Technical Viability Analysis). Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-03-2015 |
Documents, reports | 2019-07-22 |
Report on Technical and Quality of Service ViabilityThe report describes the Specification and feasibility analysis of Railway specific Emergency Calls over IP and the Requirements Specification and Feasibility Estimate of Railway specific mandatory QoS to new communication system. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-03-2015 |
Documents, reports | 2019-07-23 |
MISTRAL WebsiteMain features: Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-03-2015 |
Websites, patent fillings, videos etc. | 2019-06-19 |
Scenario Portfolio and Techno-economic propositionThe report covers the following: Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-03-2015 |
Documents, reports | 2019-06-19 |
Report on Market ForcesThe report reviews the current market landscape meant to contribute to the AS-IS scenario and the survey of market trends that will shape the TO-BE scenario. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-03-2015 |
Documents, reports | 2019-06-19 |
Dissemination PlanThe Dissemination Plan describes the initial dissemination strategy and plan agreed with other Consortium partners. The plan will be continually monitored, updated and reported during the course of the project. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-03-2015 |
Documents, reports | 2019-06-19 |
Technological Forces and Railway Performance Conditions AnalysisThe report reviews the current technological landscape and railway specific parameters contributing to the AS-IS scenario (e. g., data bandwidth, number of UEs/connections, operational voice requirements). Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-03-2015 |
Documents, reports | 2019-06-19 |
Final Dissemination ReportThis document is the final dissemination report produced at the end of the project. Programme: H2020-EU.3.4.8.2. - Topic(s): S2R-OC-IP2-03-2015 |
Documents, reports | 2019-06-19 |