Opendata, web and dolomites

NIGHTINGALE project deliverables

The page lists 8 deliverables related to the research project "NIGHTINGALE".

 List of Deliverables

NIGHTINGALE: list of downloadable deliverables.
title and desprition type last update

Project Website

A well-designed and highly functional website is critical to the success of NIGHTINGALE. We aim to have the NIGHTINGALE website up and running as soon as possible, but no later than 2 months. This wil maximise interaction between consortium members and R&D suppliers, stakeholders, media.

Programme: H2020-EU.3.1.4. - Topic(s): SC1-PM-12-2016

download deliverable 

Websites, patent fillings, videos etc. 2020-03-11

Communication Strategy

This deliverable consists of a precise description of the communication strategy for the project, including social media strategy and the ways in which the various stakeholders will be reached and involved.

Programme: H2020-EU.3.1.4. - Topic(s): SC1-PM-12-2016

download deliverable 

Documents, reports 2020-03-11

Dissemination of project results Phase 1

Since no preliminary results of the tender will be known at Month 9 yet, this deliverable encompasses the dissemination of the tender preparations so far

Programme: H2020-EU.3.1.4. - Topic(s): SC1-PM-12-2016

download deliverable 

Websites, patent fillings, videos etc. 2020-03-11

Market Consultation Documents (e.g., questionnaires, project presentations, etc.)

This deliverable is a package containing all relevant Market Consultation documents (e.g., questionnaires, project presentations, a summary of the meetings with R&D industry, etc.)

Programme: H2020-EU.3.1.4. - Topic(s): SC1-PM-12-2016

download deliverable 

Documents, reports 2020-03-11

Legal analysis document covering all legal aspects pertaining to the implementation of this PCP project

This legal analysis document will cover all legal aspects pertaining to the implementation of this PCP project

Programme: H2020-EU.3.1.4. - Topic(s): SC1-PM-12-2016

download deliverable 

Documents, reports 2020-03-11

Technical validation framework (sequential framework of how solutions will be validated in each particular phase)

In this document the process for validation of the proposed solution designs (PCP Phase1), validation of prototype systems originating from the procured R&D (PCP Phases 2 and 3) will be described in detail. It includes technical validation, bench testing, basic safety testing, validation in mobile healthy volunteers and testing of selected prototypes that have passed the initial test procedures in actual patients, both in the hospital environment (first stage) as well as after discharge to the home situation (phase 2).

Programme: H2020-EU.3.1.4. - Topic(s): SC1-PM-12-2016

download deliverable 

Documents, reports 2020-03-11

Promotional materials: brochures, leaflets, videos and follow-up on social media platforms

This deliverable contains all the promotional materials developed and used to disseminate the the NIGHTINGALE project with the aim of reaching all relevant potential R&D suppliers as well as all relevant stakeholders.

Programme: H2020-EU.3.1.4. - Topic(s): SC1-PM-12-2016

download deliverable 

Websites, patent fillings, videos etc. 2020-03-11

PCP Tender Package

This deliverable contains all the materials pertinent to the Tender as will be published on TED

Programme: H2020-EU.3.1.4. - Topic(s): SC1-PM-12-2016

download deliverable 

Documents, reports 2020-03-11